FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Transparency and Domestic Regulation Mina Mashayekhi Division on International Trade UNCTAD.
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
10 th Adjudication Update Seminar ADJUDICATION FOLLOWING THE LATHAM REVIEW Graham Watts Chief Executive Construction Industry Council Chairman,
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
A regulatory framework for gas quality treatment facilities: recap and update.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
DfES/MIAP Unique Learner Number Consultation: 1st December th March Briefing on the consultation into the feasibility of the Unique Learner.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
MARINE STRATEGY FRAMEWORK DIRECTIVE (MSFD) STRUCTURE OF PRESENTATION Summary of MSFD Requirements; EU project management arrangements; Descriptors of most.
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
BWEA Offshore Wind Conference – March 26-27, 2003 Information – The Other Renewable Resource Building on Success Presented at the BWEA Conference
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
Spatial planning in the marine environment Gillian Glegg and Jonathan Richards.
The Crown and Suppliers: A New Way of Working People & Security15:35 – 16:20 Channels & Citizen Engagement Social Media ICT Capability Risk Management.
Care Act Norfolk Older Peoples Strategic Partnership Board 18 June 2014 Janice Dane, Assistant Director Prevention and Transformation.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
SEN and Disability Green Paper Update on draft legislation and pathfinder programme.
National MSP in the Mediterranean Sea: Spain (and Portugal)
BWEA OFFSHORE 2003 Round 2 Procedures and Criteria WORK IN PROGRESS.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Setting the context Christine Lenehan Director CDC.
Marine Planning: The role of the MMO and Partnerships Steve Brooker Head of Marine Planning.
Rationale for the changes Proposals for change were consulted on through ‘Raising expectations: Enabling the system to deliver’ White Paper published in.
UK Wide Core Skills & Training Framework Findings of 2 nd Stage Consultation and Implications for Development of the Framework.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
CREATION OF AN OFFSHORE GRID INFRASTRUCTURE Presentation to BWEA Offshore Wind Conference, 4 March 2004 Richard Mellish, DTI.
V5 p.1 Consultation Period Offshore Electricity Transmission – milestones (1) Apr - JuneJuly - SeptOct - DecJan - Mar KEY: 2006/7 Initial Framework Oct/Nov.
Process of a Bill Parliamentary Law Making – Legislative Process © The Law Bank Parliamentary Law Making Process of a bill 1.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
Local Government Reform in the Wellington Region Council Workshop - 18 April )Invitation from Greater Wellington Regional Council 2)Preparation for.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework “Training the Trainers” November 2008 RIA in the EU by Lydia Jørgensen, Senior.
The Marine Bill. The Bill covers... Marine Management Organisation Marine planning Streamlined marine licensing Nature conservation Improved inshore fisheries.
Review of Sub-National Economic Development and Regeneration.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Marine Renewables Marine Renewables and integrated planning Mike Neilson Director, Marine Scotland Scottish Government.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Marine Planning update Steve Brooker Head of Marine Planning.
St Austell & Surrounding Parishes Town Framework: Statement of Community Consultation Community Network Panel 3 September 2014.
1 - DG ENV Brussels, 5 March 2003 Draft INSPIRE Legislative proposal The key issues 9th INSPIRE Expert Group Meeting Brussels.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Planning Scotland’s Seas consultation Seas Consultation 2013.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Pre-application process in England and Wales Sixth meeting of the Task Force on Public Participation in Decision- making under the Aarhus Convention
Industry Dialogue on xoserve Services 14 th September 2007.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
SECTION 106 UPDATE DARREN WILDING DCLG. S106 - LEGISLATION Section 106 of the Town and Country Planning Act 1990 restricts the development or use of the.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
IMPLICATIONS OF THE HIGH COURT JUDGMENT IN THE MATTER BETWEEN EARTHLIFE AFRICA JOHANNESBURG V MINISTER OF ENVIRONMENTAL AFFAIRS AND OTHERS IN RESPECT OF.
Policy workstreams Craig Mallett Miriam Eagle.
FlorenceForum November 2008
Transmission Workgroup 4th October 2012
Outcome TFCS-11// February Washington DC
DG Environment, Unit D.2 Marine Environment and Water Industry
Outcome TFCS-11// February Washington DC
Local Asset Management Pilots Scheme
UK Marine Planning and the Ecosystem Based Approach
Gas Regional Initiative Update on progress and latest developments
Proposed Transitional Gas Exit Arrangements
Update from Marine Scotland November 2018
Fitness Check of EU Freshwater Policy
Finalisation of study report
Finalisation of study report
Presentation transcript:

FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003

ENERGY GROUP Purpose of talk Highlight main issues arising from the consultation Indicate how they will be taken forward In particular, report progress on SEA

ENERGY GROUP 107 responses received Developers, including trade associations – 23 Marine users – 12 Environmental, heritage & countryside organisations – 26 Local authorities, regional organisations – 16 Electricity companies, regulatory bodies – 10 Others, including academics & legal firms - 20

ENERGY GROUP New legislation – consultation views Strong support for early legislation to enable developments to take place outside territorial waters Environmental groups would prefer legislation to be part of a comprehensive and integrated framework for the marine environment White Paper confirms that legislation will be brought forward as soon as possible

ENERGY GROUP Items expected to be covered in new legislation Setting up a “Renewable Energy Zone” beyond territorial waters for renewable energy projects; Giving responsibility to the Crown Estate for the issue of sea bed licences in the Zone; Extending the legal framework in territorial waters to the Zone eg section 36 Electricity Act consents; Providing a statutory regime for safety zones; possibly extinguishing rights to navigation in the Electricity Act.

ENERGY GROUP The allocation of rights in Round 2 & future rounds – consultation views General support for the tender assessment process outlined in Future Offshore. Developers concerned about the proposal to offer leases in fixed, geographically defined regions, following SEA. Others – eg environmental groups, NGC – support this proposal. Miscellaneous points made on the proposed boundaries of the 3 strategic regions.

ENERGY GROUP The allocation of rights – consultation views (continued) No clear view on the frequency of rounds: environmental groups tend towards a three year cycle whilst developers favour greater frequency General agreement that leases should specify timetables for implementation of projects No consensus on whether other renewable technologies should be covered within the same planning framework.

ENERGY GROUP How will next rounds proceed? Round Two will be based on the three strategic areas (subject to small extension of Greater Wash boundaries) Design of the Round will be agreed between Crown Estate and DTI, taking into account – Responses to consultation – Registrations of interest – SEA Environmental Report

ENERGY GROUP How will next rounds proceed? (continued) Once Round Two under way, DTI & Crown Estate will discuss with BWEA, SEA Steering Group, etc – Taking forward SEA process – Timing and geographical areas of subsequent rounds

ENERGY GROUP SEA – views of environmental groups Concerns that the process is being implemented too quickly Widely held view that a national scale SEA is needed to inform decisions on the best strategic areas for development Only a few calls for a moratorium on further development, but wide support for a precautionary approach to sites where data is unavailable and impact uncertain Analysis of cumulative impact seen as crucial

ENERGY GROUP SEA – views of wind industry Value of SEA process recognised Do not want the timetable to slip Believe rigid application of precautionary principle would be counterproductive Concern that positive environmental benefits of wind energy may not be adequately recognised

ENERGY GROUP SEA – Timetable Environmental Report will be published in draft at the end of April. Four week public consultation during May. Report will be finalised at end of May in order to inform Round 2 which will follow in June. Progress can be monitored on

ENERGY GROUP Responsibility for offshore cables 1. Offshore developers remain responsible for offshore connections to onshore, as now. 2. Extend responsibilities of onshore network operators to offshore, but maintain existing charging arrangements. Offshore developers would then have choice of providing connections themselves or receiving regulated cost-reflective connections. 3. As 2, but adjust the regulatory charging regime so that network operators could recover costs from other customers. Consultation clarified that there are three options:

ENERGY GROUP Responsibility for offshore cables (continued) No consensus of views on the best way forward Similarly no consensus on whether a new regulatory regime is needed for third party access. A few respondents call for a co-ordinating strategy for offshore network infrastructure Clear that this is a key issue for the future

ENERGY GROUP Conclusions Consultation response generally supports the proposed way ahead although much comment on detail Summary of responses, and Department’s conclusions, will be published in the summer SEA process is well under way Round Two is in active preparation Legislation will be introduced as soon as Parliamentary time allows Key issues for longer term include taking forward the SEA process; the design of future rounds; and responsibility for offshore cables.