Effluent Outfalls An Board Pleanala June 2009 Moville-G/castle Sewerage Scheme.

Slides:



Advertisements
Similar presentations
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Advertisements

Britannia Mine: Environmental Impact Study of Treated Effluent Discharge Lee Nikl.
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Coles Point Wastewater Treatment Plant
Greater Vancouver Regional District’s Liquid Waste Management Plan.
Planning Permission Process and Procedures
Water - Planning for the Future 28 th June 2012 East Midlands Councils Pete Davies, Senior Commercial Development Advisor.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
SUMMARY OF GALLATIN RIVER OUTSTANDING RESOURCE WATER (ORW) DESIGNATION Presented to: Water Pollution Control Advisory Council August 31, 2006 Presented.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
TRP Chapter Chapter 4.2 Waste minimisation.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Aberdeenshire Local Development Plan 2016 Identification of issues.
1 'Eco - Town' Andy Robinson East Area Have your Say.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Desalination, With a Grain of Salt: A California Perspective Desal Response Group Aquarium of the Pacific October 2006.
Towards sustainable urban freight transport Some reflections with results from RENAISSANCE Barry Ubbels (Panteia/NEA) Rotterdam, 12 October 2012.
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
Water Crisis in Gaza Strip A study of the Impact of Middle East Conflict upon Water Quantity and Quality in Gaza Strip By: Ayman H. Afifi Islamic University.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
City Manager’s Office Approval of Public Monument Policy City Council August 31, 2015 Item 20.
Hillsborough River Fecal Coliform BMAP Process Oct. 22, 2008.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Workshop and Information Session Mining Operations.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Robert Mc Donald 1 Moville/G’castle Sewerage Scheme An Overview of the Site Selection Process An Board Pleanala June 2009.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
Specific Applications Technical Reports Part II. Technical Reports Report structure is argumentative or chronological, what is the difference?Usually,
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
1 Ocean Disposal of Wastewater (An Introduction) by Prof. B. S. PANI I. I. T. Bombay, Mumbai.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
Antidegradation and Alternatives Analysis Mary E. Gardner Regulatory Programs Administrator Littleton/Englewood WWTP Colorado.
Experiences in ecosystem & natural capital accounting Glenn Marie Lange Earth Institute at the Columbia University.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
LOCAL AUTHORITY REGULATORY ASPECTS Paul Carroll Executive Scientific Officer Waterford County Council Integrated Constructed Wetlands Awareness Seminar.
-1 Instructor: Dr. Yunes Mogheir.  By considering the system variables as random, uncertainties can be quantified on a probabilistic framework.  Loads.
Review of Mixing Zone Studies Ben Cope EPA Region 10.
Welcome to…. The Boat Ramp Information Open Day Thank you for coming along. We are here to answer your questions.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Economic Valuation of Environmental attributes Larry Dwyer Qantas Professor of Travel and Tourism Economics School of Marketing University of New South.
Agnes Water Desalination Project Preliminary Studies – Aquatic Ecology John Thorogood and Kylie McPherson.
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: Fax: Kitikmeot Inuit Association Summary of Technical Issues.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Bow Basin Watershed Management Plan Revised Terms of Reference
Sustainable Development Goal for Water: Indicator 6.3.2
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Phase 2 Hope Bay Belt Project
Module 17: MIXING ZONES A limited area or volume of water where initial dilution of a discharge takes place and where numeric water quality criteria.
Cara Cowan Watts Graduate Student Biosystems Engineering
Western Orbital Local Liaison Forum 11TH September 2017.
STORMWATER MANAGEMENT
An example of Finland's approach to wastewater treatment for households in rural areas Kimmo Tiilikainen Minister of the Environment Finland
5. IMPACT ASSESSMENT WORLD CAFÉ: ALTERNATIVES ANALYSIS
Assessing Vulnerability & Climate Change Impacts
Bathing water profiles in the Netherlands
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Wrap up of agenda item no. 3
Presentation transcript:

Effluent Outfalls An Board Pleanala June 2009 Moville-G/castle Sewerage Scheme

2 Background to this Proposal 1990 Members of DCC Unanimously Agreed: Discharge of effluent & Plant would be sited outside the Lough regardless of level of treatment Modelling Study: DCC stated that the sewage loading must receive a high standard of treatment & that the outfall must lie outside the entrance to Lough Foyle.

3 The Comparison Site A Northwest of Moville Site B Carnagarve Site C East of Greencastle

Potential Outfalls Considered A B C

B C

6 Relevant Reports The Nov Preliminary Outfall Report Compared 2 outfall site; Carnagarve & Portavela January 2005 Site Selection Report Compared 3 sites; Breda Glen, Carnagarve & East of Greencastle

Relationship Between 04&05 Reports 2004 Outfall Report 2005 Site Selection Report EIS Conclusions INPUT

8 How Reports Influenced Each Other Authors of 2004 Outfall Report were made aware that... Site A at Moville had been eliminated on economic grounds. (And more importantly) That JB Barry would be recommending Site B at Carnagarve in their forthcoming 2005 Site Selection Report..

Outfall Report “Following a detailed technical, environmental and economic evaluation of these sites JBB recommended site B, approximately midway between Moville and Greencastle as the preferred site for the new wastewater treatment works”

10 Other Influences on the Outfall Report “Donegal County Council has indicated that they consider the beaches around the Golf Course to be important recreational assets…” Photo Input of DCC into Outfall Selection Report is significant and inappropriate

12 Other Influences on the Outfall Report “Donegal County Council has indicated that they consider the beaches around the Golf Course to be important recreational assets…” “The potential impacts on the small pocket beaches around both of the outfall locations under consideration are likely to be similar therefore any preference between the two locations will depend on the relative significance DCC attaches to the two beaches”. Run Input of DCC into Outfall Selection Report is significant and inappropriate

Outfall Report – Water Quality (Outfall at Carnagarve) Have insignificant impact on southern coastline

Outfall Report – Water Quality A short outfall discharging secondary treated effluent at Carnagarve poses “a significant risk that the guideline limits of the bathing waters directive could be exceeded along the shore where there is a public car park and costal walkway”.

15 Water Quality in 2004 Outfall Report “There is significant potential for sewage discharge in this area to impact on shellfish operations in Lough Foyle if the process and outfall are not designed correctly” However this impact “is likely to be less than that of the present untreated wastewater discharges from Moville”

16 Conclusion of the 2004 Outfall Report “…there is very little to differentiate between the two sites in terms of either marine construction or water quality issues. The slight advantage of site C in terms of potential impact on shellfish operations is balanced by slight advantage in terms of construction afforded to site B due to its more sheltered nature”. Run One of the final statements in the conclusions of this report states that…

Proposed Outfall Location B B1

18 Outfall B1 at Greencastle No outfall outside the Lough included in EIS EIS has no real outfall alternatives The two outfall locations in EIS driven by plant location. Finding the optimum outfall was never a priority

19 Why Include Outfall B1 It is accessible from the Carnagarve site To give the EIS the facade of completeness B1 is closer to sites outside the Lough B1 adds an additional €.5m to the Carnagarve costs Carnagarve more expensive than processing and discharging outside Lough Inappropriate alternatives to present to ABP

20 Carnagarve Outfall Restriction Current outfall location is restricted to 300m Same restriction doesn’t apply elsewhere Previous modelling outside Lough at 600m Previous modelling off Moville at 600m Mixing zone at end of outfall pipe Carnagarve mixing zone near beach & over shellfish beds Carnagarve has onshore drift Whatever is in mixing zone will come ashore

21 Residue of Seaweed on Beach

22 Slick Edging Ashore at Carnagarve

23 Ammonia Modelling Ammonia is detrimental to fish life. No modelling for ammonia undertaken. So why was ammonia ignored in the EIS?

24 Previous Modelling Previous studies included ammonia modelling “Total ammonia concentrations are expected to exceed the guideline level for salmonid fish in the area between the outfall and the coast”

25 Outcome of this Analysis Long term strategy not evident No attempt to find the optimum outfall No real consideration for the Lough as the most important resource in this area Openness & partnership not widely displayed No realisation of the effects this project had

Effluent Outfalls An Board Pleanala June 2009 Moville-G/castle Sewerage Scheme