The CSX Railroad Relocation and East- West Transportation Corridor Study US DOT RITA Briefing Presentation Mississippi State University Chuck O’Hara January.

Slides:



Advertisements
Similar presentations
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Advertisements

1 Planning and Environment Linkages: Case Studies Michael Culp and John Humeston FHWA November 2, 2006.
The Alameda Corridor: Lessons Learned Presented to: UCI Conference on the New Generation of Transportation Financing in California Costa Mesa, CA Gill.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
National Consortia on Remote Sensing in Transportation – Environmental Assessment ICF Consulting.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Connecticut Department of Transportation Bureau of Policy & Planning.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Overview of SAFETEA-LU Sections 6001, 6002, 3005, and 3006 TRB January 13, 2008 Shari Schaftlein FHWA Project Development & Environmental Review Washington,
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Dallas County Area Transportation Projects Update Dallas County Commissioner John Wiley Price.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Federal Railroad Administration Karen McClure, Economist
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
MMS Alternative Energy Program November 28, 2007.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
1 SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY Municipal Meetings September 2006.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Texas Freight & Rail Studies Mark Werner, P.E. Transportation Planning & Programming Multimodal Section.
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
2015 Emerald Coast Transportation Symposium Stephanie Lane, Director CSX Industrial Development November 13, 2015.
USA Parkway Project Welcome Public Information Meeting to the
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
PURPOSE & NEED Categorical Exclusion Training Class.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Willow Meadows Civic Club Meeting September 13, 2011
Michigan Update Michigan Association of Rail Passengers
Draft Transportation Element September 6, 2017
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Corridor Light Rail Transit Feasibility Study
Chicago to Council Bluffs-Omaha
Presentation transcript:

The CSX Railroad Relocation and East- West Transportation Corridor Study US DOT RITA Briefing Presentation Mississippi State University Chuck O’Hara January 12, 2006

Mississippi Gulf Coast Assessment The Gulf Coast includes dense urban areas intermixed with designated natural areas, which serves to limit, guide, and even constrain development within the area.

Coastal Changes and Strained Transportation Infrastructure Over the past 30 years, considerable changes in land use, population, and demographics have affected socio-economic and environmental conditions as well as wildlife habitat. During that 30-year time frame Interstate 10 (I-10) was completed and the coastal communities have evolved from small fishing communities (with a total population of around 240,000 in 1970) to a complex mixture of residential, commercial, industrial, and resort areas. A dramatic 50% increase in population and associated urbanization has resulted in a strained transportation infrastructure.

Railroad Relocation and New East West Corridor Study The CSX Relocation EIS was funded by congress and initiated not only to study the relocation of the CSX, but also with the significant purpose of providing a new east-west highway along the Mississippi Gulf Coast by relocating the existing railroad right-of-way out of populated areas, business districts, and tourism locations along the coastline. Omnibus Consolidated and Emergency Supplemental Appropriations for Fiscal Year 2001 (P. L ) Sec Notwithstanding any other provision of law, in addition to funds otherwise appropriated in this or any other Act for fiscal year 2001, $4,000,000 is hereby appropriated from the Highway Trust Fund for Commercial Remote Sensing Products and Spatial Information Technologies under Section 5113 of Public Law , as amended: Provided, That such funds are used to study the creation of a new highway right of way south of I-10 along the Mississippi Gulf Coast by relocating the existing railroad right of way out of downtown areas.

CSX Relocation EIS A project was undertaken (DMJM+Harris Notice to Proceed: 11/26/2002) in the coastal counties of Jackson, Hancock, and Harrison in Mississippi to assess relocating segments of the existing CSX railroad out of populated areas.

Improved railroad operation on a faster, safer route Improved highway safety through elimination of grade crossings Elimination of traffic delays caused by train movements Removal of hazardous rail shipments from densely populated areas Separation of passenger and freight rail traffic and potential development of a dedicated high-speed rail line Reasons for Relocating CSX Anticipated benefits include the following:

78 incidents reported during the five-year period from 1997 through at crossings with crossbucks only 28 at crossings with stop signs 24 at crossings with flashing lights 12 at crossings with automatic gates Railroad Grade Crossing Incidents 160 at-grade rail-highway grade crossings in Hancock, Harrison and Jackson counties

Railroad Grade Crossing Incidents ( )

Mississippi Gulf Coast Railroad Relocation Study and Environmental Impact Statement August 28, 2003 Mississippi State

DMJM+ Harris EIS Project Team The EIS contractor team was charged with identifying best feasible corridor(s) for relocation of the CSX railroad in Mississippi and demonstrating the application of remote sensing technologies to environmental analysis for transportation planning projects. At the onset of the project, it was the intent of FHWA, MDOT, and the selected consulting team conducting the EIS to take the best corridor alternates forward to engineering design and for the preferred corridor to obtain necessary environmental clearances (based on EIS and Record of Decision).

DMJM + Harris Proposed Planning Approach Public Meeting # 1 Develop Alignment Alternates Line and Grade for 2 Alternatives Record of Decision Evaluate Impacts & Modify Alternates Present Findings at Public Meeting #2 Public Hearing Final EIS Initial Consultation with Resource Agencies Initial Consultation with Local Governments Develop Draft Environmental Impact Statement (DEIS) Start Environmental Impact Statement (DEIS) Public Meeting #3

Cost Development with 3 Test Corridors

Build-out Cost per Mile per Test Corridor $ 2.4 billion$23 millionCorridor 3 $1.8 billion$23 millionCorridor 2 $2.7 billion$36 millionCorridor 1 Total CostCost Per Mile

Preliminary Alternates Alt A- 1 Alt B-1 Alt D-1 Alt D-2 Alt D-1 / D-2 Alt B-1 Alt A- 1 Alt C- 1 Alt C-1 D-1

Build-out Cost per Mile per Alternate $ 1.9 billion$23 millionAlternate C-1 (83) $1.8 billion$23 millionAlternate B-1 (80) $2.7 billion$36 millionAlternate A-1 (73) Total CostCost Per MileAlternate (distance*) $ 2.2 billion$23 millionAlternate D-1 (97) $ 2.4 billion$23 millionAlternate D-2 (106) * In miles

Project Completion Issues Using remote sensing and spatial information technologies allowed the consulting team to arrive at initial estimates within about 10 months of time after the project’s onset. Unfortunately, the initial estimates indicated that relocation costs exceeded the projected funds available, human and environmental impacts were considered high, and public dissatisfaction was high for CSX relocation.

Stop Work and Change Strategies Due to cost estimates, high estimated impacts, and public concerns a decision was made to stop work (September 19, 2003) on the CSX relocation EIS and revisit the economic feasibility of the effort while at the same time conferring with neighboring states to arrive at MOU’s that would allow the logical termini of the relocated railroad to be taken to other locations that the current areas; thereby changing the scope of the potential effort.

Economic Feasibility Study Results The study was completed and delivered in September, A new route for the CSX was studied, costs were estimated at 1.7 billion dollars, and results indicated positive benefit/cost aspects.

The study proposed a new route for the CSX shown in blue and abandoned the current CSX shown in yellow along the Mississippi Gulf Coast

Post Katrina Considerations Shortly after the economic feasibility study was delivered Hurricane Katrina struck the Gulf Coast and significantly damaged much of the critical transportation infrastructure in the area. In the aftermath of Hurricane Katrina, it is possible that the CSX Railroad will make a business decision to implement a change in its operational routing that will take the rail traffic that previously traversed the Mississippi coast along a different route that might run from Mobile, AL. to Hattiesburg, MS. to Baton Rogue and/or New Orleans, LA.

Project Completion Opportunity The potential change in operational routing would make the current CSX railroad right-of- way open to consideration for a new East-West transportation corridor and the focus of the study could shift to consider the development of a new East-West coastal corridor for Mississippi that could supplement the capacity of US90, much of which lies in areas highly subject to storm surge inundation as evidenced by Hurricane Katrina.

Critical Project Components To implement this new strategy for changing a railroad right-of-way study to consider an East-West transportation corridor it is important to include close coordination among all modes and transportation agencies involved. Additionally, the design and deployment of appropriate research components is vital to ensure the effective demonstration of the value of commercial remote sensing and spatial information (RSSI) technologies in transportation corridor planning and related environmental analyses. The redesigned project provides an opportunity to develop highly transferable results of nationally significance that emphasize deployable technologies that integrate remote sensing, GIS, PNT, and ITS technologies in transportation corridor planning.