Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Risk Management in Regulatory Systems An Introductory Webinar.
1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
Annual Product Review (APR) Product Quality Review (PQR)
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Satellite Notification and Acceptance Program (SNAP)
Implementation of Electronic Signature Law Kęstutis Andrijauskas Information Society Development Committee under the Government of the Republic.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
MODEL IMPLEMENTING IDERA REGULATION SUMMARY POWERPOINT FIRST EDITION NOVEMBER 2014.
PART FOUR – COMMERCIAL LEGISLATION in the UAE Legislative Structures affecting business in the UAE: An Overview Ch 16.
Quality control of raw materials In-process control
Regulating the engineering profession 1 EC UK Experience in Accreditation of Engineering Programmes Professor Ian Freeston University of Sheffield, UK.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
World Health Organization
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Introduction to ISO New and modified requirements.
Vehicle Recalls in Australia Robert Hogan General Manager, Vehicle Safety Standards Branch Administrator of Vehicle Standards Working Party 29 Enforcement.
Inspection Issues in the Analytical Laboratory: An FDA Perspective Yvonne McKnight Chemist US Food and Drug AdministrationPhone: x
WHO COURSE FOR THE CARs MONITORING AND AUDITING OF FOOD LAW COMPLIANCE AND ENFORCEMENT.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
PRODUCT TRANSFER.
Quality Assurance Systems in Higher Education in Uzbekistan TerSU / TSAU Z.Djumaev, S.Islomov S.Adilov.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Management and the state registration of the enterprise.
A E B T R I © AEBTRI 2006 Page 1 Regional TIR Seminar Controlled Access To The TIR procedure Sofia, Bulgaria, May 2006 Vessela Kojouharova, AEBTRI.
Important informations
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
copyright  bsn2006 Badan Standardisasi Nasional MARKET SURVEILLANCE ON MANDATORY INDONESIAN NATIONAL STANDARD (SNI) APPLICATION 4 th MARS-Group Meeting,
What Documentation Needs to be Submitted With an Approval Application?
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
“The Quality Infrastructure in Lebanon” Export Norms, Quality Control and Competitiveness FUTURE PROGRAMME Prepared By Ali Berro Director of Quality Programme.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Deregulation to the Economy and removal of Administrative Barriers, Russian Federation EuropAid/114008/C/SV/RU Setting up of national accreditation system.
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Quality Control significance in pharmaceutical industry
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
United States Department of Agriculture Food Safety and Inspection Service Draft Labeling Policy Guidance for N- 60 Testing Claims for Boneless Beef Manufacturing.
Workshop on conformity assessment procedures and certification of medical devices INT MARKT Kyiv, November 2011 Conformity assessment of medical.
Responsibilities of Sponsor, Investigator and Monitor
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
WHO CERTIFICATION SCHEME AND NABL GUIDE LINES
Responsibilities of Sponsor, Investigator and Monitor
ISO/IEC
66 items – 70% of circulated products
National Certificate (Vocational)
Content of Tender Dossier - Instructions to Tenderers - Tenders
Reform of State Surveillance Service in Russia
Evaluation Grids Evaluation Grids.
Information on activity of the Kyrgyz Center of Accreditation under the Ministry of Economy of Kyrgyz Republic Chapaev Zhanybek  
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Testing and Certification according to ISO and ISO 17065
PRESENTED BY ING. EBENEZER K. HAIZEL
Quality Management Systems – Requirements
Certification system for prepackages
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification Application review, expert examination of supporting documents; the decision on the application is sent to the applicant Railway transport equipment testing at an accredited test centre Analysis of production conditions or certification of the quality system or manufacturing system (if stipulated by the certification protocol) Consideration of admissibility of the Certificates of Conformity held by the applicant Expert review of test results and other evidentiary material; decision on issuing a certificate of conformity (or denying such a certificate) Executing, registering and issuing a certificate of conformity and licence for using a mark of conformity (or denial of a certificate) Presenting information on the results of certification Supervisory control Consideration of appeals

1. Submitting an application for RTE certification to the Registry of Certification for Federal Railway Transport (RC FRT) Submitting an application for RTE certification with an RC FRT authority For a newly developed RTEFor mass produced RTEs List of documents 1.Application for certification 2.Engineering order for building an RTE prototype; 3.Specifications; 4.Factory testing programme; 5.Factory testing protocol; 6.Package of design and technological documents considered (the volume must be approved by the RC FRT); 7.Package of operating documents considered; 8.Acceptance certificate for acceptance testing; 9.Time plan for acceptance testing; 10.Acceptance testing programme; 11.Acceptance testing protocol (report) 12.Certificate of acceptance committee; 13.Action plan for eliminating the defects discovered by the acceptance committee (and documents confirming its implementation, if available); 14.Notice of completion of tests and proper approval of the reference set of design documents for mass production of the RTE prototype; 15.Pilot batch testing certificate; 16.List of critical elements and assemblies (CEA); parts (CP) and technological processes (CTP); 17.Certificates for CEA, CP and CTP; 18.Correspondence table; 19.Document of approval of the manner and place for applying the mark of conformity by the RC FRT and the Federal Railway Agency of the Russian Federation. List of documents 1.Application for certification 2.Specifications; 3.Package of design and technological documents considered (the volume must be approved by the RC FRT); 4.Package of operating documents considered; 5.Acceptance (qualification) testing protocol (report) 6.Certificate of the acceptance committee; 7.Action plan for eliminating the defects discovered by the acceptance committee (and documents confirming its implementation, if available); 8.Results of scheduled and routine testing; 9.Correspondence table; 10.Completed Manufacturing Conditions Assessment Questionnaire 11.List of critical elements and assemblies (CEA); parts (CP) and technological processes (CTP); 12.Certificates for CEA, CP and CTP; 13.Manufacturing rate and cost per production unit; list of organisations to which the products are supplied; 14.Statistical data on the results of acceptance testing by the RTEs over the last year (No. of RTEs produced, No. or RTEs rejected, major defects and measures for eliminating them); 15.Data on reclamations; 16.Document of approval of the manner and place for applying the mark of conformity by the RC FRT and the Federal Railway Agency of the Russian Federation.

2. Application review, expert examination of supporting documents; sending the decision on the application to the applicant Application review at RC FRT The application meets the specified requirements The application does not meet the specified requirements For a newly developed RTE For mass produced RTEs List of documents 1.Certification status (mandatory or voluntary); 2.Certification protocol; 3.Term of certification; 4.Sampling procedure and sampling volume for certification testing; 5.Procedure for analysing production conditions; 6.Conditions of supervisory control; 7.List of additional regulatory and technical documents to be presented for certification works; 8.List of testing centres (laboratories), where certification tests can be carried out 1.Sending a request to the applicant indicating a lack of required documents and data. 2.A request for available data on failures, reclamations and other defects discovered during the operation of the RTEs to be certified to the involved departments and directorates of the Federal Railway Transport Agency of the Russian Federation or railway services Sending a request to the applicant indicating a lack of required documents and data.

3. RTE testing Sampling Labelling of collected samples Sending samples for testing Identification of RTE samples Testing of RTE samples Sending original test reports to the RC FRT RC FRT Making a testing contract Employing a testing centre (laboratory) or other competent organisation for RTE testing Test report is signed by authorised specialists of the testing centre (laboratory) Test centre (laboratory) accredited for technical competence Applicant organisation (testing is carried out using certified equipment and validated measuring instruments) Test report is signed by authorised specialists of the testing centre (laboratory) and representatives of the RC FRT who control testing Test centre (laboratory) accredited for technical competence and independence Test report is signed by specialists of the testing centre who performed the testing, the applicant’s representatives and a representative of the RC FRT In the absence of a testing centre accredited for technical competence and independence For mass produced large- sized RTEs

RC FRT Management of the enterprise under investigation Analysis of production conditions, review and analysis of design and operation documentation regarding the RTE to be certified Audit group (specialists of the RC FRT plus, if necessary, experts and specialists of other relevant authorities) Production conditions analysis results Production conditions analysis certificate 1.Testing the RTE to be certified within the scope of acceptance or routine testing 2.Audit group has the right to check any control operations stipulated by regulatory and technical documents pertaining to the production site under investigation. 3.The audit group has the right to request acceptance testing certificates for the RTEs under certification and remarks of the applicant’s technical control service for review and analysis 4. Analysis of production conditions or certification of the quality system or manufacturing system (if stipulated by the certification protocol)

5. Consideration of admissibility of the Certificates of Conformity held by the applicant RC FRT carries out the following: Identification of objects under certification Verifying the power of the agency issuing the certificate of conformity Verifying the conformity of regulatory requirements specified in the certificate with the regulatory requirements accepted at the Federal Railway Transport Certification System (FRT CS) Verifying the power of the agency carrying out certification testing Verifying the conformity of test methods with the methods used at the FRT CS Analysing the sampling certificate and certification testing reports Determining the scope of additional tests required and the need for analysis of the production conditions Acknowledging a foreign certificate of conformity or a certificate of conformity issued by another Russian certification system Foreign certificate of conformity or a certificate of conformity issued by another Russian certification system Issuing a certificate of conformity in the format established by the FRT CS Certificate of conformity in the format established by the FRT CS is not issued

6. Expert review of test results and other evidentiary material; decision on issuing a certificate of conformity (or denying such a certificate) RC FRT develops a correspondence table A comprehensive report is developed at RC FRT Decision about issuing the certificate Results of all the tests performed, conformity assessments, and works for admitting the certificates of conformity held by the applicant Grounds for denying the certificate Results of analysing production conditions, quality assurance or production system certification (if such certification was performed)

7. Executing, registering and issuing a certificate of conformity and licence for using a mark of conformity Confirmation of RTE conformity with the regulatory requirements (based on certification results) PositiveNegative Establishing the certificate validity period Sending the applicant a justified certificate denial Issuing a certificate of conformity, a licence for using the mark of conformity and labelling the RTE with a mark of conformity and a market access certification mark 1.The certificate validity period is established by the RC FRT taking into account the validity periods of the regulatory documents, the RTE’s specifics and the validity period of the quality system or production certificate (if it is included in the certification system), as well as the RTE service life. 2.The validity period of a certificate for an RTE batch or an individual RTE is not established. A certificate of conformity should normally include the following: 1.Registration number and name of the certification authority issuing the certificate of conformity; 2.Registration number in the Registry of Certification System and the accession number of the certificate of conformity form 3.Name and designation of the certified RTE, including the designation of the document according to which the RTE is manufactured and supplied (schemes, specifications); 4.Codes according to classifiers of technical and economic information; 5.Designations and clause numbers of regulatory documents conformity with which has been certified; 6.Name and address of the certificate of conformity holder; 7.Area of application of the conformity certificate (mandatory, voluntary); 8.Grounds for issuing the certificate of conformity (number of the accreditation certificate of the test centre (laboratory), number and date of the test report; details of certificates of conformity issued within other certification systems, production condition anallysis data, certification of the quality system or production system, etc.); 9.List of parts and components comprising the RTE and subject to mandatory certification (they may be provided in an appendix); 10.Place and means of labelling with a conformity mark and market access certification mark; 11.Type and periodicity of supervisory control

8. Presenting information on the results of certification Information on certification results may include: Lists of certified RTEs with numbers of conformity certificates, their validity periods, as well as the place and means of labelling with a conformity mark Lists of enterprises that manufacture certified RTEs Information about suspension and revocation of conformity certificates Information about claims and reclamations with respect to certified RTEs, results of considering the appeals submitted Lists of enterprises having a certified production system or quality system Lists of test centres (laboratories) that carried out certification testing

Certificate holder RC FRT 9. Supervisory control Taking corrective measures The certificate retains validity RC FRT The certificate is suspended until the factors causing the discovered defects are eliminated The certificate is revoked and subsequent certification begins after the factors causing the deviations are eliminated Analysing information about the quality of certified RTEs obtained from the certificate holder, railways and other stakeholders Checking that no changes influencing the RTE safety profile have been made to the RTE design and production technology used during certification Random testing (where necessary) of RTEs in operation Enterprise audit including production (quality system) analysis, product testing Analysing the results of scheduled or routine tests in accordance with the requirements of regulatory documents pertaining to the certified RTE Analysing the results, executing reporting documents and making decisions based on supervisory control results Determining the quantity and location of RTEs sent to consumers and deviating from specified requirements Notifying consumers and other stakeholders about suspension of RTE use and informing them about the procedure for eliminating the defects discovered Eliminating the defects on the spot or providing for return of the RTE the manufacturer for modification Suspension of the conformity certificate and licence (agreement) for using the mark of conformity Notifying certification stakeholders Establishing the period for taking corrective actions and controlling their performance by the certificate holder

10. Consideration of appeals Consideration of appeals Initial consideration of appeals at the RC FRT Application to the relevant judicial authorities in accordance with the legislation of the Russian Federation Hearing the appeals at the Appellate Council of the FRT CS or FRT CS Headquarters