©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 1 Capacity Decisions Defining.

Slides:



Advertisements
Similar presentations
Sales and Operations Planning (Aggregate Planning)
Advertisements

Capacity Planning.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Managing Capacity Chapter 8
Managing Capacity.
Global Manufacturing and Materials Management
MD707 Operations Management Professor Joy Field
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
CAPACITY LOAD OUTPUT.
Sales and Operations Planning (Aggregate Planning)
Types of Inventory Transit stock or pipeline inventory Cycle stock
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Accounting Information, Relevant Costs, and Decision Making
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
INTRODUCTION TO BUSINESS
Global Manufacturing and Materials Management
Business Processes. Chapter 3, Slide 2 ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Business.
Chapter 6 Product Design & Process Selection-Manufacturing
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
For Products and Services
Improving Productivity & Quality
Operations Management
Operations and Supply Chain Strategies
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
Ch 5(B) : Capacity Planning: Break-Even Analysis
Introduction to Operations and Supply Chain Management
Sourcing Decisions.
Purchasing.
Sales and Operations Planning (Aggregate Planning)
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield.
Chapter 6 Production Processes.
Objectives After completing this chapter, you will be able to:
Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
Slide 1 Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Chapter 18 Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Strategic Production Planning Now showing at your local university.
Economics Chapter 5: Supply Economics Chapter 5: Supply Supply is the amount of a product that would be offered for sale at all possible prices in the.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
6-1 Islamic University of Gaza Managerial Accounting Cost Volume Profit: Additional Issues Chapter 2 Dr. Hisham Madi.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Chapter SevenCopyright 2009 Pearson Education, Inc. Publishing as Prentice Hall. 1 Chapter 7 The Theory and Estimation of Cost.
Global Production, Outsourcing, and Logistics
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
Operations and Supply Chain Strategies. Chapter 2, Slide 2 ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth.
Chapter# 6 Supply Network Design · The supply network perspective, pp
Chapter 6 Managing Capacity
Capacity Planning Pertemuan 04
Managing Information Technologies Across the Supply Chain.
Managing Capacity. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 2 Capacity.
Operations Management Capacity Design
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
COST–VOLUME–PROFIT ANALYSIS: ADDITIONAL ISSUES
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Pricing Decisions and Cost Management Chapter 12.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
DEMAND FORCASTING. Introduction: Demand forecasting means expectation about the future course of the market demand for a product. Demand forecasting is.
Chapter 4 Supply. 2 Bestar, Canadian furniture manufacturer Revenue (C$ mill) Restructuring costs (C$ ‘000) n.a.1,400n.a. Net.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Facilities and Aggregate Planning
The Theory and Estimation of Cost
Capacity Planning.
Operations Management Capacity Design
Production and Operations Management
E Learning Curves PowerPoint presentation to accompany
Capacity Planning For Products and Services
Presentation transcript:

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 1 Capacity Decisions Defining and measuring capacity Strategic versus tactical capacity Evaluating capacity alternatives Advanced perspectives –Learning curves

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 2 Measure of an organization’s ability to provide goods or services Jiffy Lube: Oil changes per hour Law firm: Billable hours College: Student hours per semester Defining and Measuring Capacity

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 3 Consider: Capacity for a PC Assembly Plant: (800 units/shift/line) × (% Good) × (# of lines) × (# of Shifts) 1 or 2 shifts? 2 or 3 lines? Employee training? Controllable Factors Uncontrollable Factors Supplier problems? 98% or 100% good?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 4 Strategic versus Tactical Capacity Strategic: –One or more years out –“Bricks & Mortar” –Future technologies Tactical: –One year or sooner –Workforce level, inventory, etc.

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 5 Capacity Time Strategic Capacity Planning “Bricks & mortar” decisions High-level planning High risk Tactical Planning Workforce, inventory, subcontracting decisions Intermediate-level planning Moderate risk Planning & Control Limited ability to adjust capacity Detailed planning Lowest risk Days or weeks outMonths out Years out Capacity versus Time

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 6 Capacity Strategies: When, How Much, and How? Leader Laggard Demand Lost Business Excess Capacity

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 7 How? Make or Buy (e.g., subcontracting) One extreme: “Virtual” Business Walden Paddlers (Marketing) Hardigg Industries (Manufacturing) General Composites (Design) Independent Dealers (Direct Sales)

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 8 Evaluating Capacity Alternatives Economies of scale (EOS) Break-even points (BEP) Expected value analysis (EVA)

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 9 Economies of Scale Total Cost for Fictional Line: Fixed cost + (Variable unit cost)×(X) = $200,000 + $4X Cost per unit for X=1? X=10,000?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 10 Fixed - Unit Cost Scenarios

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 11 Break-Even Point (BEP) Considers revenue and costs Suppose each unit sells for $100: BEP: $100X = $200,000 + $4X What is the breakeven volume, X?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 10, Slide 12 Expected Value Analysis

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 13 Data Requirements Capacity cost structure (alternatives?) Expected demand (multiple scenarios?) Product and service requirements (e.g. time standards) EVA

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 14 Expected Value Analysis Pennington Cabinet Company 2000 jobs per year (20% likelihood) 5000 jobs per year (50%) 7000 jobs per year (30%) Each job = $1,200 revenue

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 15 We Know: Average job requires: 2 hours of machine time 3-1/3 hours of assembly team time Machines and teams work 2000 hours per year Each machine and team has yearly fixed cost = $200K 3 different capacity scenarios (see next page!)

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 16 Effective Capacity What is the effective capacity of each capacity alternative? Number of Machines and Teams Number of Hours Available Each Year Maximum Jobs per Year MachinesTeamsMachinesTeamsMachinesTeams Current356,00010,0003,000 Expanded5910,00018,0005,0005,400 New Site71214,00024,0007,0007,200

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 17 Alternate Demand Scenarios What is the expected contribution if demand = 5000 AND we decide to move to a new site? Why does revenue for current capacity max out at $3.6 million? Current LevelExpandedNew Site DemandRevenue Fixed ExpensesRevenue Fixed ExpensesRevenue Fixed Expenses 2,000$2,400,000$1,600,000$2,400,000$2,800,000$2,400,000$3,800,000 5,000$3,600,000$1,600,000$6,000,000$2,800,000$6,000,000$3,800,000 7,000$3,600,000$1,600,000$6,000,000$2,800,000$8,400,000$3,800,000

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 18 Net Revenue Table DemandCurrentExpandedNew Site 2,000$800,000$400,000$1,400,000 5,000$2,000,000$3,200,000$2,200,000 7,000$2,000,000$3,200,000$4,600,000

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 19 Expected Value of Each Capacity Alternative: Current capacity level (20%) × $800K +(50%) × $2000K +(30%) × $2000K =$1,760,000

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 20 Expanded capacity level (20%) × - 400K +(50%) × $3200K + (30%) × $3200K =$2,480,000

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 21 New Site (20%) × - $1400K +(50%) × $2200K +(30%) × $4600K =$2,200,000

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 22 Self Test EBB Industries must decide whether to invest in a new machine which has a yearly fixed cost of $40,000 and a variable cost of $50 per unit. What is the break even point (BEP) if each unit sells for $200? What is the expected value, given the following demand probabilities: 250 units (25%), 300 units (50%), 350 units (25%)

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 23 Learning Curves Recognize that people (and often equipment) become more productive over time due to learning. First observed in aircraft production during World War II Getting more emphasis as companies outsource more activities

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 24 A Formal Definition For every doubling of cumulative output, there will be a set percentage improvement in time per unit or some other measure of input Output Time per unit 10 hrs. 8 hrs. 6.4 hrs hrs hrs. 80% learning curve - Where does the name come from?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 25 A Formal Definition (cont’d) Where:T n = time for the nth unit T 1 = time for the first unit b = [ln(learning percent)] / ln2

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 26 Example Reservation clerk at Delta Airlines First call (while training) takes 8 minutes Second call takes 6 minutes What is the learning rate? How long would you expect the 4th call to take? The 16th? The 64th?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 27 Key Points Quick improvements early on, followed by more and more gradual improvements The lower the percentage, the steeper the learning curve Practically speaking, there is a floor Estimates of effective capacity must consider learning effects!

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 10, Slide 28 Another Question... How could learning curves be used in long-term purchasing contracts?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 29 Johnston Controls I Johnston Controls won a contract to produce 2 prototype units for a new type of computer. First unit took 5,000 hrs. to produce and $250K of materials Second unit took 3,500 hrs. to product and $200K of materials Labor costs are $30/hour

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 30 Johnston Controls II The customer has asked Johnston Controls to prepare a bid for an additional 10 units. What are Johnston’s expected costs?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 31 Johnston Controls III Labor learning rate: 3500 hours / 5000 hours = 70% Materials learning rate: $200K / $250K = 80%

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 32 Johnston Controls IV “Additional 10 units” means the third through twelfth units. Total labor for units 3 through 12: =5,000 hours × ( ) = 19,005 hrs is sum of n b for 12 units 1.7 is the sum of n b for the first two units

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 33 Johnston Controls V Total material for units 3 through 12: = $250,000 × ( ) = $1,356,750

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 34 Johnston Controls (cont’d) Total cost for “additional 10 units”: = $30 × (19,005 hours) + $1,356,750 = $1,926,900 What if there is a significant delay before the second contract?

©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 35 Self-Test Assume that there WILL BE a significant delay before Johnston Controls makes the next 10 units. Assuming that Johnston has to “start over” with regard to learning, estimate total cost for this additional 10 units.