Integration Envelope inside the TPC INNER FIELD CAGE for new detectors John A. Scheblein Sr. Design Engineer STAR Technical Support Group May 16, 2008.

Slides:



Advertisements
Similar presentations
LycoCTC Drafting & Design Technology
Advertisements

© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Mechanical Gears Team Project. Teams You will be grouped into teams of four. Each team will have a Team Leader, Engineer, Graphic Designer, and Logistician.
SDC PUBLICATIONS © 2012 Introduction Learning Objectives: Basic Computer Aided Design and Computer Aided Engineering Terminology Development of Computer.
Section 5.2 Volumes. DEFINITION OF VOLUME USING VERTICAL SLICES Let S be a solid that lies between x = a and x = b. If the cross-sectional area of S in.
Implementing Autodesk Inventor in Your Company MA405-1
G.Barber Mice Tracker Integration Jun Tracker integration.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
How to Submit an Assignment after the Due Date. Click on “Courses” Tab.
HFT Safety --PXL detector September 26, Dana Beavis.
Rtizen ‘s Introduction to EDA Solutions It’s a software tool to make error free engineering drawings (both 2d & 3d) in a cost effective way.
MITCalc Mechanical, Industrial and Technical Calculations Training materials.
Speedstack: PCB Stack Up Data Exchange Using IPC-2581 Rev B
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
SDC PUBLICATIONS © 2012 Chapter 15 Design Reuse Learning Objectives: Understand the Design Reuse concepts Open AutoCAD DWG files in Autodesk Inventor Measure.
Computer Aided Design. Computer-aided design (CAD) is the use of computer systems to assist in the creation, modification, analysis, or optimization of.
Overview of 3D Parametric CAD: Applications in MAE 3 Dor Ashur Dr. Nathan Delson.
Introduction CAD. Design-Manufacturing Process Old (before computer era) Sketch with pencils Engineering Drawing with pencils Manufacturing.
Engineering 1182 College of Engineering Engineering Education Innovation Center Working Drawings Packet / BOM Rev: , AJPAssembly Drawings1.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
#SEU12 Madison Miner Software Engineer EDA, Inc..
ME 150 Engineering Drawing 1
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Engineering 1182 College of Engineering Engineering Education Innovation Center Solid Modeling Introduction Rev: , AJPSolid Modeling Introduction1.
9/19/2015IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 09 Solid Modeling.
AutoCAD ® 2004 by AutoDesk ® Binh Trang. Features AutoCAD® 2004 software introduces brand-new features  productivity tools and presentation graphics.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Design Graphics Mech 289 By Nabil Shalabi Jan 28 th 2008.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Engineering Drawings MeEn 476 Department of Mechanical Engineering Brigham Young University.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
3D Cube Design Challenge 3x3x3 AutoCAD Inventor
ENGINEERING DRAWINGS Deborah Munro, Ph.D.. What is a Sketch?  Provides visual information about a design  Usually isometric or perspective to give sense.
Reading Working Drawing Packets and Section Views
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Dimensioning part 1 with SolidWorks ENGR 1182 SolidWorks 08.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
Engineering Notebooks
Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
Robotics Engineering and Computer Aided Design By: Andrew Steele Mentor: Anthony Lapp, NASA Engineer Mentor Workplace: Johnson Space Center Teacher: Mrs.
RAMSDENTelecommunications Training RAMSDEN Telecommunications Training RTT75 Create Technical Documentation.
Reading Working Drawing Packets and Section Views
Presented by Tami Tyner
Crab Cavity Technical Coordination meeting:
Reading Working Drawing Packets and Section Views
Document 7/ Memorandum of Understanding (MOU)
ILC-EDMS presentation 3D Visualisation Documents sharing
More on Oracle Scripts CSC 240 (Blum).
Modern Graphics Communication
Industrial Technology
کارگاه آموزشی مهندسی معکوس
Design & Drafting Technology Unit 6
Working Drawings Packet / BOM
Name Blocks A first look at Autodesk Inventor
Dimensioning part 1 with SolidWorks
Assembly Drawings / Exploded Views
ELECTRICAL DISCHARGE MACHINING Special Process Instruction
Required “Copy Properties” option in 3D Model Sketch
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

Integration Envelope inside the TPC INNER FIELD CAGE for new detectors John A. Scheblein Sr. Design Engineer STAR Technical Support Group May 16, 2008 B.N.L. Bldg. 1006C

PREVIOUS SVT/SSD INSTALLATION

Quarter Section Interface Envelope  Drawing number SIM140 Rev “J”  Shown with the SSD & SVT

SIM140J

Quarter Section Interface Envelope for new detectors  Drawing number SIM140 Rev “K”  Shown without the SSD & SVT  First draft for new detectors integration  Will use the same procedure as L.B.N.L. to assign real estate

SIM140K

EAST SVT/SUPPORT DRAWING  Drawing number SIM181 Rev “E”  Will use this as the new detector integration drawing

East SIM181E SVT/SUPPORT ENVELOPE

EAST FTPC ENVELOPE DRAWING  Drawing number SIM212 Rev “B”  Shown with SVT  Will be used when the FTPC is replaced

East SIM212B FTPC ENVELOPE

Cone Assembly

I.R. REGION BETWEEN BEAMPIPE SUPPORTS

SSD There are no SIM drawings of the SSD envelope

Drawing numbering system  Suggest each institution use their own numbering and revision system.  Use a 4 character prefix. (BEMC, FTPC, etc.)  Let me know what prefix you decide to use for your subsystem.  Do not want to cross reference institution drawing number to STAR drawing numbering system that was done in the past.  How many new subsystems will be added?  Please keep me in the loop during the design.

Final drawings  All drawings to be done using ANSI Y14.5 and standard drafting practices  When job is completed each institution will deliver an electronic drawing list and the model & part files to BNL Star Technical Support Group  Preferred recommended formats: Autodesk Inventor Autodesk Autocad Solidworks DXF (minimum for 2-D)  Do have Pro-Engineer #M110 (11/8/07) Have not loaded it and do not have maintenance  Must have documented files sent to STSG

Please do not install any equipment into STAR without providing documentation to the STAR Technical Support Group  Sketches  Manufacturing drawings  Solid models  Photographs  Specifications  Have the drawings reflect the parts installed.

Some Photographs

Cone

BEAMPIPE SUPPORT

Why do we need accurate and up to date drawings of equipment installed into STAR? Because……

Resistor Chain……. Where is the documentation on this?

Another Resistor Chain……. Where is the documentation on this?

Resistor Chain documentation……. Where is the drawing for this resistor chain?

Questions? thank you

John Scheblein (631)