Market Services Stakeholder Session January 12, 2011.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

Operating Reserves --- Again A Discussion Primer
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
T&SC Modification Proposal: Clarification of Outturn Availability
All Island Single Electricity Market IWFA Update Laura Brien
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
An Overview of: Generation Connections: Transmission Connection Cost Responsibility Review July
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
European Developments Transmission Workgroup 3 rd May 2012.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Efficient procurement of extended reserve Workshop 3 – operational management 28 April Auckland Clive Bull – Strata Energy Consulting.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
Grid Code Development Forum – 6 September 2017
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Two-Tier Firm Curtailment Overview
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Market Services Stakeholder Session January 12, 2011

2 Agenda Introductions, 2010 in review, the year aheadKelly Gunsch Market SuspensionAnita Lee Supply SurplusRuppa Minhas Coffee Break Wind IntegrationJacques Duchesne Intertie Framework – ATC AllocationKevin Dawson Transmission Constraint Management / Remedial Action Schemes Gordon Nadeau Questions & Answers

3 Consultation and Conceptual Design Definition of the Problem Clear Interpretation of Policy Framework Share our Data & Analysis Share our Research & Learnings from Other Markets Review Progress Against Objectives 12 – 18 months Iterative Consultation if New Ideas, New Concerns, New Data

4 Solution Development and Implementation Conceptual design - define success - idea generation - stakeholder consultation - iterative - rules development *AUC approval now required Detailed design - processes - systems - procedures - training Implementation - process changes - system changes - testing & training Operationalize Steps may be iterative, performed more than once within each initiative Feedback loop – is the implemented solution achieving the initial objectives?

& 2011 Priorities Wind –Integrate new wind –Complete implementation of Phase 1 –Phase 2 Interties –Integrate MATL –ATC Allocation –Intertie (ATC) restoration initiatives –Implementation of long term framework Demand Response –LSSi –Brattle Review TCM & RAS –Compliance Filing & Phased Implementation –Draft RAS Rule Contingency Rules –Supply Surplus –Market Suspension FEOC Regulation Implementation –AESO Rule updates necessary Outage Information Sharing Market Rule Transition (TOAD program) OR Redesign

Market Suspension Anita Lee, P.Eng. PMP January 12, 2011

7 Purpose of review Current rule is outdated (e.g., pricing methodology) Current rule does not differentiate between events of lesser impact (such as temporary loss of the dispatch tool) and events of more significant impact (such as an AIES blackout) Ensure market suspension is only used as a last resort

8 Status Update Recommendation Paper issued December 2, 2010 Stakeholder comments due January 14, 2011 – comments to be sent to Development of rule changes in Q Stakeholder consultation on rule changes in Q2 2011

9 Highlights of Recommendation Paper Limited Market Operation –Triggered when: There is a temporary outage to market operation tools (DT or ETS) The System Controller cannot access market operation tools after evacuation from the System Coordination Centre and before the Backup Coordination Centre is activated

10 Highlights of Recommendation Paper During limited market operation: –The System Controller will use the best available EMMO for energy market dispatch –DDS dispatch and AS dispatch will be limited –Payments to Suppliers on the Margin (PSM) will be suspended –The System Marginal Price (SMP) will be set by the highest price block dispatched in the EMMO in use

11 Highlights of Recommendation Paper Market suspension triggered when: –There has been an extended period of market operation tool outage, –The System Controller has evacuated the System Coordination Centre and cannot access or activate the Backup Coordination Centre, –The AIES has broken into two or more electrical islands, or –The AIES has experienced a blackout

12 Highlights of Recommendation Paper A market suspension –Must be authorized by the AESO CEO or his designate, except in the case of an AIES blackout where it can be declared by the System Controller During a market suspension The System Controller will not necessarily follow the EMMO, but will direct generation as necessary to maintain system reliability

13 Highlights of Recommendation Paper System Marginal Price during a market suspension will be determined as: –30 day rolling average on peak price and 30 day rolling average off peak price, prior to initiation of the market, or –$ when all available energy is dispatched and the System Controller invokes Supply Shortfall procedures in order to manage supply and demand balance

14 Highlights of Recommendation Paper A cost-based mechanism will be provided –To ensure generators’ operating costs are covered –The cost calculation formula is similar to that for Long Lead Time Energy (LLTE), except generator start up costs are only included if a generator is directed by the System Controller to start during a market suspension, and Directed off by the SC during the market suspension, or Dispatched off by the SC upon the cancellation of the market suspension and return to normal market operation

15 Next Steps Comments on the Market Suspension Recommendation Paper are due this Friday, January 14, 2011 to

Questions?

Supply Surplus Recommendations Ruppa Minhas January 12, 2011

18 Status Update AESO responses to stakeholder comments on the Supply Surplus Discussion Paper published December 2, 2010 Supply Surplus Recommendation Paper published for stakeholder comment on December 2, 2010 –Stakeholder comments on the Recommendation Paper are due January 14, 2011

19 Supply Surplus Supply Surplus: –More supply than demand at $0 Purpose: –Provide recommendations on the solutions for managing supply surplus conditions

20 Recommendations - Summary No exemption for wind generators and cogenerators Implement of voluntary generator curtailment request (VGCR) Allow exports within T-2 Update minimum stable generation (MSG) Supply surplus report –Implemented December 8, 2010 A voluntary generator curtailment program (VGCP) –Not recommended

21 Recommendation - No exemption for wind and cogenerators It is necessary to include all generation types in the supply surplus procedures so that they are all on a level playing field Allowing a blanket exemption for one generation type will not accomplish this

22 Recommendation - No exemption for Cogenerators To ensure a FEOC market the rules must consider, and, to the extent possible, accommodate the different characteristics of each generation type without unduly favouring one type of generation over another Minimize the impact to cogen facilities as a result of supply surplus: –Electric energy produced and consumed on site is not subject to the ISO rules: EUA, Section 2(1)(b) Cogenerators will not be curtailed below 0MW net to grid –Generators will be curtailed to their MSG level Revise MSG definition to better accommodate current generator limitations

23 Minimum Stable Generation MSG definition and application requires an update MSG workgroup –Meeting was held in October 2010 Further consultation: –Meeting again soon: To finalize the proposed definition To discuss options for changing the application of MSG –To allow participants to change the MSG value on a time- ahead basis

24 Comparison – Supply Surplus and Supply Shortfall Supply SurplusSupply Shortfall $0 More supply than demand Need to achieve supply-demand balance $ More demand than supply Need to achieve supply-demand balance Curtail current hour import transactions Included within existing and recommended procedure Reduce export ATC to zero Step 6 in OPP 801 Voluntary Generator Curtailment Request Request to market to allow generators to voluntarily curtail supply Request to market to provide supply Step 4 in OPP 801 Allow exports within T-2 Low cost and easy to implement Allow imports within T-2 Step 5 in OPP 801 Assess an assets involvement in RR, consider re- dispatch if required Included within existing and recommended procedure Issue directive for excess reserves Step 19 in OPP 801 Supply Surplus Report Provides the market with an indication of potential supply surplus conditions Supply Adequacy Report Provides the market with an indication of potential supply shortfall conditions

25 Voluntary Generator Curtailment Program (VGCP) VGCP not recommended at this time Received mixed participant support and most participants were not in favour May be a more complex solution than is required Not required at this time

26 Recommendation – Supply Surplus Procedure 1)Curtail current hour import 2)Maximize the posted export ATC limit 3)Send out a VGCR request to voluntarily reduce generator output. 4) Dispatch flexible blocks of the $0 offers for partial volumes on a pro-rata basis and direct wind generation on a pro-rata basis. 5) Direct assets with inflexible $0 offers to MSG 6) Assess an assets involvement in RR, consider re-dispatch if required

27 Supply Surplus Report Available on the AESO website on December 8, 2010

28 Next Steps Stakeholder comments on recommendation paper due January 14, 2010 to MSG workgroup meeting soon –Invite will be sent out through the weekly stakeholder and posted on the AESO website once scheduled

Questions?

Coffee Break

Wind Integration Program Jacques Duchesne P. Eng. Program Manager, Wind Integration January 12, 2011

32 Wind Integration – Objectives Phase 1: Wind integration management plan designed and implemented to safely integrate 1100 MW of wind by end of 2011 Phase 2: Wind integration plan for up to 4000 MW

33 Agenda Program overview Status update phase 1 –Wind Technical Rule –Wind power management –Forecasting Status update phase 2 –Discussion Paper –Stakeholder sessions

34 Wind Integration Program – High Level View / 2013 Wind Power Forecast Integration Design Wind Power Forecast Roll-out

35 Phase 1 Update Wind Technical Rule –Filed with AUC August 2010 –Hearing scheduled for February 28 Phase 1 Recommendations - September 2010 –Use EMMO as primary tool –Use wind power management when wind ramping up too fast –For wind ramp down, activate contingency reserves from standby. No additional volume required at 1100 MW wind. –Continue implementation of centralized forecast

36 Wind Forecast Signed contract with WEPROG January 2010 Forecast will: Reduce wind related Area Control Error (ACE) events Decrease the amount of wind generation impacted by Wind Power Management Provide visibility to system controllers Developed implementation guide November 2010 Roll-out to existing wind farms in progress

37 Phase 2 - Status Market and Operational Studies completed December 2010 –Cases: 1575 MW, 1700 MW, 2500 MW & 4000 MW Issued Discussion Paper for comments – December 2010 –Comments due back January 28 Will hold stakeholder consultation to explore in Q 2011

38 Phase 2 Summary – Discussion Paper Rely on the Energy Market Merit Order Increase regulating reserve volumes. Refine short-term wind integration recommendations Develop a ramping service Develop a wind firming service: A market service could be developed to firm overall wind production Develop must offer must comply (MOMC) rules for wind

39 Next Steps Phase 1 –Tool to calculate ramp rate and system wind power limit –Consult on rule defining use of WPM –Site specific forecast integration Phase 2 –Stakeholder comments due back January 28 –Ongoing consultation – wind working group Q1 2011

40 Next Steps Comments on the Phase 2 Wind Integration Discussion Paper are due Friday, January 28, 2011 to

Questions?

Intertie Framework – Available Transfer Capacity Allocation Kevin Dawson, Program Manager, Interties January 12, 2011

43 Intertie Framework – Today’s Agenda Summary of Intertie Framework Recommendation Paper Overview of recent ATC information package (letter, term sheet) Discussion on ATC allocation recommendation – Options considered – Recommendation – Next steps

44 Intertie Framework Recommendation Paper Intertie Framework Recommendation Paper published October 7, 2010 contained four main recommendations: – ATC allocation by energy price and then pro rata – Implement dynamic scheduling – Develop and implement a merchant transmission service (MTS) tariff – Plan system so each intertie can simultaneously transfer path rating Stakeholder comments have been received and posted

45 Intertie Framework – ATC Allocation Immediate focus on ATC allocation as third tie line under construction will result in requirement to allocate limited ATC among multiple interties ATC letter and term sheet posted December 16, 2010 –For information purposes –Provides overview of new rule framework Process going forward –Rule drafting in progress (in integrated format) –Rule cycle for February / March Fulsome opportunity for comment on rule change and rule language

46 Intertie Rules – Term Sheet Overview Rule framework integrates previous OPPs with rules – Limits Total and Available Transfer Capacity (TTC, ATC) – Scheduling – Validation and setting of schedules – Congestion management on the interties – Dispatching intertie schedules Term sheet provides overview of new rule format outlining proposed rule provisions and how they map to current rules and OPPs – Highlights where rule changes are recommended – allocation of ATC

47 ATC Allocation – Design Choices Approval process – Approve tags, allow for other scheduling authorities to make cuts using their criteria (tariff) Alternative does not recognize commercial product in other jurisdiction and may prematurely reject tags Timeline – Xx:45 consistent with objective noted above Earlier alternatives, e.g., T-2, perhaps more consistent with rest of market but don’t recognize products in other jurisdictions and may reduce overall intertie utilization Procedures – Submissions, scheduling and congestion management Discussed below

48 ATC Allocation Recommendation Recall – current method is to curtail on a last in, first out (LIFO) basis New proposal – pro rata –At xx:45, assessment and validation –Test for oversubscription first at system, then AC, then intertie level –Resolve any oversubscription by: Netting out counterflows and wheelthroughs Price (when implemented) Pro rata of equal priced offers / bids at assessment level (system, AC, intertie)

49 Example ATC Pro Rata Allocation Math Simplified example – no wheelthrough and only 1 tag per import/export In this example, system limit is OK but AC import limit is violated BC and Montana imports pro-rated down by 100 MW to come within limits All interties are within limits

50 Congestion Management Choices Number of choices considered and rejected: –Pro rata math limited to maximum of ATC on any line instead of schedules Recognize incentive to over schedule, however “must supply” if dispatched May need to revisit if “must supply” risk is not sufficient to limit behaviour, but mathematically implementation is problematic –Curtail first at intertie level, then AC, then system No opportunity at xx:45 to optimize process. Recognize that on occasion cut at intertie level may be more efficient. Will monitor to see if occurrence more frequent than expected. Expect ability to “net schedule” at system level should allow for maximized utilization of ATC –Curtail by participant not tag Fairness issue

51 Next Steps ATC term sheet comments welcome but not required Rules process for integrated rule language to commence in February Expect rule filing with AUC by end of March, 2011

Questions?

Transmission Constraint Management & Remedial Action Schemes Gordon Nadeau January 12, 2011

Transmission Constraint Management

55 Transmission Constraint Management AUC Decision Original proposed rule was deemed to be technically deficient and the AESO has addressed those deficiencies by: –defining the scope of the rule –providing clarity around certain steps –defining specific fundamental terms –defining the use of TMR

56 Transmission Constraint Management AUC Decision ENMAX proposal: –Not generally consistent with the AESO’s approach, as stated by the Commission –has perverse incentives –not compatible with the current market design

57 Transmission Constraint Management - Rule Filing Submitted the rule 9.4 as a compliance filing on December 16, 2010 TCM update letter on the AESO progress on TCM Initiatives TCM rule language comment response matrix Rule was filed in accordance with section 20.5(2) of the EUA AUC will provide further direction

58 Transmission Constraint Management- Implementation Once a final decision is received: –Operational tool development –OPPs will be aligned and filed in stages in 2011 and full implementation of Rule 9.4 thru OPPs and systems to proceed through 2012

Remedial Action Schemes

60 Remedial Action Schemes Background Remedial Action Scheme (RAS) consultation has proceeded in parallel with TCM rule 9.4; part of comprehensive consultations on constraint management On July , the AESO initiated formal rule consultation on a proposed Connection RAS rule and provided a draft RAS ID to help clarify the policies applied to Connection RAS Stakeholder comments on the proposed Connection RAS rule were posted to the AESO website on September 9, 2010

61 Current Connection RAS Status The AESO is currently considering stakeholder comments Some stakeholders are seeking clarity on AESO connection policies; others are looking for firm AESO commitments during the connection process The AESO is of the view that further consultation is required to discuss these issues and potentially broaden the scope of the Connection RAS rule Targeting first half of 2011 for filing rule with AUC

Questions?

Thank you