McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Product Design & Process Selection-Manufacturing
Advertisements

1 © The McGraw-Hill Companies, Inc., 2004 Chapter 5 Product Design & Process Selection- Manufacturing.
Operations Management For Competitive Advantage 1 Product Design & Process Selection - Manufacturing Operations Management For Competitive Advantage Chapter.
Chapter 4 Product and Service Design 1Saba Bahouth – UCO.
McGraw-Hill/Irwin Copyright 2006 by The McGraw-Hill Companies, Inc.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Project Analysis and Evaluation Chapter Eleven.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Credit and Inventory Management Chapter Twenty-One.
Operations Management Design of Goods and Services Chapter 5
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Working with Financial Statements Chapter Three.
4. Economic Effficiency Efficiency Equity Market system Social cost – External cost Public goods – Private cost.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Financial Leverage and Capital Structure Policy Chapter Seventeen.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 1 Introduction to Corporate Finance.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Raising Capital Chapter Sixteen.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Introduction to Valuation: The Time Value of Money Chapter Five.
Defining the Competitive Set
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Short-Term Finance and Planning Chapter Nineteen.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Discounted Cash Flow Valuation Chapter Six.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Determining the Target Cash Balance Chapter Twenty A.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Long-Term Financial Planning and Growth Chapter Four.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Interest Rates and Bond Valuation Chapter Seven.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Risk Management: An Introduction to Financial Engineering Chapter Twenty- Three.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 Process Costing and Hybrid Product- Costing Systems.
Product Design and Process Selection
3–13–1. 3–23–2 Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Product Design.
7 - 1 Copyright © 2009 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Return, Risk, and the Security Market Line Chapter Thirteen.
New Product Development (NPD) New product to grow market share or within overall strategic process of product life cycle Operations Management 8 Stages.
Chapter 3, Product Design INTRODUCTION to Operations Management 5e, Schroeder Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Designing Products and Processes with a Future. What does it take? Involve the customer Meet with the customer Listen to customer Educate the customer.
Concurrent Engineering & Advance Manufacturing Planning.
Chapter 4 Product and Service Design.
Chapter 2, Operations Strategy
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
SESSION-9,10,11,12 Process analysis, Product Analysis and Development ECE AND EEE.
Product and Service Design
Chapter 6 Product Design and Process Selection--Manufacturing
Methods, Standards, and Work Design
Chapter 3, Part 1 Product Design
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Products and Services Operations Management - 5 th Edition Chapter.
SYSTEMS DESIGN PART THREE Chapter Four Product and Service Design
Bus 2411 Production Operations Management Product and Service Design U. Akinc Product and Service Design U. Akinc.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Product Design Chapter 3.
4-1Product and Service Design CHAPTER 4 Product and Service Design McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 7 Process Management.
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Chapter 20 Strategy in Purchasing and Supply Management.
McGraw-Hill/Irwin © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 3 Product and Service Design.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Process Cost Accounting Chapter 20.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 18-1 PROCESS COSTING Chapter 18.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Product Design & Process Selection
© 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 13 Preparing for the New Venture Launch: Early Management Decisions.
Product/Process Innovation CHAPTER FOUR McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Product Design & Process Selection-Manufacturing
Balanced Scorecard: Measures that Drive Performance  No single measure can focus attention on the critical areas of a business Managers need a balanced.
1 Slides used in class may be different from slides in student pack Chapter 4 Product Design/Development  Product Definition  Typical Phases of Product.
Tata McGraw CHAPTER 4 Product and Service Design.
Chapter Five Planning: The Foundation of Successful Management McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Slides used in class may be different from slides in student pack Core services: basic things that customers want from products they purchase. The 4.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Example 1-Ad A.
BAB 12 : ECONOMICS OF PRODUCT DEVELOPMENT PROJECT.
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 4 Product Design.
Manufacturing Management Prayash Neupane. Manufacturing Management MM refers to all aspects of the product manufacturing process. From assembly design.
Chapter 3: Design of Products and Services
Product and Service Design
Chapter 4 Product Design. Chapter 4 Product Design.
Presentation transcript:

McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.

Chapter 4 Product and Service Design

Product Development Process Economic Analysis of Development Projects Designing for the Customer Design for Manufacturability Measuring Product Development Performance OBJECTIVES 4-3

Typical Phases of Product Development Planning Concept Development System-Level design Design Detail Testing and Refinement Production Ramp-up 4-4

Economic Analysis of Project Development Costs Using measurable factors to help determine: –Operational design and development decisions –Go/no-go milestones Building a Base-Case Financial Model –A financial model consisting of major cash flows –Sensitivity Analysis for “what if” questions 4-5

Designing for the Customer Quality Function Deployment Value Analysis/ Value Engineering Ideal Customer Product House of Quality 4-6

Designing for the Customer: Quality Function Deployment Interfunctional teams from marketing, design engineering, and manufacturing Voice of the customer House of Quality 4-7

Designing for the Customer: The House of Quality © © The McGraw-Hill Companies, Inc., 2004 Customer requirements information forms the basis for this matrix, used to translate them into operating or engineering goals. 4-8

Designing for the Customer: Value Analysis/Value Engineering Achieve equivalent or better performance at a lower cost while maintaining all functional requirements defined by the customer –Does the item have any design features that are not necessary? –Can two or more parts be combined into one? –How can we cut down the weight? –Are there nonstandard parts that can be eliminated? 4-9

Design for Manufacturability Traditional Approach –“We design it, you build it” or “Over the wall” Concurrent Engineering –“Let’s work together simultaneously” 4-10

Design for Manufacturing and Assembly Greatest improvements related to DFMA arise from simplification of the product by reducing the number of separate parts: 1.During the operation of the product, does the part move relative to all other parts already assembled? 2.Must the part be of a different material or be isolated from other parts already assembled? 3.Must the part be separate from all other parts to allow the disassembly of the product for adjustment or maintenance? 4-11

Measuring Product Development Performance Measures Freq. Of new products introduced Time to market introduction Number stated and number completed Actual versus plan Percentage of sales from new products Freq. Of new products introduced Time to market introduction Number stated and number completed Actual versus plan Percentage of sales from new products Time-to-market Productivity Quality Engineering hours per project Cost of materials and tooling per project Actual versus plan Engineering hours per project Cost of materials and tooling per project Actual versus plan Conformance-reliability in use Design-performance and customer satisfaction Yield-factory and field Conformance-reliability in use Design-performance and customer satisfaction Yield-factory and field Performance Dimension 4-12

Question Bowl Which of the following is the first phase of the typical phases of product development? a.Product/process engineering b.Product planning c.Concept development d.Planning e.Ramp-up Answer: d. Planning 4-13

Question Bowl Which of the following is primarily focused on getting the voice of the customer into design specifications in product development? a.Concurrent engineering b.Value engineering c.DFMA d.Quality function deployment e.None of the above Answer: d. Quality function deployment 4-14

Question Bowl Which of the following is the first step in building a House of Quality in product development? a.Develop a list of customer requirements for the product b.Concept development c.Pilot production/Ramp-up d.Concurrent engineering e.None of the above Answer: a. Develop a list of customer requirements for the product 4-15

Question Bowl Of the following abbreviated concepts which derive the greatest product improvements as a result of simplification of the product by reducing the number of separate parts? a.CE b.DFMA c.QFD d.VA/VE e.CAD Answer: b. DFMA (Design for Manufacturing and Assembly) 4-16

End of Chapter