Business Logistics 420 Public Transportation Lecture 20: Transit System Design.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Welcome! RGRTA Title VI & Public Participation Plans.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Hertfordshire Congestion Topic Group 11 June 2010.
Capacity, Level of Service, Intersection Design (1)
Basics of Bus Routing 65 th Annual FAPT Summer Symposium June 24, 2013 Punta Gorda, FL. Presented By: Jamie Warrington FL. Dept. of Education Transportation.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Network Design Unit 4: Service Planning & Network Design.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
Transportation leadership you can trust. presented to Regional Transportation Plan Guidelines Work Group Meeting presented by Christopher Wornum Cambridge.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
Lecture 5 Bus Rapid Transit, ridership estimation procedures and headway requirements Dr. Muhammad Adnan.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Vehicle Flow.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lec 3, Ch. 2 Transp Systems & Organization Understand the nation’s transportation system is the result of independent actions (through reading) Understand.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Chapter 11 Mass Transit.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Design Speed and Design Traffic Concepts
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Bus Management System in SEOUL Metropolitan Area.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
GeniUS! Challenge #4 - Utilising footfall & transport 15/3/12 Andy D’Agorne.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Business Logistics 420 Public Transportation Lecture 18: Demand Forecasting.
Intersection Design Spring 2015.
TRB 88th Annual Meeting, Washington DC January, 2009 Huan Li and Robert L. Bertini Transportation Research Board 88th Annual Meeting Washington, DC January.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Transportation Concurrency The provision of “adequate transportation facilities” Integrating land use and transportation.
Business Logistics 420 Urban Transportation Fall 2000 Lectures 6: Coping with Edge City Transportation Problems: Livable Cities, Transit-Friendly Land.
Envision Central Texas Presentation Cellular Mass Transit (CMT) by Richard Shultz Concerned Citizen March 24, 2008.
RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Vehicle & Crew Scheduling Unit 5: Staff & Fleet Scheduling.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Design Vehicle CE 453 Lecture 6. 2 Design Vehicle ► Design Vehicle – largest (slowest, loudest?) vehicle likely to use a facility with considerable frequency.
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Transit Pricing Programs Value Pricing for Transportation in the Washington Region June 4, 2003 Richard F. Stevens Washington Metropolitan Area Transit.
30th CAITR University of Western Australia December 12, 2008 Robert L. Bertini and Huan Li Conference for the Australian Institutes of Transport Research.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
(is it necessary?) By: Tim Torrini per. two Ramp meters are the “stop and go signals located at the entrance ramps of freeways to regulate the amount.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
+ Facilities and Transportation VCSD Strategic Plan.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
CE Urban Transportation Planning and Management Iowa State University Calibration and Adjustment Techniques, Part 1 Source: Calibration and Adjustment.
Making Headways Smart Card Fare Payment and Bus Dwell Time in Los Angeles Daniel Shockley Fehr & Peers Julia Salinas Los Angeles Metropolitan Transportation.
12/08/ J/ESD.204J1 Real-Time Control Strategies for Rail Transit Outline: Problem Description and Motivation Model Formulation Model Application.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
9.6 Turning Roadways and Channelization, Types of Turning Roadways p.9-55 ~ 9-92 Lean how to determine minimum edge-of-traveled- way radii for the.
MODULE 4, LESSON 5 Developing Service: Calculating Capacity.
MODULE 4, LESSON 2 Fundamentals of Transit Service and Networks.
Intersection Design Spring 2017.
T-Share: A Large-Scale Dynamic Taxi Ridesharing Service
Network Characteristics
Service Routes and Community Transit Hubs: Right Sizing Transit
Developing Service: Measuring Quality of Service
Network Characteristics
Presentation transcript:

Business Logistics 420 Public Transportation Lecture 20: Transit System Design

Lecture Objectives To understand the basic elements of transit system design To appreciate the different transit system route configurations To know the basic principles of good route design To understand other aspects of system design such as schedules, stop location

Elements of Transit System Design Overall system -- route interrelationship Individual route design Scheduling Stop locations Vehicle Selection

System Considerations Service area definition Location of major generators Route pattern -- network –Radial -- circumferential –Grid -- rectangular –Combination –Irregular Route spacing Transfers -- inter and intra modal Marketing considerations

Chicago Loop -- Grid Network

Washington Metro -- Radial

CATA -- Radial System

ATA -- Bradford, Pa -- Irregular

Route Design Guidelines Use direct routing where possible Through routing is preferred to cycle routing Reverse or loop routing should be used sparingly Routes should begin and end at major generators

Route Design Guidelines (Continued) Routes should be spaced about 1/2 mile apart Routes should provide direct service -- circuity ratio (actual route miles/direct auto travel) should not exceed 1.33 Initial route design assumes average speed of 12 miles per hour

CATA - P Route -- Through Routing

CATA C Route -- Poor Circuity

CATA -- CS Route --Reverse or Loop Routing

Factors Influencing Route Design Demand –spatial arrangement –special generators Urban environment –street network (one-way streets) –congestion Management Considerations –driver scheduling –labor rules

Factors Influencing Route Design (Continued) Intermodal Coordination –Rail/bus/paratransit –Intercity facilities (rail, bus, air) Political Considerations –Equity –Pressure

Scheduling Considerations Two major issues –Headway – time between vehicles Ex: 15 minute headway represents four buses per hour –Timing of arrivals at points along the route Factors to consider –quality of service (frequency) –transfers –easy memorization –driver labor requirements

Scheduling Considerations (Continued) Setting headways –Maximum headway (fewest minutes between vehicles) set based on capacity needed to meet demand –Minimum headway based on policy decisions, e.g., all routes should have no less frequent service than 30 minutes in the peak and 60 minutes off peak

Scheduling Considerations (Continued) Setting arrival times –Independent scheduling Most common approach OK if short headways, but may cause transfer problems if long headways –Pulse scheduling – timed transfers Attractive approach for systems with long headways Improves service quality Hard to implement due to space constraints at stops and variability of travel times

Stop Locations Operations –location (Near side, far side, mid block) –peak number of buses at stop at any given time Quality of service –near destinations –spaced 750 ft or more apart to maintain operating speed –adequate waiting area -- shelter

Stop Locations (Continued) The urban environment –parking restrictions –turns Special concerns in “Edge City,” “big box” environment –bus stop near store entrances rather than across sea of parking –circuity concerns if store too far from road

Vehicle Selection Size of vehicle –Peak loads (goal to provide 5 sq ft/psgr so 8 x 40 ft bus = 320 sq ft or 64 passengers max. –Traffic conditions street width turning radius Number of vehicles –Peak hour requirement plus 10% spares

Miscellaneous System Design Issues Special service types –“freeway flyers” –skip stop operation –local vs express New service types –service routes (fixed-route with deviations) –paratransit feeder services

Study Questions What are the major aspects of transit system design? What are the basic types of transit route network configurations? What are the basic route design guidelines? What are “good” route designs? What are “poor” designs? What factors influence scheduling decisions?

Study Questions (Continued) What factors are important when selecting vehicle size and numbers? Pick up a CATA Ride Guide in the HUB, Kern, or inside the doors to Willard (“new” building side on Pollock Rd.) to serve as reference for this lecture