Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.

Slides:



Advertisements
Similar presentations
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Advertisements

I-66 Corridor Improvements Outside the Beltway CTB Briefing
National Utility Contractors Association of Colorado Wings Over the Rockies Air and Space Museum March 19, 2015.
RTD FasTracks Overview ColoRail Winter Meeting
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Corridor #5 Update United States Senate Briefing September 26, 2007.
1 HACIA NETWORKING EVENT Jose Rios, P.E.
Cabinet Meeting February 22, 2012 Governor Andrew M. Cuomo.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Citizens Advisory Committee Quarterly Meeting Rick Clarke, Assistant GM – Capital Programs June 20, 2012.
CDOT Resource Allocation for DRCOG’s 2030 Regional Transportation Plan Adams Arapahoe Denver Broomfield Boulder Gilpin Clear Creek Jefferson Douglas.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Urban Partnership Agreement Summary August 27, 2007.
RAIL PLANNING IN COLORADO SCORT – September 17, 2012 Portland, Maine.
Citizens Advisory Committee Quarterly Update Bill Van Meter, Assistant General Manager, Planning September 19, 2012.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
Getting on the Ballot… and Getting the Ballot Right June 25, 2013.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
A cooperative effort between FHWA, FTA, CDOT, RTD, and Denver Alternative Development and Screening Process Corridor-wide Meetings May 2004.
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
ARRA Design-Build in Minnesota Jay Hietpas - Mn/DOT.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
1 Countywide Transit Network Study objectives: Establish a connected rapid transit system to meet demands through the year 2050 Define transit corridor.
US-169 / I-70 “North Loop” Planning Environmental Linkages Study Pre-Proposal Workshop.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
Colorado Association of Ski Towns August 28, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
NORTH AREA TRANSPORTATION ALLIANCE (NATA) Our Mission towards better transportation and economic development.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
POINCIANA PARKWAY TPO BOARD MEETING APRIL 12, 2012.
Northwest Area Mobility Study FasTracks Monitoring Committee
Interstate 15 North Phase 4
Public Private Partnerships & Innovative Finance Economic Development Council of Colorado, October 3, 2017.
I-25 South Gap Project I-25 Gap Coalition Meeting
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
Presentation transcript:

Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor between North Metro Denver to Fort Collins/Wellington as well as US 85 and US 287. The EIS is the culmination of a decade of cooperative work involving up to 45 agencies/ local govt’s. The Preferred Alternative is estimated to cost $2.18 billion and includes. FHWA and CDOT intend to work toward implementing the Preferred Alternative in its entirety, but due to funding limitations, the Preferred Alternative will need to be constructed in phases over time. US 36- Phase I: — Reconstructs and widens US 36 between Federal Boulevard and the Interlocken Loop to accommodate a new buffer-separated managed lane in each direction. As part of the reconstruction, the Wadsworth Parkway, Wadsworth Boulevard, and Lowell Boulevard bridges will be replaced. The project will also support Bus Rapid Transit, install commuter bikeway where feasible and implement an appropriate transportation demand management program. $315 million ($54 million-TIFIA Loan; $10 million- TIGER grant; $120 million RTD, Remaining- CDOT, HTPE, Bridge Enterprise, RTD, DRCOG, Local) CDOT has issued a Request for Proposal to three short-listed teams as part of the design-build process. CDOT will receive and review the proposals in February 2012 and will then select a design-build team in March Construction will begin in the spring of 2012 and the US 36 Express Lanes will open for toll collection by July 1, North I-25 TIGER: — This project adds one new managed lane with variable tolls in each direction on a six-mile stretch of Interstate 25 from US 36 north of downtown Denver to 120th Avenue in Adams County. This new capacity will create a managed-lane network in the north metro area—connecting to existing lanes on I-25 in downtown Denver and soon- to-be-completed lanes on US 36 between Denver and Boulder. The cost for the project is $44 million. CDOT has requested TIGER IV funds to complete the funding package. C-470 Corridor Coalition: — is a group of public and quasi-public entities (including CDOT and FHWA) that was formed out of a desire to prioritize regional concerns over congestion on C-470 from I-25 to I-70. A coordinated and collaborative process has been established to identify that will be advanced by consensus. Alternatives to date include both tolled and non-tolled options. According to the 2005 CDOT corridor study, the population in the C-470 corridor is expected to grow by 34% by 2025, to 708,000 people, and the number of jobs will grow 44%, to 425,000, over the same period. US 36- Phase II: Would reconstruct and widen US 36 between the Interlocken Loop and Table Mea/Foothills Parkway near Boulder to extend the managed lanes in each direction of US 36. HPTE currently anticipates issuing a Request for Qualifications (RFQ) relating to the delivery of Phase II in the first quarter of 2012, to be followed by a Request for Proposals (RFP) in the second quarter of The goal is to open this second phase to traffic by July 2015, the same time as phase I. The HPTE plans on applying for a TIFIA loan for Phase II estimated in the $25-$30 million range. Construction estimated to be $130 million.