Order Policy Codes for use in MRP and AVP

Slides:



Advertisements
Similar presentations
Moving Inventory easily between plants
Advertisements

Auto Quick-Buy. Overview: Based upon the use of system flags, a complete ordering process will be automated as follows: sales order lines automatically.
How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
Requisition Management- ENG version Skorkovský, KPH ESF MU 2012.
Inventory Modeling Concepts
Christian Rytt, Microsoft, Program Manager – Supply Chain Supply Planning and Inventory Visualization in NAV 2013.
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Consumption-based Planning
Inventory Control Chapter 17 2.
12 Inventory Management.
8-1Inventory Management William J. Stevenson Operations Management 8 th edition.
Chapter 17 Inventory Control.
Inventory Control IME 451, Lecture 3.
12 Inventory Management.
Operations Management
PLANNING ENGINE Presented by: Dave Parker Sr. Business Analyst.
Chapter 13 Inventory Management McGraw-Hill/Irwin
INVENTORY MANAGEMENT Chapter Twenty McGraw-Hill/Irwin
Supply Chain Management (SCM) Inventory management
Chapter 9 Inventory Management.
19-20 November, 2008 | Copenhagen. Christian Rytt & Thomas Jensen Program Managers Microsoft Corporation NAV08.
Principles of Operations Management
Material Requirements Planning (MRP)
Delivery date control Includes Sales lead time Uses on-hand and planned supply Triggers explosion Creates orders or kanbans Fixed administrative.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Operations Management Inventory Management. 2 The Functions of Inventory To have a stock of goods that will provide a “selection” for customers To take.
Chapter 12 – Independent Demand Inventory Management
Chapter 12: Inventory Control Models
CHAPTER 7 Managing Inventories
13 Inventory Management.
Faster and Easier Record Entry with Custom Templates & Card Files Jim Simunek, Senior Consultant
Lot Sizing. Inventory Types of inventory Types of inventory –Raw materials/purchase parts –Work-in-process –Finished goods Holding of inventory is expensive.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Inventory. The amount of material, a company has in stock at a specific time is known as inventory or in terms of money it can be defined as the total.
Independent Demand Inventory Management
Materials Requirements Planning
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER Inventory Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Inventory Management. Learning Objectives  Define the term inventory and list the major reasons for holding inventories; and list the main requirements.
Chapter 12 : Inventory Management Outline  The Importance of Inventory  Functions of Inventory  Types of Inventory.
1 Operations Management MRP Lecture 22 (Chapter 14)
13Inventory Management. 13Inventory Management Types of Inventories Raw materials & purchased parts Partially completed goods called work in progress.
Hierarchy of Production Decisions
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
1 Managing MO’s with OBPM How to use Browser/PowerLink technology to revolutionize Manufacturing Orders Jim Simunek, CPIM
1 Chapter 6 –Inventory Management Policies Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Inventory Management. Introduction The Inventory Management Conflict The Inventory Management Conflict –Minimize Inventory Carrying Cost –Maximize Service.
Chapter 12 – Independent Demand Inventory Management Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 18 1.
MBA 8452 Systems and Operations Management
Operations Research II Course,, September Part 3: Inventory Models Operations Research II Dr. Aref Rashad.
© The McGraw-Hill Companies, Inc., Inventory Control.
Inventory Management The goal of effective inventory management is to “meet or exceed your customers’ expectations of product availability with the amount.
Resource Planning Chapter 15.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Microsoft Dynamics NAV 2013 Manufacturing & Service Management Fria Kurowski – ABC Computers Tom Doran - ABC Computers
Supply Planning Enhancement and Inventory Visualization.
Material Requirements Planning
Inventory control and recent trends in PPC
FDFPLSCP4A Manage and schedule production
Module 2: Supply Chain & Logistics Management
Forecasting and MRP: Setup & Configuration
Inventory control and recent trends in PPC
MRP Introduction EXAMPLES
Presentation transcript:

Order Policy Codes for use in MRP and AVP Jim Simunek Senior Consultant CISTECH Inc. www.cistech.net

AGENDA Quantity Modifiers Order Policy Codes How are they used What are the results Order Policy Codes How do I best determine which order policy code to use?

MRP Steps Gather all requirements for an item and sequence requirements by date Net Requirement quantities against available inventory and open orders; recommend expedite/defer where due dates do not match requirement date Plan orders where there is not enough available/on order Calculate start date of planned order

Order Policy Codes Quantity modifiers Order Points

Planner Order Point, Safety Stock & Fixed Order Qty.

Order Policy Code Quantity Modifiers Shrinkage %

Order Quantity Modifiers MRP/AVP calculates what Quantity to order by referring to modifiers in the Item Warehouse record. Operates for MO or PO. To consider: a price break: Minimum a handling situation: Multiple a constraint situation: Maximum

Minimum Order Qty If less than minimum is needed, planned order adjusted upward to the minimum quantity by MRP/AVP Such as: Vendor specifies qty for price break Vendor will not produce less than this quantity Manufacturing carrier quantity or other EOQ Setup control

Multiples – A dozen eggs! MRP/AVP adjusts the planned order quantity Adjustment made after considering the minimum criterion such as: 12 to a box 50 per tub 186 per plating carrier

MRP issues a warning message with the planned order Maximum MRP issues a warning message with the planned order AVP breaks the planned order quantity to the Maximum Use for: Maximum per shift Truck load quantity Can release over the warning Use to detect problems

Quantity Modifier Set up

Shrink If there is an expected loss when the item is built/purchased, Shrinkage % will increase the planned order quantity Shrink does not affect cost or allocated quantities, only MRP planned orders Do not use Yield in the routing and shrink or you will double the loss calculations

Questions?

Order Policy Code The key to telling MRP/AVP how to plan orders and how to keep inventory levels and costs under control! Parameters affected: # of orders placed inventory carried resulting cost to carry shop load Most of all: INVENTORY COSTS Best described using case studies

Order Policy Codes Code Used By Meaning: MRP will generate planned orders and quantities based upon the Order Policy Code for that item! Code Used By Meaning: A MRP Discrete (Lot for Lot) B IM Order Point, Order Quantity (EOQ) C IM Order Point, Order Up To Level D MRP Fixed Order Quantity F MRP Part Period Balancing - Standard Costs G MRP Time Periods of Supply H MRP Order Discretely Above a Fixed Quantity I MRP Part Period Balancing - Current Costs Z MRP User Defined

Order Policy Code B, Order Point with EOQ Ignored by MRP/AVP, planned with reorder report/Browser When item availability goes below the item’s order point, and order is placed If Order Point and/or Fixed Order Quantity fields are zero in the Item Balance record, a suggested order point is calculated Suggested order quantities are printed on the Inventory Reorder Report/or Browser

Order Policy C-Order Point, Order Up to Level Ignored by MRP/AVP, planned with reorder report/Browser Similar to Code B but order is placed for difference between availability and the amount of inventory to be maintained. The amount of inventory to be maintained is placed in the Fixed Order Quantity field. If Fixed Order Quantity is Zero, an EOQ is calculated.

Order Policy Code “A”- Discrete-Lot for Lot Order Policy Code A – Lot-for-Lot - “If you need 10 today and 20 tomorrow, and none are available you will get planned orders for 10 today and 20 tomorrow!!”. Creates planned orders equal to the daily net requirement Use this Order Policy Code where: Setup, handling, order costs are insignificant-More Orders. Item has high cost or spoilage – Demand/Order are 1 to 1. Specialty items in a job shop. End-items produced at fairly constant rate with no changes. Require minimum projected Inventory Balance with no need for service parts. Minimal Service Level to customers.

Order Policy A – Lot for Lot – No Order Modifiers

Order Policy A - 10% Shrinkage - No modifiers

Order Policy A – Modifier - Minimum 400 Minimum Planned to satisfy Lot-for-Lot demand….Not planned again until required. Minimum Planned to meet demand! Sufficient inventory still available Always Orders Minimum

Order Policy A - Multiple 12 - Minimum 400 Still Lot-for-Lot, with a Minimum Order Quantity of 400, but must make or buy in multiples of 12.

Policy Code D-Fixed Order Quantity Based on EOQ (Economic order quantity) calculation. Maintained in Fixed Order Quantity Field Similar to Minimum Order Quantity Use when: Demand is fairly steady Cost is insignificant Packaging or handling constraints might determine order size An EOQ type of order quantity is required

Order Policy D - FOQ 400

Order Policy D Fixed Order Quantity - Multiple 12 - FOQ 400

Order Policy Code F-Part Period Balancing Std. Cost MRP dynamically determines variable EOQs through time, using 2 step approach: Uses set-up cost, order cost, carrying cost to develop order quantity (EOQ from 1960’s) Not the JIT/lean approach Attempts to avoid placing next order in a period of low demand Use when demand is erratic, order/setup costs are high Policy F is sensitive to minor schedule changes

Order Policy F - Order Cost $60 - Item Cost $70 - Carrying Rate 25%/yr

Policy Code I Part Period Balancing Current Costs Calculates same as Policy F except that current costs are used Search order: Current unit cost Last cost Unit cost default

Policy Code G-Time Period of Supply Totals all Requirements within the Days Supply XA default Order Policy Code when adding an Item Balance/Warehouse record Starts count of days with 1st net Requirement found A time period = 0 or 1 equates to Policy A Use when Unit and carrying costs are low Desire to set up blanket order releases Setup and purchase costs are insignificant Demand is erratic

Order Policy G – with 5 days of supply

Order Policy G - 5 days of supply - Multiple 12

Order Policy G - 10 days of supply

Policy Code H Order discretely above Fixed Qty Summarizes Requirements until fixed qty is exceeded. Placed as order on 1st day that has net requirements. Fixed Order quantity specifies fixed qty The planned order qty must equal or exceed the FOQ (fixed order quantity) before the order is planned Use when vendor/mfg specifies min order qty

Policy Code H - Kanban Kanban…Fixed Order Quantity and Maximum Quantity set to same number Planned Order quantity will always be for the same quantity (i.e. quantity matches the Kanban card) Multiple orders can be placed on the same date, if the total requirement quantity exceeds the Kanban quantity (example: one order per truck load).

Order Policy H – Order Above Fixed order Qty 400 Requirements of 440 over 400 at this point!

Order Policy H - Fixed order Qty 400 – Multiple 12

Order Policy Code Z Code Z – Can use your own ordering routine in program AMM34 or code Z defaults to order policy A (discrete) If none of the other order policy codes work for your organization you can customize your own ordering policy MRP programs must be modified to call your program to calculate order quantity

Summary There is no ‘wrong’ order policy code, each one will plan orders to cover the requirements By using the Order Policy Codes in conjunction with Minimum, Multiple and Maximum quantity modifiers you can have MRP/AVP plan for the correct order quantity Once Order Quantities and start/due dates are correct, begin using ‘Auto Release’ of MO’s & PO’s to maximize planner efficiency

Thank you for attending! Questions? Thank you for attending!