Module 3: Conceptual Design (Part 2) – The Logical Framework We would like to acknowledge the support of the Project Management Institute and the International.

Slides:



Advertisements
Similar presentations
Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
Advertisements

1 Mateja Bizilj PEMPAL BCOP KEY CONCEPTS AND APPROACHES TO PROGRAMS AND PERFORMANCE Tbilisi, June 28, 2007.
Results Based Monitoring (RBM)
Introduction to the Results Framework. What is a Results Framework? Graphic and narrative representation of a strategy for achieving a specific objective.
Donald T. Simeon Caribbean Health Research Council
Grantee Program Plan. Components of the Program Plan Goals  Objectives  Activities  Techniques & Tools  Outcomes/Change.
Conceptual Design The Logical Framework
Conceptual Design Assessments and Analysis We would like to acknowledge the support of the Project Management Institute and the International Institute.
Participants should expect to understand: Concept of M&E Importance of gender in M&E Different steps in the M&E process Integrating gender into program/project.
Developing the Logical Frame Work …………….
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 3 Project management methodologies.
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
PMP® Exam Preparation Course
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
PROJECT MANAGERS: BRITT BEAULIEU, ANEE BRAR, KARINA MILLER, NIC HAGENS JUNE 1, 2008 Community Greenspace Project.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
1 Introduction to Evaluating the Minnesota Demonstration Program Paint Product Stewardship Initiative September 19, 2007 Seattle, WA Matt Keene, Evaluation.
Fundamentals of Evaluation for Public Health Programs ROBERT FOLEY, M.ED. NIHB TRIBAL PUBLIC HEALTH SUMMIT MARCH 31,
Monitoring Monitoring forms part of the project cycle: Project Identification Planning Appraisal - Decision Implementation – Monitoring Evaluation Difference.
The role of assumptions
Developing Indicators
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Module 5: Scope Management
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
INTRODUCTION TO PROJECT PLANNING AND APPRAISAL LOGICAL FRAME WORK PREPARED BY GEORGE BOTCHIE.
The LOGICAL FRAMEWORK Scoping the Essential Elements of a Project Dr. Suchat Katima Mekong Institute.
LIBERIA THE BIG PICTURE Can the Agency tell the truth about results? Can the participants tell the truth about results?
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
LOGICAL FRAMEWORK by Lorelyn T. Dumaug.
Development Hypothesis or Theory of Change M&E Capacity Strengthening Workshop, Maputo 19 and 20 September 2011 Arif Rashid, TOPS.
SUB-MODULE 5. MEANS OF VERIFICATION RESULTS BASED LOGICAL FRAMEWORK TRAINING Quality Assurance and Results Department (ORQR.2)
September 2007 Survey Development Rita O'Sullivan Evaluation, Assessment, & Policy Connections (EvAP) School of Education, University of North Carolina-Chapel.
21/4/2008 Evaluation of control measures 1. 21/4/2008 Evaluation of control measures 2 Family and Community Medicine Department.
UK Aid Direct Introduction to Logframes (only required at proposal stage)
The P Process Strategic Design
Community Planning 101 Disability Preparedness Summit Nebraska Volunteer Service Commission Laurie Barger Sutter November 5, 2007.
Advanced Engineering Projects Management Dr. Nabil I El Sawalhi Associate Professor of Construction Management 1AEPM 4.
Deeping Skill in Working with Logical Frameworks Examples.
Key Components of a successful Proposal OAS / IACML Workshop on Technical Assistance. San José, Costa Rica May 8, 2007 By: José Luis Alvarez R. Consultant.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
The Logical Framework (Log Frame). Programs & Projects Programs Broad areas of work required to implement policy decisions. Usually focused on a sector.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
S3.1 session day 5 2 Programme management download resources from Approved by the Advisory Group: Programme management Programme and project.
Introduction to Monitoring and Evaluation. Learning Objectives By the end of the session, participants will be able to: Define program components Define.
Development of Gender Sensitive M&E: Tools and Strategies.
Module 2: Conceptual Design (Part 1) - Assessments and Analysis We would like to acknowledge the support of the Project Management Institute and the International.
Evaluation What is evaluation?
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
Marelize Gorgens The World Bank An M&E strategy Monitoring & Evaluation strategy Master & Execute Money and Energy is a waste of M&E that we do not M&E.
Impact-Oriented Project Planning
Module 2 Basic Concepts.
Gender-Sensitive Monitoring and Evaluation
Chapter 03 Project Design
Gender-Sensitive Monitoring and Evaluation
Welcome to course “Understanding and Producing Effective Logframes”
Session 1 – Study Objectives
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Day 2 The LogFrame.
Logical Framework I want to design a project by planning out the logic
Logic Models and Theory of Change Models: Defining and Telling Apart
Session 9 Recap on LFM and IL.
Integrating Gender into Rural Development M&E in Projects and Programs
How is an M & E framework derived from the logframe?
Presentation transcript:

Module 3: Conceptual Design (Part 2) – The Logical Framework We would like to acknowledge the support of the Project Management Institute and the International Institute for Learning, Inc. for permitting the use of their intellectual property in this curriculum.

Module 2 Objectives By the end of this module you will be able to: Explain why Logical Frameworks are useful in the development context Develop LogFrame description statements that reflect causal logic Develop indicators that correspond to the LogFrame description statements

Exercise What experience do you have working with Logical Frameworks? For what purposes have you used Logical Frameworks?

Purposes of a Logical Framework A systematic tool – for designing, planning, implementing, and monitoring and evaluating a project (or program). A tool for organizing thinking— for relating inputs to the implementation of activities, activities to the production of outputs, outputs to the achievement of a defined purpose, and purpose to a high-level goal or impact. A tool for identifying and assessing risks — by listing critical assumptions inherent in project design and implementation. A tool for measuring project progress — through objectively verifiable indicators and means of verification. A tool for developing consensus and communicating a project’s intent and strategy

Causal Logic Modeling – A systematic tool that visually shows, through a graphic illustration or picture, how a particular initiative occurs through logical relationships. Project Description IndicatorsSource of Verification Assumptions Label?

LogFrame Variations Don’t over-focus on the language and the variations of the various LogFrame matrix models. The important lesson is to learn to think through projects using a logic model.

The Logic of LogFrames (Part 1) Project Description IndicatorsSource of Verification Assumptions Goal Objective(s)/ Outcome(s) Deliverables/ Outputs Activities If the OBJECTIVES are accomplished; Then this should contribute to the overall goal If DELIVERABLES are produced; Then the OBJECTIVES are accomplished If adequate RESOURCES/INPUTS are provided; Then the ACTIVITIES can be conducted If the ACTIVITIES are conducted; Then RESULTS can be produced

Writing Description Statemetns Project Description Goal Objective(s)/ Outcome(s) Deliverables/ Outputs Activities The broad development impact to which the project contributes – at a national or sector level Statement Wording: “To contribute to…” The development outcome at the end of the project – more specifically the expected benefits to the target group(s) Statement Wording: “Increased, improved, etc.” The direct/tangible results (goods &services) that the project delivers, and which are largely under project management control Statement Wording: “delivered/produced/conducted, etc.” The tasks (work program) that need to be carried out to deliver the planned results Statement Wording: “Prepare, design, construct, research, etc.”

From Objective Tree to Logframe

Developing Statements Objective Hierarchy Examples of How to Develop Statements Goal To contribute to improved health, particularly of under 5s Objective(s)/ Outcome(s) 1. Improved river water quality Deliverables/ Outputs 1.1 Reduced volume of fecal waste discharged into the river system 1.2 Reduced volume of household refuse directly dumped into the river system Activities Conduct baseline survey of households Prepare and deliver public awareness campaign Prepare engineering specifications for latrines and increased sewage network Etc Prepare and deliver public awareness campaign Etc.

The Logic of LogFrames (Part 2) Project Description IndicatorsSource of Verification Assumptions Goal Objective(s)/ Outcome(s) Deliverables/ Outputs Activities If the horizontal logic is followed AND assumptions hold true; Then the project will likely succeed.

Identifying Assumptions Objective(s) Improved river water quality Goal: To contribute to improved health, particularly of under 5s Outcome 1 Reduced volume of fecal waste discharged into the river system Assumption(s)

Illustrative Assumptions partial build out Project DescriptionIndicatorsSource of VerificationAssumptions To contribute to improved health, particularly of under 5s and the general health of the river ecosystem. Improved quality of river water. -The Clean River legislation is introduced by the EPA and enforced --Up river water quality remains unchanged 1.1 Reduced volume of fecal waste discharged into river 1.2 Reduced volume of household refuse directly dumped into the river system -Waste water treatment meets national standards -fishing cooperatives meet obligations to establish waste collection systems Conduct baseline survey of households Prepare and deliver public awareness campaign Prepare engineering specifications for latrines and expanded sewage network Etc Etc. -Municipal budgets for improvements to sewage systems remain unchanged. Goal Objectives/ Outcomes Deliverables/ Outputs Activities

Adding Indicators Project Description IndicatorsSource of Verification Assumptions Goal Objective(s)/ Outcomes Deliverables/ Outputs Activities “an instrument which gives you information” The English Language Dictionary “A quantitative or qualitative factor or variable that provides a simple and reliable means to measure achievement, to reflect changes connected to an intervention, or to help assess the performance of a development actor” OECD/DAC (DAC Glossary of Key Terms in Evaluation, May 2002) “a variable, which purpose it is to measure change in a phenomena or process” USAID “a description of the project’s objectives in terms of quantity, quality, target group(s), time and place” OECD DEFINITIONS

SMART Indicators SSpecific MMeasurable AAchievable Or: acceptable, applicable, appropriate, attainable or agreed upon (to stress the importance of common understanding) RRelevant Or: reliable, realistic (when achievable/attainable is not used) TTime-bound

Direct vs. Indirect Indicators Direct indicators These indicators directly pinpoint at the subject of interest. This is often the case with operational and more technical subjects. What the manager wants to know, can be (and generally is) measured directly. Indirect indicators (Proxy indicators) Indirect indicators (or proxy-indicators) refer in an indirect way to the subject of interest. There can be several reasons to formulate indirect indicators: The subject of interest cannot be measured directly. This is particularly the case for more qualitative subjects, like behavioral change, etc.; The subject of analysis can be measured directly, but it is too sensitive to do so, for example level of income, “safe sex”, etc.; The use of an indirect indicator can be more cost-effective than the use of a direct one. An indirect indicator may very well represent the right balance between level of reliability of information and the efforts needed to obtain the data.

Avoid Reinventing the Wheel Considerable efforts to formulate indicators are being undertaken in most of the programmatic areas of international development, relief and conservation. Some of these might be led by donors, interagency initiatives, NGOs that specialize in Monitoring and Evaluation, and within your agencies. When developing indicators for the Delta River case, for example, the FANTA Project has a technical assistance document that focuses on impact indicators for Water and Sanitation.

Source of Verification (SoV) Project Description IndicatorsSource of Verification Assumptions Goal Objective(s) Results Activities Discussions on the Source of Verification for indicators (where to find the information or how to collect it)often lead to: Reformulation of the indicator. In the worst case that the information referred to in the indicator cannot be obtained, the indicator becomes useless and a new one should be formulated.

Activity Indicators & SoVs Project Description Indicators Goal Objective(s)/ Outcome(s) Deliverables/ Outputs Activities Activity indicators are the easiest ones to formulate and collect because they focus on implementation progress as reflected in project and partner staff work plans, project events, and corresponding budget expenditures. They answer basic questions like: Was the Activity completed with acceptable quality? Was it completed as planned regarding numbers and types of items purchased and distributed? Were the meetings held? Were the numbers and gender of people in the target groups trained or otherwise involved? Activity indicators are typically measured through administrative, management, trainer, and financial tracking and record-keeping systems, supplemented with written summaries and reports.

Output Indicators & SoVs Project Description Indicators Goal Objective(s)/ Outcome(s) Deliverables/ Outputs Output indicators allow project management to track what is to be delivered, when, and, most importantly, to what effect. They are generally measured in terms of immediate effects of goods and services delivered, such as: pre/post-training scores on tests (written or verbal skills, simple assessments, etc.) creation of certain structures, documents, systems (kilometers of roads or number of schools rehabilitated) and so on. Activities Questions Answered: “How will we know if the deliverables have been delivered?” Include appropriate details about quantity, quality and time.

Objectives Indicators & SoVs Project Description Indicators Goal Objective(s)/ Outcome(s) Objectives indicators focus on demonstrable evidence of a behavioral change, such as adoption or uptake, coverage or reach of Outputs. Objectives indicators normally can only be collected by the project itself – because they are specific to behavioral changes in response to interventions by/in the specific project and its action area. Secondary sources rarely exist at this level. Tracking Objectives indicators begins as soon as Results have begun being delivered and have had a reasonable amount of time to take effect. Start with “light” monitoring. Then do more, or more targeted monitoring depending on your findings. Deliverables/ Outputs Activities Questions Answered: “How will we know if the Objective(s) have been delivered?” Include appropriate details about quantity, quality and time.

Goal Indicators & SoVs Project Description Indicators Goal Many organizations do not require that the Project Manager measure impact of the project against the goal – asserting that Project managers generally have no direct influence over the contribution the project makes to the overall objective, and can only be expected to monitor the broader policy and program environment to help ensure the project continues to be contextually relevant. Performance indicator statements and associated data are drawn from appropriate, already-existing sources such as Amnesty International, FAO, Freedom House, IFPRI, Transparency International, World Bank, UN, national government reports, etc. Objective(s)/ Outcome(s) Deliverables/ Outputs Activities

A LogFrame Matrix Example partial build out Project DescriptionIndicatorsSource of VerificationAssumptions To contribute to improved health, particularly of under 5s and the general health of the river ecosystem. Incidence of water-borne diseases reduced by 30% by 2012, specifically among low income families who live by the river. Municipal hospital and clinic records collected by mobile health teams. Improved quality of river water. Concentration of e. coli reduced by 20% (compared to levels in 2003) and meets national health and sanitation standards by Monthly water quality surveys conducted by the EPA and the River Authority. -The Clean River legislation is introduced by the EPA and enforced --Up river water quality remains unchanged 1.1 Reduced volume of fecal waste discharged into river 1.2 Reduced volume of household refuse directly dumped into the river system % of household fecal waste is disposed of via latrines or sewage connections. 1.2 … 1.1 Annual sample survey conducted by municipality between 2009 and Waste water treatment meets national standards -fishing cooperatives meet obligations to establish waste collection systems Conduct baseline survey of households Prepare and deliver public awareness campaign Prepare engineering specifications for latrines and expanded sewage network Etc Etc Baseline data (Knowledge Practice Coverage) for household waste management exists Schedule of visits of mobile teams completed Engineering plans approved by Ministry of Public Works Etc month progress report Extension team progress reports Approved project charter from the Ministry of Public Works Etc. -Municipal budgets for improvements to sewage systems remain unchanged. Goal Objectives/ Outcomes Deliverables/ Outputs Activities