ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Project Management for Your Local Section / Chapter Lee Stogner, PMP
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Implementation Guidance Executive Order State of New Mexico Contractor Health Coverage Requirement Michael C. Vinyard, State Purchasing Agent.
TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Managing a Successful Mechanical System project Following design – what next?
Ensure Vendor/Engineer of Choice Product Quality
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
17 th Training Wing I n t e g r i t y - S e r v i c e - E x c e l l e n c e Contract Closeout Train and deploy the world’s foremost combat ready Intelligence,
CTAA Expo 2009 CTAA Expo 2009 State DOT Roundtable Kimberly A. Gayle, Office Chief Federal Transit Grants Programs Division of Mass Transportation June.
Alternative Project Delivery
CTC-470 Construction Administration Project Management Concepts.
TEAM Training: Program Management Last Update: May 2011.
Chapter 7: Managing Risk
Greenfield District Utility/RR Engineer, INDOT
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Release & Deployment ITIL Version 3
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
- Site Summary Revised Format for EM QPRs and MPRs Site Generated Slides May
Measure E Citizens’ Oversight Committee Monthly Report to the BOE March 10, 2015.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Risk management process
ROSE PHETTEPLACE WISCONSIN DEPARTMENT OF TRANSPORTATION American Recovery and Reinvestment Act (ARRA)
Construction Work Packaging
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
Items Required for Process Hand-off
Question # 1 For $100 15$1,000,000 14$500,000 13$250,000 12$125,000 11$64,000 10$32,000 9$16,000 8$8,000 7$4,000 6$2,000 5$1,000 4$500 3$300 2$200 1$100.
Project Life Cycle.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
New SUB Improvements Derek Moore. Outcomes 1.Approve New SUB Committee Motion – “BE IT RESOLVED THAT Council direct that the budget for the New SUB Project.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Introduction.
Project Delivery Business Operations Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Resolving Common Construction Disputes By: Bob Bourg Claims and Disputes Manager Washington State Department of Enterprise Services Engineering and Architectural.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
The Contract Management Process Contract Formation.
April 29, 2014 WELCOME!. Tips & Tricks Interface & View.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
> Blueprint Executive Summary >. Presentation Purpose; This Executive Summary captures the key details and outputs which merit stakeholder alignment to.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Construction Work Packaging
Camera PDR/CD1 Planning 19 September 2008
CONTRACT ADMINISTRATION
Construction Oversight
Pre-Construction Services
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
Green Line Extension Project Sunk Cost Analysis February 29, 2016
Controlling Project Cost and Schedule
Conventional Facilities
Project Overview.
Second Avenue Subway Project Execution Strategy
Chapter 2 – Review ‘construction management’
Presentation transcript:

ARRA Project Oversight 2010 WTBA Contractor/Engineer Conference 1/21/2010

2010 WTBA Contractor/Engineer Conference 2 ARRA Project Oversight Structure Project team Region/Bureau Change Management Team Division Change Management Team Executive Change Management Team – Oversight Committee

2010 WTBA Contractor/Engineer Conference 3 ARRA Project Oversight Key Elements Scope/cost change management Project closeout control

2010 WTBA Contractor/Engineer Conference 4 Scope/Cost Change Management Each project will have a set cost – Contract amount + – Construction delivery + – Construction reserve Project cost must be monitored by anticipating – Overruns/underruns – Scope changes – Contract modifications

2010 WTBA Contractor/Engineer Conference 5 Scope/Cost Change Management Scope/Cost strategies: – Shortening project limits – Eliminating low risk work – Considering contractor cost saving proposals Strategies should be developed early in a project and saved in a ‘cost savings contingency plan’ Strategies should ‘not’ be included that impact overall quality or reduce safety objectives

ARRA Training - July 20096

Change Management Request Form 2010 WTBA Contractor/Engineer Conference 7

8 Project Closeout Control Project Closeout Goals – Finals to project manager 1 month after project completion – Tentative/final estimate – 4 months after Final Acceptance – Final Estimate – 6 months after Final Acceptance

2010 WTBA Contractor/Engineer Conference 9 Project Closeout Control To meet project closeout goals – Quantity Management Measure as items are completed Complete earthwork comps as work is done Verify quantities with contractor – Materials Require tests/certifications prior to installation – Dispute/Claim Avoidance Resolve disputes as you go

ARRA Project Summary To Date 2009 Construction Let Projects – Let Dollars – Completed Projects– Completed Dollars – 133 Projects $320 Million 89 Projects $180 Million 2010 Construction Planned Let Projects – Planned Let Dollars – 2009 Carryover Projects – 2009 Carryover Dollars – 147 Projects $147 Million 44 Projects $140 Million 2010 WTBA Contractor/Engineer Conference 10