1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
June 11, 2003TKR Geometry Review1 Review of Tracker Geometry Overall view Recent bug fixes –Offset –Wrong Converter Typical tray “Active” tracker –Vertical.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Geometry of the Tracker in the Flight Instrument The following slides present an overview of the geometry of the tracker. Dimensions corresponding to constants.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
GLAST:Gamma Ray Large Area Telescope
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
BM&N STS ladders assembly in VLHEP
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
GLAST Large Area Telescope:
Ladder Assembly All tools and jigs produced Glue dispensing works
Investigation on tray MID 063 Back
Rod adaptors for module tests Module positioning studies
GLAST Large Area Telescope:
1st solution. Cut internal to the plate with startup hole
Presentation transcript:

1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez INFN - sez. Pisa

2 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Pre-engineering model tower (2001) Engineering model tower (february-july 2002) Qualification tower 17 flight towers (16+1spare) The pre-engineering tower is now ready and it will be tested next week at SLAC Construction program

3 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Purpose of the pre-engineering tower: 1.Experimental validation of the mechanical project (drawings and materials) 2.Experimental validation of the tray assembly procedure 3.Qualification of the tray producers (PCI California, Plyform Italy) 4.Experimental validation of the tower assembly procedure 5.Dynamical test of the trays (vibrational) 6.Thermal test of the trays 7.Dynamical test of the tower (vibrational) Italian efford: 1.superGLAST (W=18%Xo) payload study 2.Production of 4 superGLAST trays 3.Tray vibrational test 4.Production of 1 GLAST (W=3%Xo) tray Different procedures of tray and tower assembly have been developed: 1.US procedures more close to the BTEM experience 2.Italian procedures with more attention to the large series production

4 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Hytec tray assembly strategy: Gluing at 120 o C face-sheets, honeycomb and closeouts with a monolithic graphite tool. There are problems due to the CTE mismatch between graphite and Carbon-Carbon Complicate tool, hard to control it. Hytec (Los Alamos- New Mexico) tray assembly scheme developed in collaboration with PCI (Ontario, California)

5 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Assembly procedure guideline used in Plyform: Structural gluing of the face sheets with the honeycomb under moderate pressure (0.2atm) at high temperature (Redux 312 UL, 100g/m 2 foils, cured at 120 o C) Room temperature gluing of the closeouts (Redux 420 AB) References holes used for tray assembly and for subsequent alignments situated on the closeout

6 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa BASECOVER TRAY ASSEMBLY JIG

7 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa FEM of the tray assembly jig

8 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa SuperGLAST tray without payload The Engineering Model trays will be done with fully Carbon-Carbon closeouts, without the Al particulars M2.6 thread holes F3 reference holes M2.6 thread holes

9 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Planarity of the GLAST tray #0 produced by Plyform Vacuum bag differential pressure = 0.2Atm

10 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa CMM measurements of the sides of the tray mean dimensions= mmX mm *** WBS TRACKER (R. Johnson) TKR Mechanical * The stacking test and measurements on the PCI carbon- composite trays showed that the jigging as used at PCI did not hold the dimensional tolerances sufficiently well. Those trays will be machined slightly to fix them up for further tests. * The room-temperature cure method and jigging used at Plyform (the intended fabrication vendor for engineering model and flight panels) does appear to hold tolerances sufficiently well, based on 3 trays measured MCM side

11 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa The tungsten gluing tool has 16 vacuum pockets to align the tungsten plates The glue is deposited both on tray and on tunsten plates. The tray is aligned by means of dowels. A 0.2Atm pressure is applied over the tray.

12 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Kapton bias circuits gluing tool 1: alignment of the 2 kapton bias circuits on 2 vacuum chucks and glue deposition 2: alignment of tray over the bottom chuck 3: gluing at room temperature of the two circuits together in a reduced vacuum bag (0.2Atm)

13 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa bridge handle Z micrometers guide shoulder bridge pins tray pins Assembly of the ladders over the tray

14 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Transfer bridge Assembly of the ladders on the trays Ladder assembly tool

15 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa

16 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Problems: the ladder assembly jig is not safe for this purpose : the ladder rubs the reference walls when it is lift on. The friction can cause the lost of the vacuum fixation of the ladder which can move without control A new alignment tool is under project

17 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Need to have a better control of the parallelism and of the distance of the two silicon layers

18 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa An assembly tests has been performed at SLAC during PDR using BTEM assembly concept: Each tray has  2mm precision holes on the 4 corners 4 corner posts refer one tray respect to the subsequent one The posts define the height and the horizontal position of the trays in the space The side wall are added at the end Corner posts  2mm h Tower assembly procedure: US proposal Alignment errors pileup even with very demanding requirements on the tolerances, the final alignment is poor

19 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa z yx Pre-assembly of the tower in open condition: The trays are hold and positioned by the 2 reference walls. Two sides are completely free On the other two sides the slots of the reference walls allow full cabling Italy assembly concept: Refer the trays to the side walls of the tower. The side walls are Carbon fibre plates, 1.5mm thick. On the side walls there are holes for the screws and precision holes in correspondence with the reference holes on the tray closeouts. Each tray is referred to the side walls reference system independently of the other trays

20 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Stop pin Reference pin Screwing holes Stop pins: 4 pins on the corners avoid accidental contacts between the trays Reference pins: 3 pins define the height and the position of the tray in space The tray is screwed against one of the reference walls

21 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa When the tower is fully assembled, cabled and tested, two reference walls put in place the first two side walls. The trays are referred and fixed to the carbon fibre side walls The reference walls with the slots are removed The last 2 side walls are put in place with other 2 reference walls Reference walls of the X side walls

22 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Tower assembly and vibrational test: SLAC february The components of the pre-engineering tower have been produced: Top, bottom and 4 GLAST trays made by PCI following the Hytec assembly procedure 9 Aluminium mass models (trays with Al closeouts, honeycomb and face-sheets, with similar mechanical properties) produced by SLAC 4 superGLAST trays produced by Plyform following the INFN assembly procedure This week a full assembly exercise of the tower will be carried out at SLAC The week after the tower will be shaked

23 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa Conclusions A prototype of the engineering tower is ready to be mounted The engineering of two ladder production lines (G&A,Mipot) and of one tray assembly line (Plyform) has been completed successfully Open questions: QA of the tray assembly line not yet developed. Engineering Model : CMM measurements in INFN Dynamical tests: in Centrotecnica (samples) + qualification (all trays) Need to develop a light system to check dinamically the workmanship at different levels (search of main resonance modes)