Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004.

Slides:



Advertisements
Similar presentations
1 User Perspective on Deploying 511 Al Kosik Director, Traffic Management Section TxDOT National Transportation Operations Coalition Talking Operations.
Advertisements

Emerging Growth: Mid- Decade Economic Trends University of North Texas Center for Economic Development and Research December 2014.
Proposition 1 Formula Distribution Proposal for FY 2015 PRELIMINARY CONCEPT PROPOSITION 1 FORMULA DISTRIBUTION PROPOSAL FOR FY 2015 TxDOT/Stakeholder Working.
TEXAS TRANSPORTATION August 2012 The Honorable Larry Phillips Chairman, House Committee on Transportation.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Building Transportation at over 10,000 feet: Narrow Gauge Railroads in the San Juan Mountains of Colorado Brittany Price Project Spring 2003.
Meade County Experience with Alternatives to Paving Ken McGirr Meade County Highway Supt Sturgis, SD.
Adding Priced Capacity for Congestion Relief Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Current as of: Feb.06, New Economic Recovery Package: Not the Cure Federal government is working on a one-time economic recovery package Package.
Corridor #5 Update United States Senate Briefing September 26, 2007.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Oceanside-Escondido Rail Line Final Project Presentation John R. VelascoMay 12 th, 2003.
1 Lei Xu Term Project Presentation – CVEN 689 – Spring 2005 CVEN 689 – SPRING 2005 LEI XU May 2th, 2005 hide A GIS-BASED STUDY OF HOW THE HOT LANE IMPLEMENTATION.
GreenSTEP Statewide Transportation Greenhouse Gas Model Cutting Carbs Conference December 3, 2008 Brian Gregor ODOT Transportation Planning Analysis Unit.
December 11, 2007 Michael Morris, P.E., Director of Transportation North Central Texas Council.
Harris County Office of Homeland Security & Emergency Management Hurricane Rita Evacuation of a Major Urban Area 6922 Katy Road, Houston,
Houston Transportation Noella Cantu Chelsea Serrano-Piche Garrett Taylor ARCH 5502 Urban Design Studio Fall 2010.
Greg Cenac Steve Haik Ross ChapmanRonnie Harris Perry DufreneMarc Mergen Ivan EchegarruaKen Robinson Mike GrayDan Sleker Harold Yeldell TRANSPORT NETWORKS.
Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State Our roads are used by you to get to work,
Investing in the Extension to Lessen the Congestion And other Benefits to Extending Metro out to Dulles.
The Looming Transportation Crisis May 2008 T he L ooming T ransportation C risis.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
The Roads Ahead Leroy D. Alloway, Director Community Development.
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Chapter 1 Section 1 What Will Texas Be Like When You Are 20? Copy the notes in red into your composition book.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
BORDER-TO-BORDER TRANSPORTATION CONFERENCE 2007 POTENTIAL PUBLIC & PRIVATE PARTNERSHIPS.
Trans-Texas Corridor: A Public Private Partnership Texas Department of Transportation AASHTO Spring Board of Directors Meeting May 9, 2005 Michael W. Behrens,
Comprehensive Transportation Plan Burnet County Transportation Plan Overview Presented to Burnet Transportation Committee on June 18, 2008 by Brian.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Self-Supporting Truckways: Closing the Gap in Financing Expanded Goods Movement By Robert W. Poole, Jr. and Peter Samuel.
Texas Transportation Commission October 25, 2012.
Texas Freight & Rail Studies Mark Werner, P.E. Transportation Planning & Programming Multimodal Section.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Southern Bridge Project Brown County Executive
Investing in the Extension to Lessen the Congestion And other benefits to extending the Dulles Toll Road.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Interstate Tolling: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Chapter 19 Politics & Progress.
INTERNATIONAL TRADE DATA AND ASIAN TRADE ON THE TEXAS – MEXICO BORDER A Presentation to the Texas Border Partnership Working Group September 9, 2006 by.
The Mobility Authority Story: Building for our Future.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
HOT Lane Discussion Sept 4, CA 91 (LA Area) I-15 (San Diego) Some HOT Lane Examples.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Health Literacy: Helping Your Patients Understand and Ethical Dilemmas in Geriatric Care.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Geometric Design: General Concept CE331 Transportation Engineering.
1 National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
Fort Worth to Houston Corridor Expressway Concept
Transportation and Industry – Railroads come to Texas
Texas Demographic Trends and Water
Water.. The Highway to Texas’ Future
TRANSPORTATION SUMMIT
Southern Bridge Project Brown County Executive
Presentation transcript:

Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004

Also by Erik Slotboom FireRicWilliamson.comHoustonFreeways.com Founded by Erik Slotboom: TexasFreeway.com

Trans-Texas Corridor Overall Conclusions Only one corridor may justify a relief route: I-35, San Antonio to Hillsboro Existing Interstates are adequate in all other cases Some sections of existing Interstates will need a 3 rd lane in each direction by 2034 Trans-Texas corridor cannot be justified

How much traffic can existing Interstates handle? Approximate

Typical 4-lane Rural Interstate Interstate 35W South of Fort Worth

Typical 4 lane Interstate How much traffic can it carry? Vehicles/day RuralI-35 S of Waco I-45 S of Huntsville 56,000 45,000 UrbanI-45 S of Conroe US 59 Sugar Land (1999) I-820 Fort Worth 102, , ,000 A 4-lane freeway can serve > 100,000 vehicles/day with reduced service

Typical 6-lane Interstate I-35 North of New Braunfels

Typical 6 lane Interstate How much traffic can it carry? Vehicles/day RuralI-35 N of San Marcos 76,000 Urban I-10 West Houston Loop 1 Mopac Austin 220, ,000 A 6-lane freeway can serve > 200,000 vehicles/day with reduced service

Implied Tran-Texas Corridor Traffic 6-lane Trans-Texas 10-lane Trans-Texas Existing Interstate 50,000 Trans-Texas + 100, ,000 Total Traffic150,000250,000

What kind of traffic counts do we have in 2003? Is it anywhere approaching Trans-Texas capacity?

2003 traffic data Source: TxDOT

Existing traffic volumes are easily handled by existing 4-lane Interstates Will traffic grow to Trans-Texas proportions?

Interstate 10 Houston to San Antonio 2003 Traffic Data

Interstate 45 Houston to Dallas 2003 traffic data

Interstate 35 San Antonio to Laredo “NAFTA Corridor” There has not been a NAFTA traffic boom Traffic counts stagnant since traffic data

NAFTA Influence Strong growth in 1990s Stagnant since 1999 Traffic Count still very low

Interstate 69 Corridor Can it justify a Trans-Texas corridor? NO. A conventional 4-lane interstate will serve traffic needs 6-lane sections needed approaching Houston

2003 traffic data

Interstate 35 San Antonio to Hillsboro The only corridor that could possibly justify something resembling a Trans- Texas corridor Original TxDOT plan: widen existing facility to 6 (rural) and 8 (urban) lanes

2003 traffic data 4-lane sections south of Hillsboro need added lane in each direction immediately Expansion on hold pending Trans-Texas plan I Status

Financial Case Study What if we build a Trans Texas Corridor from Georgetown to Hillsboro? This is the only corridor section that has a remote chance of being viable

How Much Would It Cost? Construction$1.38 billion$28.2 million/mile Right-of-Way$300 million (est.) $6 million/mile Compare to SH 130, Austin to Georgetown: 6 lanes, 102 miles Assume a minimal Trans-Texas corridor, 4 highway lanes only but on a wide corridor Cost per mile110 miles Construction$20 million$2.2 billion Right-of-way$4 million$440 million 2.64 billion Other costs.11 billion Total2.75 billion

How Much Traffic Will Use It? Compare to Hardy Toll Road / I-45 Corridor in Houston to determine I-35 / Trans-Texas split Interstate 45 north in Houston is one of the most heavily loaded freeways in the United States (per lane-mile)

Conclusion Toll road traffic has been consistent at 15% of corridor traffic in spite of severe congestion on I-45 Motorists will endure severe congestion to avoid tolls

Analysis Assumption Toll percent of corridor traffic stays low until I-35 is severely congested I-35 Traffic Vehicles per day Toll Traffic as % of Total <75,00010% 75, ,00040% of traffic over 75,000 >100,00080% of traffic over 100,000

Other Assumptions No capacity improvements to I-35; 4-lane sections remain 4 lanes forever $10 toll Georgetown-Hillsboro ($.09/mile) increasing at 3% per year 10% corridor traffic increase after 20 years due to induced demand Assume 4.5% interest, 40 year term on $2.75 billion in bonds. Annual Payment: $149 million

Financial Shortfall About 25 years of subsidy required Where will the money come from?

Toll Interstate 35!

Conclusion Tolling existing rural interstates is the only way to make any Trans-Texas corridor viable –Bribe rural counties with a cut of the money to defuse rural opposition

Other Financial Risks High gasoline cost – lower traffic counts Faulty assumptions (eg NAFTA) Lower than forecast population growth Predominantly Hispanic population –Hispanic regions most anti-toll –Lower income groups can’t afford tolls

Slower Population Growth? Dallas Morning News, October 4, 2004

NAFTA: what happened? 1990s assumption: future traffic boom 2000s reality: Everything is being made in China Result: Flat traffic volume to Mexico

Alameda Corridor in Los Angeles Paying the Price for Faulty Assumptions $2.5 billion spent on rail line Now it is grossly underutilized “In the nearly two decades it took to plan and build the corridor, the shipping business changed so dramatically that the economic assumptions underpinning the project became obsolete.” L.A. Times, August 22, 2004

A Better Way to Meet Our Needs Add extra lanes to existing interstates as needed Rebuilding a 4-lane interstate to a 6-lane interstate costs about $10 million per mile, half the cost of a Trans-Texas corridor

Actual needs in the next 30 years Can be done WITHOUT TOLLS

The Engineer Says Traffic counts can’t even remotely justify Trans-Texas Corridor The Financial Analyst Says Tolling will only pay a tiny fraction of the cost for decades The Concerned Texan Worries about steep tolls on existing Interstates to pay for it

Trans-Texas Corridor