Transitioning From Clean Water Act Nationwide Permitting To Individual Permitting Matt Owens Environmental Specialist 5 June 2013.

Slides:



Advertisements
Similar presentations
Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
US Army Corps of Engineers BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS Galveston District Interim Stream Tool Lessons Learned a Year Later.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
US Army Corps of Engineers One Corps Serving The Army and the Nation U.S. Army Corps of Engineers Regulatory Program.
Army Corps permitting of shellfish culture, harvest and restoration Bill Dewey, Taylor Shellfish Company Shelton, Washington
Wetlands Important and often unappreciated lands..
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
CE 515 Railroad Engineering
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
EEP Data Flow Kevin H. Miller CVS-EEP Vegetation Monitoring Workshop Wake Technical Community College Northern Campus June 9, 2009.
California Wetlands: Update on new state definition and policy development California Native Plant Society Fall Conservation Symposium September 10, 2011.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Upper Blackfoot Mining Complex
Office of Surface Mining Reclamation and Enforcement MissionEnsure that coal mines are operated in a manner that protects citizens and the environment.
Changes in Spoil Electrical Conductivity (EC) and Sodium Adsorption Ratio (SAR) Following Irrigation at a Mine Site in Northwestern New Mexico Steven Perkins,
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
Federal Regulation of Land Use 9/27/11. What is NEPA? NEPA = National Environmental Protection Policy Act – Mandates an environmental assessment of all.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
California Rapid Assessment Method for Wetlands (CRAM) Project and Ambient Assessments.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Predation and the use of Tamarisk as a nesting substrate by Southwestern Willow Flycatchers (Empidonax traillii extimus) Stephanie Muise, Katie Stumpf.
Section 404 Permits Update
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Rivers Systems of the Southwest Native Species Natural Dynamics Impacts.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District Nationwide Permit Overview Cindy House-Pearson Chief, Inland.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Thursday, October 8, Kevin D. Johnson Stoel Rives LLP Thursday, October 8, 2015 Environmental and Regulatory.
Restoration and Regulation Discussion
October 26, 2016 Amanda Gumbert Extension Water Quality Specialist
The Oregon Watershed Council Model, USA
Coal Mining Activities
Overview of the Reissuance of 401 Water Quality General Certifications
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
Surface Mining Control And Reclamation Act of 1977 (SMCRA)
Wetland Mitigation.
Waters of the U.S. Updates and Changes
Pipeline Planning and Construction: Environmental Considerations
Restoration and Regulation Discussion
Environmental Regulations:
Presentation transcript:

Transitioning From Clean Water Act Nationwide Permitting To Individual Permitting Matt Owens Environmental Specialist 5 June 2013

Location M. Owens, Environmental Specialist, 5 June 2013Slide 2

BHP Navajo Coal Company (BNCC) M. Owens, Environmental Specialist, 5 June 2013Slide 3 Navajo Mine  Operations began in 1963  13,355 ha lease  Average annual production of 8.5 to 9 million tons  Sole supplier to Four Corners Power Plant (FCPP)  Existing contract with FCPP through 6 July 2016

Waters of the United States (WUS) M. Owens, Environmental Specialist, 5 June 2013Slide 4

Waters of the United States (WUS) M. Owens, Environmental Specialist, 5 June 2013Slide 5

Clean Water Act M. Owens, Environmental Specialist, 5 June 2013Slide 6 Definition Waters of the U.S (WUS) are all waters, including lakes, impoundments, rivers, streams and their tributaries, and wetlands which could be used for interstate, or foreign, commerce and recreation. (see 40 Code of Federal Regulations 230.3(s) for a full definition) Permitting Impacts to WUS are permitted through either Nationwide Permits (NWP) or Individual Permits (IP). NWPs are valid for and must be renewed every 5 years. –Minimal impact acreage, –Short duration project, and –Minimal public interest. IPs permit impacts for the entire project. –More than minimal impact acreage, –Long-term projects, and –Significant public interest.

Pre-2016 Mining and Reclamation M. Owens, Environmental Specialist, 5 June 2013Slide 7

Jurisdictional Determination M. Owens, Environmental Specialist, 5 June 2013Slide 8 Jurisdictional Determination (JD) Issued by the USACE and requires U.S. Environmental Protection Agency (USEPA) concurrence, Formal agency decision and can be challenged and appealed, and Generally takes longer for both USACE and USEPA approvals. Preliminary Jurisdictional Determination (PJD) Issued by USACE, does not require USEPA concurrence, Non-binding, indicates there may be WUS present on-site, All WUS are treated as jurisdictional WUS for purposes of calculating impacts, and Applicant may complete a approved/ formal JD at a later date. The PJD indicated the Pre-2016 mining activities would impact 0.7 ha of WUS.

Results of the Preliminary Jurisdictional Determination M. Owens, Environmental Specialist, 5 June 2013Slide 9 Pre-2016 mining would impact 0.7 ha of WUS.

Timelines M. Owens, Environmental Specialist, 5 June 2013Slide 10 Regulatory Operational

Permitting M. Owens, Environmental Specialist, 5 June 2013Slide 11 USACE Permit SPA Issued on 20 March 2012 to BHP Navajo Coal Company, Authorizes impacts to 0.7 ha of WUS for Pre-2016 mining activities, and Final mitigation ratio 3.9:1 (2.73 ha of mitigation for 0.7 ha of impact). Permit Conditions Implement the Lower Chinde Habitat Mitigation and Monitoring Plan to mitigate the impacts to the WUS, Conduct annual monitoring, and Meet the performance standards of the mitigation plan after 5 years.

Lower Chinde Habitat Mitigation and Monitoring Plan M. Owens, Environmental Specialist, 5 June 2013Slide 12

Lower Chinde Habitat Mitigation and Monitoring Plan M. Owens, Environmental Specialist, 5 June 2013Slide 13 Mitigation Plan Components Monitoring well installation, Exotics removal, and Riparian enhancement.

Lower Chinde Habitat Mitigation and Monitoring Plan M. Owens, Environmental Specialist, 5 June 2013Slide 14 Monitoring Well Installation Installed 4 monitoring wells for water level sampling. Exotics Removal Removed of 3.7 ha of tamarisk (Tamarix ramosissima), Russian olive (Elaeagnus angustifolia), and Canada thistle (Cirsium arvense), Exotics removed with mechanical and chemical methods, and Follow up herbicide treatments will continue for 5 years.

Lower Chinde Habitat Mitigation and Monitoring Plan M. Owens, Environmental Specialist, 5 June 2013Slide 15 Riparian Enhancement Plantings installed a year after exotics removal. Planting to consist of native species including Plains cottonwood (Populus deltoides), coyote willow (Salix exgua), New Mexico olive (Forestiera neomexicana), sumac (Rhus trilobata), and Ribes spp. Willow plantings will potentially enhance endangered southwestern willow flycatcher (Empidonax traillii extimus) habitat. Sumac containerized stock Willow pole plantings

Lower Chinde Habitat Mitigation and Monitoring Plan M. Owens, Environmental Specialist, 5 June 2013Slide 16 Mitigation Performance Standards Performance StandardThreshold Perennial exotic speciesLess than 1% cover of perennial exotic species Annual exotics speciesLess than 3% cover of annual exotic species Riparian Areas-8-10 co-dominate species, -A Horizontal Interspersion score of at least “B”, -No exotic species identified as co-dominant, and -Minimum 45% survival in year 5 for planted shrubs and trees. Horizontal Interspersion From California Wetlands Monitoring Workgroup (CWMW) California Rapid Assessment Method (CRAM) for Wetlands, Version 6.1 pp. 67

Summary M. Owens, Environmental Specialist, 5 June 2013Slide 17 Benefits of Transitioning to an IP Versus a NWP Relieves operational burden of verifying NWP every 2 years, Relieves operational burden of renewing NWP permits every 5 years, and Provides long-term permitting stability (unless permit is revoked by USEPA). –An IP allows operator to permit a complete project, in this case all new mining impacts related to Pre-2016 mining operations. –A NWP only allows an operator to permit the impacts for the term of the NWP and provides no future certainty after that NWP term.

Summary M. Owens, Environmental Specialist, 5 June 2013Slide 18 Challenges of Transitioning to an IP Versus a NWP Requires in-depth review of future mining operations and alternatives, Permitting triggers National Environmental Policy Act (NEPA), and Surface Mining Control and Reclamation Act (SMCRA) reclamation drainages may no longer be acceptable as Clean Water Act mitigation measures.

Acknowledgements M. Owens, Environmental Specialist, 5 June 2013Slide 19 Kent Applegate (co-author), Environmental Superintendent - Projects, BHP Billiton New Mexico Coal Brent Musslewhite, Tim Ramsey, Jeremy Niemeier, and Josh Voss, BHP Billiton New Mexico Coal Deana Cummings, Project Manager, U.S. Army Corps of Engineers – Albuquerque District Mike Fitzgerald, Matt Smith, and Ryan Unterreiner, Ecosphere Environmental Services, Durango, CO