San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract 04-0120F4 August 16, 2005.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Metro Muncipal Agreement Program
MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
ODOT Structure Project Manager Seminar Specifications
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
 Project Delivery  Design Considerations  Lessons Learned.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
ESTIMATING By Laith Jacob.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Jim Merrill, Welding Engineer, Law Crandell
Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Construction Notes Amer Bata, Area Construction Manager.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 November 30, 2005.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Metropolitan Transportation Commission & Bay Area Toll Authority January 19, 2006 Steve Heminger Executive Director Metropolitan Transportation Commission.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.
You passed the Bond or secured some funds What do we do now? 2014.
San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
Office of Procurement Services.  Vendor Application Website: 
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Business Enterprise Outreach Program 2003.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
DSA Fire and Life Safety SDFPA, February 2009 Craig Rush DSA Regional Manager.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
High Bridge Re-Deck Project
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
State Aid Construction
ARCH 435 PROJECT MANAGEMENT
State Aid Construction
BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015
Txdot field inspection
Presentation transcript:

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005

SFOBB East Span Seismic Safety Project Welcome Janet Adams SFOBB East Span Project Manager, Caltrans

SFOBB East Span Seismic Safety Project Welcome Bijan Sartipi District 4 Director, Caltrans

SFOBB East Span Seismic Safety Project Welcome Ann Flemer Deputy Director, BATA

SFOBB East Span Seismic Safety Project DVBE - Civil Rights Angel Carrera DBE Program Manager, Caltrans Civil Rights Program Disabled Veteran Business Enterprise (DVBE) goal Disabled Veteran Business Enterprise (DVBE) goal Prime Contractor’s commitment Prime Contractor’s commitment

SFOBB East Span Seismic Safety Project Overview Rick Morrow SFOBB East Span SAS Construction Manager, Caltrans

SFOBB East Span Seismic Safety Project San Francisco - Oakland Bay Bridge East Span Seismic Safety Replacement Project

SFOBB East Span Seismic Safety Project East Span Replacement

SFOBB East Span Seismic Safety Project Elevation

Frame 1 Frame 2 Frame 3Frame 4 Hinge A Hinge E SegmentYBISASSkywayOakland East Span Replacement Contracts F4 SAS Superstructure

SFOBB East Span Seismic Safety Project Self Anchored Suspension (SAS) Approx OG along PG Line Mean Sea Level Elev Pier E2W C L Hinge A C L Tower C L Pier W2W C L Hinge K C L F4SAS Superstructure Bid Opening 2/1/06

SFOBB East Span Seismic Safety Project WB Open Complete All Work Required for Westbound Traffic Construct E2 Crossbeam, Temporary Towers, Deck Sections, Cable System And Transfer Load to Cable System Complete Hinge KW Complete Eastern YBI Frames Construct W2 Capbeam Contract P4 (YBI Structures) Not Time Scaled Contract E4 (E2/T1) E2/T1 Available Phase 1 Phase 2 Phase 3 Complete All Work Phase 4 Area FP Available To SAS Contract F4 (SAS) Project Schedule

SFOBB East Span Seismic Safety Project Contract F4 This contract incorporates addenda from prior SAS advertisement This contract incorporates addenda from prior SAS advertisement Bidder inquiries from the previous SAS advertisement are considered no longer relevant Bidder inquiries from the previous SAS advertisement are considered no longer relevant Project funded by Toll revenues and State funds, therefore Buy America is not required Project funded by Toll revenues and State funds, therefore Buy America is not required

SFOBB East Span Seismic Safety Project Contract F4 Contract sections of interest Contract sections of interest  Bidder compensation SP  Submittals with bid SP  Reduced performance and payment bond requirements SP  Payments for materials furnished but not incorporated into the work (materials on hand) SP  Mobilization payments modified from Standard SP  Marine access SP

SFOBB East Span Seismic Safety Project Contract F4 Working Drawing Campus SP Working Drawing Campus SP  Contractor and Department staff in the same building  Streamlines decision-making processes for shop drawing technical decisions

SFOBB East Span Seismic Safety Project Contract F4

SFOBB East Span Seismic Safety Project KFM Concrete Batch Plant Pier 7 – Port of Oakland Caltrans Contract F4 CT SAS

SFOBB East Span Seismic Safety Project Contract F4 Cost Reduction Incentive Proposals Cost Reduction Incentive Proposals SP  Cost savings split 60% contractor / 40% Department  Provisions for non-compensable time extensions  Facilitated CRIP meetings  Also facilitated Corridor Value Analysis meetings SP

SFOBB East Span Seismic Safety Project Permits Requirements/restrictions Requirements/restrictions  Specifications  Plans  Information Handout Contractor’s operations will need approval by outside agencies Contractor’s operations will need approval by outside agencies

SFOBB East Span Seismic Safety Project Fabrication Jim Merrill Caltrans, Office of Structural Materials

SFOBB East Span Seismic Safety Project SFOBB Steel Fabricators Outreach Material Quality Items Fabricator Audits – Special Provisions, Section 8-4 Fabricator Audits – Special Provisions, Section 8-4  Manufacturing and Fabrication Self Qualification Audit (MFSQA): “The Contractor shall submit a MFSQA of each facility considered for use by the Contractor or any subcontractor, supplier, or fabricator …”  Department Audit “Manufacturing or fabrication … shall not commence at a facility … prior to the Engineer … completing or waiving a facility audit (Department audit) …”

SFOBB East Span Seismic Safety Project SFOBB Steel Fabricators Outreach Material Quality Items (cont) Welding Quality - Special Provisions, Section 8-3 Welding Quality - Special Provisions, Section 8-3  Quality Control Manager (QCM): “The Contractor shall designate in writing a welding Quality Control Manager (QCM). The QCM shall be responsible directly to the Contractor for the quality of welding, including materials and workmanship, performed by the Contractor and subcontractors.”  Pre-weld Meeting: “Prior to submitting the Welding Quality Control Plan (WQCP) required herein, a pre-welding meeting … shall be held to discuss the requirements for the WQCP.”  Quality Control Plan (QCP): “No welding shall be performed until the WQCP is approved in writing by the Engineer.”

SFOBB East Span Seismic Safety Project Technical Issues Brian Maroney SFOBB East Span Technical Manager, Caltrans

SFOBB East Span Seismic Safety Project Structure Plans

SFOBB East Span Seismic Safety Project Tower Layout – Looking East

SFOBB East Span Seismic Safety Project Tower Shaft Details

SFOBB East Span Seismic Safety Project Tower Bolted Splice Details

SFOBB East Span Seismic Safety Project Tower Diaphragm Details

SFOBB East Span Seismic Safety Project Tower Strut Facade Details

SFOBB East Span Seismic Safety Project Tower Saddle Details

SFOBB East Span Seismic Safety Project Typical Cross Section

SFOBB East Span Seismic Safety Project Partial Typical Section – “E” Line

SFOBB East Span Seismic Safety Project Pier E2 Details

SFOBB East Span Seismic Safety Project Pier E2 Bearing and Shear Key Layout

SFOBB East Span Seismic Safety Project Pier E2 Bearing Details

SFOBB East Span Seismic Safety Project Pier E2 Shear Key Details

SFOBB East Span Seismic Safety Project West Cable Anchorage Layout

SFOBB East Span Seismic Safety Project West Cable Anchorage Layout – Elevation

SFOBB East Span Seismic Safety Project Hinge K Layout

SFOBB East Span Seismic Safety Project SAS Construction Sequence

SFOBB East Span Seismic Safety Project Guidelines for Q&A Please submit questions in writing on cards provided Please submit questions in writing on cards provided Any answers provided today are preliminary and not considered final until posted on the bidder inquiry web site Any answers provided today are preliminary and not considered final until posted on the bidder inquiry web site