Target Report Introduction Chris Booth Sheffield 20 th November 2008.

Slides:



Advertisements
Similar presentations
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
MICE target stator: measurements & modelling Ben Shepherd MICE target workshop 13 May 2011.
Target Paper Status Summary 21 st December 2010 Chris Booth 1.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Jan '09Positron Target Status1 Positron Target Prototype - Status Leo Jenner.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
1 Optical Diagnostic Results of Hg Jet Target and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University Stonybrook.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
Prototype Status. 2 Status Update Safety Cage arriving soon Safety Cage arriving soon Torque transducer up and running Torque transducer up and running.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 Fringe fields for stage V Iouri Ivaniouchenkov, Jim Rochford RAL MICE Video Conference, 9 April 2003.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Mon Oct 27LC-ABD, Dundee1 Positron Target Prototype - Status Leo Jenner.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected.
Slides from talk by Prof. Mary Anne Holmes on the Earth’s Magnetic Field, July 18, 2002.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Three-phase Cage Rotor Induction Motors Resource 2 Three-Phase AC machines.
MICE Target - Risk Lara Howlett University of Sheffield.
ELECTROMAGNETIC CANNON Reporter: Hsieh, Tsung-Lin Taiwan.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Photon Conversion Target Wheel Eddy Current Simulations - Update Ian Bailey and Ayash Alrashdi Lancaster University / Cockcroft Institute.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
Pair-Production Target
MICE Target Report Video Conference 29/11/07
Status of Target Design
Presentation transcript:

Target Report Introduction Chris Booth Sheffield 20 th November 2008

Chris BoothUniversity of Sheffield 2 Organisation Weekly phone meetings –Sheffield, RAL (inc. MOM), Imperial –Notes on web (thanks Ken!) Design initiative –Shaft & bearings – see Jason's talk Verification & Diagnostics –Following slide Target workshop –Next week, at I.C.

Chris BoothUniversity of Sheffield 3 Verification and Diagnostics Magnetic measurement & simulation –Stator field map – Craig Mc Waters –FE Simulation – Paul Smith (prelim.) –Interpretation – Jim Rochford & Paul Smith Coil misalignments <0.2 mm Shaft stability –High speed photography – Paul H & Chris B –FEA – Wing Lau –Comparison of “rigid” and “foam rubber” mountings Lateral oscillations seen (at end of stroke?) “By eye” no major differences between mountings Camera data now with Wing, for proper analysis Nickel coated bearings –Tests in progress