NC Region Speakers:
Now What?
EBS Pothole Vac Truck T & M Force Account Con Mod/Change Order LCS QMP (QC, QV, IA) QC QV IA Excavation Below Subgrade Utility Line Opening Vacuum Truck Time & Materials Direct Contractor to Perform Work Modification to Original Contract Lane Closure System Quality Management Program Quality Control Quality Verification Independent Assurance
IRA IDR IRI Ride Incentive HMA AC PG64-22 Item Record Account Inspector Daily Report International Roughness Index Hot Mix Asphalt Asphalt Cement Performance Graded High Temp/Low Temp (C) F and F
Inspect contractors on site and record in diaries Record materials being used on site, and ensure they are approved to be used on site Mark out removals for contractor Measure items being placed that day and recording them properly. Traffic Inspections Erosion Control Inspections Materials Testing
Proper Documentation Date Weather Contractor(s) On Site Men (Foreman, Operator, Laborer) Equipment (Make & Model) Hours of Men & Equipment Work Performed Be specific with locations/times Record Important Conversations
Proper Documentation Do not skimp on content Initial or sign each diary entry If you are recording trucks – note truck numbers and companies Make sure paper diaries have page numbers and easy reference back to diary. Enter your diaries into Fieldmanager or Fieldbook You can enter more than one contractor in each electronic diary.
Check Miscellaneous Quantities (MQ’s) for Required Unit of Measurement Examples: LF, EACH, TON, SF, LB, DAY, CWT, LS, CY, SY, ACRE, GAL, MGAL Measure Material Placed on Project Use Proper Device for the Job Measuring Wheel Tape Measures (25 ft &150 ft) Folding Stick Rule
Record Measurements on Statewide Spreadsheets (Pantry 2014) or in Daily Diaries (Green Sheet Examples) Some Calculations May Need to be Drawn on Engineering Paper Be as Accurate as Possible Rounding Errors are Common Have Someone Check Your Work Keep ALL source documents
Traffic control should be inspected continuously, but more formally once a week. Traffic Control Inspection Checklist in Pantry. Federal Highways random check-ups check for documented proof of Traffic Inspections.
Now What?
Daily Diaries LCS Project Record Keeping Administrative Items Materials Contract Modifications Estimates Weekly Construction Updates Main point of contact on a project In addition to inspectors duties
There is no formal procedure, just required information and source documentation Can use diaries, Fieldmanager or combo – just need to reference source documents. Work with the contractor but don’t be afraid to say no.
Can reference in Inspectors Diaries Should have conversations with Contractor Rainfall Required EVERYDAY – calendar day and working day contracts.
Single source of roadway closures used for: Lane closures Oversize/overweight permitting 511 Should be entered for all state projects I-39/WIS 29/US 10/ UW 51 have to complete document in region specific pantry folder Updated as traffic impacts change Follow requirements laid out in LCS Manual Use training site to learn the system
General Information ECIP Project Leader, PM and Kevin Garrigan review ECIP Start Construction Checklist ECIP Project Leader, PM and Kevin Garrigan review ECIP Preconstruction Meeting LCS Material E-guide
Contract Modifications Measurement & Payment Finals Final Construction Checklist DQI Region Review of Records Materials Submittal Reports Submittal As-Built Plans
Paid off of postings Completed weekly for most project in region Need to send outbox Need to send Fit Contact Project Manager to let them know that Estimate has been Submitted. Need to refresh contract after project manager approves
Generate Post in Field Office Sign and maintain in records
Write up like Special Provisions. Examples in Contact Administration Folder Justify using costs – Previous Bids, Bid Express, Force Account...
Field Manual in Pantry 2014 Program walkthrough -
Statewide Forms Meeting Agendas EC Paperwork Pile Driving, etc. Statewide Spreadsheets Payment/Measurement Regional Information Each Regions own forms that build on primary folders.
Preconstruction Meeting Weekly Meeting Meeting Minutes/Sign-ins Line of Communication Form Designated Materials Person 3 Week Rolling Schedule Request for Information (RFI) Evaluations