Materials Requirements Planning

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Material Requirements Planning
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Principles of Operations Management
Material Requirements Planning (MRP)
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP.
Material Requirements Planning Dr. Everette S. Gardner, Jr.
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Chapter 12 MRP and ERP.
Material Requirements Planning
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Material Requirements Planning
Materials Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1 Operations Management MRP Lecture 22 (Chapter 14)
Hierarchy of Production Decisions
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Production Planning and Control
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
Operations Management (2) Topic 4 Prof. Upendra Kachru Material Requirements Planning.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
SISTEM INFORMASI ENTERPRISE
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Materials Requirements Planning
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP.
MRP and ERP.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Materials Requirements Planning CHAPTER 18

Learning Objectives Describe what MRP is and where it is best applied. Understand the source of the information used by the system. Demonstrate how to do an MRP “explosion.” Explain how order quantities are calculated in MRP systems.

Secondary reports Primary reports Exception reports Planning reports Firm orders from known customers Forecasts of demand from random Aggregate product plan Bill of material file Engineering design changes Inventory record file transactions Master production Schedule (MPS) Material planning (MRP computer program) Primary reports Secondary reports Planned order schedule for inventory and production control Exception reports Planning reports Reports for performance control 12 12

Master Production Schedule (MPS) Time-phased plan specifying how many and when the firm plans to build each end item Aggregate Plan (Product Groups) MPS (Specific End Items) 8 8

The Aggregate Plan and the Master Production Schedule for Mattresses Master production schedule (MPS): the time-phased plan specifying how many and when the firm plans to build each end item LO 2

Time Fences Frozen: anything from no changes to only minor changes Moderately firm: allow changes so long as parts are available Flexible: allow almost any variations LO 2

Demand for Products Customers who have placed specific orders Generated by sales personnel Orders carry promised delivery dates No forecasting of these orders Forecasted demand Normal independent-demand sales Demand for parts and components Spares and repair LO 2

Bill of Materials Bill of materials (BOM): contains the complete product description, listing the materials, parts, and components along with the sequence in which the product is created One of the three main inputs to the MRP program Often called the product structure file or product tree because it shows how a product is put together LO 2

Bill of Materials (Product Structure Tree) for Product A

Level Coding of Bills of Materials LO 2

Inventory Records File Each inventory item carried as a separate file Status according to “time buckets” Pegging Identify each parent item that created demand 14 14

MRP Explosion Process The requirements for end items are retrieved from the master schedule These are referred to as “gross requirements” by the MRP program Uses on-hand balance with schedule of orders to calculate the “net requirements” Using net requirements, it calculates when orders should be received to meet these requirements LO 3

Additional MRP Scheduling Terminology Gross Requirements Scheduled receipts Projected available balance Net requirements Planned order receipt Planned order release 19 19

Primary MRP Reports Planned orders to be released at a future time Order release notices to execute the planned orders Changes in due dates of open orders due to rescheduling Cancellations or suspensions of open orders due to cancellation or suspension of orders on the master production schedule Inventory status data 15 15

Secondary MRP Reports Planning reports, for example, forecasting inventory requirements over a period of time Performance reports used to determine agreement between actual and programmed usage and costs Exception reports used to point out serious discrepancies, such as late or overdue orders 15 15

Lot Sizing in MRP Systems Determination of lot sizes in an MRP system is a complicated and difficult problem Lot sizes: the part quantities issued in the planned order receipt and planned order release sections of an MRP schedule Will look at four Lot-for-lot (L4L) Economic order quantity (EOQ) Least total cost (LTC) Least unit cost (LUC) LO 4

Lot-for-Lot Sets planned orders to exactly match the net requirements Produces exactly what is needed each week with none carried over into future periods Minimizes carrying cost Does not take into account setup costs or capacity limitations. LO 4

Economic Order Quantity Calculate reorder quantity based on EOQ EOQ was not designed for a system with discrete time periods such as MRP The lot sizes generated by EOQ do not always cover the entire number of periods LO 4

Least Total Cost Least total cost method (LTC): a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup costs for various lot sizes and then selects the lot in which these are most nearly equal Influenced by the length of the planning horizon LO 4

Least Unit Cost Least unit cost method: a dynamic lot-sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost LO 4

MRP Example A(2) B(1) D(5) C(2) X C(3) Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 18 18

X A(2) It takes 2 A’s for each X 21 21

X A(2) B(1) It takes 1 B for each X 21 21

X A(2) B(1) C(3) It takes 3 C’s for each A 21 21

X A(2) B(1) C(3) C(2) It takes 2 C’s for each B 21 21

X A(2) B(1) C(3) C(2) D(5) It takes 5 D’s for each B 21 21

Closed Loop MRP Yes Production Planning Master Production Scheduling Material Requirements Planning Capacity Requirements Planning No Feedback Realistic? Feedback Execute: Capacity Plans Material Plans Yes 22 22

Any Questions?