Plants in Kay-Cee Distillery § Fermentation Plant § Distillation Plant § Bottling Plant.

Slides:



Advertisements
Similar presentations
Sofient Solutions SCF-86, 2 nd Floor, Phase XI, Mohali (Punjab) Phone No: , Sofient Works Appliance
Advertisements

Water Quality Testing Setting up a pH test with LoggerPro.
Proper Care and Setting of ULTRA-MILL  Cutters. January 25, Introduction ULTRA-MILL  ULTRA-MILL  ULTRA-MILL  cartridges with diamond tips are.
Module shoulders The purpose of this module is to arrange the shoulders in one and the same position, ready oriented to be put onto the mandrels. Shoulder.
The Process of Production. Wooden department The first process of production is the wooden department. Here, layers of European beech wood, are glued.
Market Handling Condition Study Observations of Field Condition ( Bad Practices ):- Required to do to cope up the situation:- Product is being tied very.
Ejection module is the last mechanism in KOMBIS TMM8003. It is designed to eject the ready tube from machine.
Case Packing A World of Material Handling Solutions.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
Case Study 6: Concentrate Line at Florida Citrus Company
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
Robots An Introduction. Various Robot Fields: Aerospace (air travel, space exploration) Exploration (underwater, space, volcanic) Entertainment Medical.
1/32 Equipment Efficiency: Quality and Poka-Yoke (Mistake- Proof, 防錯法 ) Operations Analysis and Improvement 2010 Fall Dr. Tai-Yue Wang Industrial and Information.
Warehousing Decisions
QUALITY TOOLS FOR CSSD PRODUCTION
Palletizing the Easy Way
Production Logistics and ERP
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Jeremy brosh Orbeso partner:jason Torres. Table of contents 1. Title 2. Table of contents 3. Question 4. Hypothesis 5. Materials 6. Procedures 7. Conclusion.
& Making it Work Together. Why Manco Systems ? Interface with MANMAN Understanding of Bullard’s Needs Willing to Modify ManBar System Completeness of.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
SM 900 PRESSURE SENSITIVE MACHINE. MACHINE FEATURES Wiping Station Labelling station Feed screw.
IENG 451 Standardized Work. Benefits of Standardization – Process stability – stability means repeatability – Clear stop and start points for each process.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Horizontal Carousel System “Good” carousel stock is typically a subset of the SKUs that have medium velocity They are called for often enough to make automatic.
Vision-Based Metrology
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
There are 1000 millilitres in a litre False True 1.
Manufacturing Solutions- Yarn Dyeing TexManage. Yarn Dyeing Solutions Solution Arrangement Data Collection Production Planning Barcode Application Despatch.
1 1. Systems and Software Development 1.1 The Systems Life Cycle.
FlexLink – your dairy production logistics expert New levels for dairy production logistics.
1 Warehouse Management Overview from from The Systems House, Inc.
Project Chiron SMU TEAM ALCON
PEPSI STARTER PALLET KIT PN: INSTALLATION INSTRUCTIONS.
Resources for Technology Chapter 2. Resources for Technology There are seven resources that are necessary in every technological systems.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Golf Score Business Excellence Revision A October 5, 2007 BE-TL2-006-DRAFT-Golf Score.
Welcome to Parth Engineers & Consultant Website: ID: Mo No.:
Welcome to Parth Engineers & Consultant Website: ID : Mo. No. :
Track and Trace Systems Track and trace systems is a comprehensive solution for the pharmaceutical industries in protection against counterfeit, ensures.
DL SHAH AWARD QUALITY COUNCIL OF INDIA QUALITY IMPROVEMENT & STANDARDIZATION IN THE LINE CARTON PACKAGING CATEGORY – SPICES DHARAMPAL SATYAPAL GROUP DS.
Welcome to Parth Engineers & Consultant Website: ID: Mo No.:
Stober Drives Time Study By: GROUP 4. Introduction Stober Drives is a manufacturing company located in Maysville Kentucky. Stober specializes in making.
POSITION SENSOR. PHOTO ELECTRIC SENSOR THROUGH BEAM METHOD. RETRO-REFLECTIVE METHOD.
The Compelling Solution . .
Chapter 18 The Clutch System.
PRODUCTION MANAGEMENT
Equipment Efficiency: Quality and Poka-Yoke (Mistake-Proof, 防錯法)
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Lecture (9): Monitoring & sampling methods, maintenance ,
PRESENTATION ON Production Planning and Inventory Control
Lesson 2.1 Avenues for Contamination
Pricing your Products to be Profitable
IGCSE ICT Robots.
NSF International Drinking Water Product Standards
Attacking waste in manufacturing
Manual Downtime Entry.
SAG InfoTech Private Limited
Device Photographs.
Project Chiron SMU TEAM ALCON
Unit Time 8/24/04 Paul A. Jensen
Lesson 2.1 Avenues for Contamination
Project Chiron SMU TEAM ALCON
Manufacturing Production Planning
SUPPLY CHAIN MANAGEMENT SOLUTIONS
The Process of Production
Presentation transcript:

Plants in Kay-Cee Distillery § Fermentation Plant § Distillation Plant § Bottling Plant

Problems Reported Full capacity of the line was not realized Breakage of bottles Existing Lack of good plant layout Inefficient machines utilization Breakage of bottles in the line

The line consists of the following Machines: Bottle washer Filling machine Sealing machine Inspection zone Labeling machine Packing conveyor

Breakage of Bottles `` and free falling on the conveyor In Filling machine - Due to improper height In sealing machine - Due to improper height In Labeling machine- Due to entry fault into screw conveyor

Solution for Bottle Washer Breakage Purchase of bottles from a vendor who supplies standard bottles of size and shape By placing a thin cushion lining at the bottle free fall position in the Bottle washer

Solution to breakage in Filling and Sealing machine By checking the height of the bottles entering the system Over sized bottles, sensed by an optical method, are ejected pneumatically from the conveyor

Solution to Breakage in Labeling machine Checking for continuous flow of bottles optically sensing the gap between bottles and stopping the flow into the labeling conveyor

Automatic Inspection Need Takes more time when done manually More errors due to fatigue of operator eye strain repeated or cyclic work Procedure using photo sensor to identify the defects eliminating the bad product by pneumatic ejector

Automatic Case Packing Machine Need for faster packing synchronization of the process Process Pneumatic grippers are used to pick up bottles casing jigs are used for placing the bottles in the carton

Re-layout Need The existing layout of the plant is inefficient It needs a lot of manual operation consumes more time looks awkward

Improvised LayoutLayout Taking the bottles to machines using a conveyor taking shortest rectilinear way to the machines joining all the machines in a continuous flow line

Bottle Washer Specification Bottle size/shapeflat Capacity BPM Overall Dimensionlength 14 feet width 6 feet height 7 feet Washing cycles3cycles raw water 3cycles soft water back