North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee River Management Coordinating Council September 24, 2007
Agenda Project Status and Summary Operations Report Questions?
Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir CERP Proposed Storage and Flow-way Improvements
L-8 Reservoir – August 2007
L-8 Reservoir – Temporary Pumps
M Canal Widening Control #2 Pump Station G-161 Northlake Bridge G-160 Flow-way #1 Grassy Waters Preserve – M Canal
Control #2 Pump Station
M-Canal Widening Improved Section Unimproved Section
Grassy Waters Preserve – M Canal M Canal Open Cut to Interior
G-161 Northlake Boulevard Structure
Northlake Bridge Structure
G-160 Loxahatchee Slough Structure
Flow-way #2 CGCDD Flow-way ITID Flow-way Mecca Farms Flow-way C-18W Improvements
Coordination with Local Government Agencies Conceptual Sector Plan Mecca Farms
Indian Trail Improvement District – Outfall Canal
Indian Trail Improvement District – MO Canal
Indian Trail Improvement District – MO and L Canal
J.W. Corbett WMA – Southeast Area
Canal C-18 West - Improvements
Flow-way #3 NineGems Restoration Culpepper Ranch Improvements Storage or Wetland Restoration Cypress Creek Improvements
Flow-way #3
Control #2 Pump Station G-161 G-160 Periodic Operations Report for Flow-way #1 Structures L-8 Reservoir S-46 G-92 Lainhart Dam
G-160 Periodic Operations Report for Flow-way #1 Structures S-46 G-92 Lainhart Dam
G-92
S-46
G-160
Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir Summary
Questions?