Replacement of the Queens Approach Bronx-Whitestone Bridge

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
Metropolitan Transportation Authority November 2008 Financial Plan /15/ :22 AM 1 Metropolitan Transportation Authority November 20,
Capital Program Oversight Committee (CPOC) May 23, 2011 Alok Saha, P.E., Program Manager, CPM Infrastructure and Facilities – Line Equipment, Shops & Yard.
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
1 Child Care Resource and Referral (CCR&R): FY 13 Contract Renewal Proposal Summary Presentation January 2012.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
IIT Madras, SERC Madras, Anna Univ., INSDAG
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Green Building Ordinance Transportation and Environment Committee
LESNER BRIDGE REPLACEMENT PROJECT
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
STRATEGIC PETROLEUM RESERVE BAYOU CHOCTAW CAVERN 20 REPLACEMENT 1.
TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Capital Improvements Management Services Department
Presentors: Tom Hardinger – Wisconsin DOT Eugene Hietpas – Collins Engineers Inc. This presentation and its contents may not be duplicated or reproduced.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Unitarian Church of Calgary Facilities Transformation Task Force Town Hall Update April 10,2011.
Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT
Pasadena Water and Power Contract with R C Foster Corporation to Provide Seismic Upgrades to Sheldon Reservoirs 1 and 2 City Council March 12, 2012.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
Fill in Agency Name on Master
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
6TH ANNUAL CONFERENCE.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
 Project Delivery  Design Considerations  Lessons Learned.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
9 Closing the Project Teaching Strategies
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Greenman-Pedersen, Inc. Coatings Group Review of Maintenance Prioritization Schemes from Three Transportation Authorities Christopher L. Farschon, P.E.,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Construction Manager at Risk Project Overview and Performance Jenica Keller, PE Assistant Chief of Project Management NDOT.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
OIRM Business Process Planning Overview for Business & Operations Advisory Committee May 27 – 28, 2015.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Maintenance and Temporary Traffic Control
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Open Road Tolling Procurement Update
Discover Engineering ENGR 096
Are We Abandoning Bridges with Remaining Life?
Adoption of the FY Capital Improvement Program Budget
Construction Considerations
JLEIC Accelerator R&D Meeting
Presentation transcript:

Replacement of the Queens Approach Bronx-Whitestone Bridge Risk Assessment Bridges & Tunnels

Bronx Whitestone Bridge Sequence of Major Work Past-Present-Future 2008 – 2012 Replacement of the Bronx Approach (BW89) 2011 – 2014 Replacement of the Queens Approach (BW89C) BEYOND 2015 Suspender Rope Replacement, Main Cable Rehab. and Toll Plaza QUEENS BRONX Connects Hutchinson River Parkway, Cross Bronx Expressway and New England Thruway to Cross Island Parkway, Van Wyck Expressway, LIE, and Grand Central. 2003-2009 Suspension Span Work Removal of Stiffening Truss Installation of Wind Fairing Replacement of Roadway Deck Painting of Towers 2

Queens Approach Project Area Cross Island Parkway Transition Zone Project Limits Queens Anchorage Whitestone Expressway 3

Conditions: Existing Queens Approach 11’ 10’ 9’ Constructed in 1939 Extensive recurring needs for roadway repairs and temporary steel repairs Narrow lanes No shoulders Not designed for current traffic loads Does not meet current Seismic Standards 4 4 4

Future Newly Constructed Queens Approach 12’ 12’ REPLACEMENT OF THE ENTIRE 1,010 FT QUEENS APPROACH VIADUCT Phase I - Construct New Foundations & Piers All work done under Roadway – no traffic impacts 2011 thru Mid 2012 Phase II – Staged Replacement of Roadway while maintaining traffic Early 2012 – Late 2013 Phase III - Demolish existing piers/perform ground level site work All work under Roadway – no traffic impact 2014 NEW PIER/ROADWAY 12’ wide lanes with shoulders 5 5 5

Mitigation Built into Project Lessons Learned from ongoing Bronx Approach Replacement $10M of preparatory construction already addressed Extensive pre-construction outreach with community, elected officials, and other City and State agencies Utilize Traffic Enforcement Agents Traffic mitigation measure – Temporary closure of 3rd Avenue Exit Regional coordination of Capital Program 6

Construction Cost Summary Construction Task Budget: $240,000,000 Engineer’s Estimate: $179,000,000 Low Bid $109,000,000 Low Bid vs. Budget $131,000,000 7

Risk Assessment Results (Post bid) Construction Cost Low Bid/ Schedule $109 M/ 42 mo Risk Assessed ($21M/ 5mo) $130 M/ 47 mo Project Cost Construction, CSS, Inspection, etc. $135 M/ 42 mo Risk Assessed ($27M/ 5 mo) $162 M/ 47 mo

Probability Distribution for Remaining Total Project Escalated Cost $162.2 Total Project Cost

Major Cost Risks and Mitigations Mitigation Plan Additional costs to address mitigation of Community Sensitivities such as noise, and construction related environmental issues. Continue outreach with the community and elected officials, anticipate and address mitigations, such as noise wall installations, and employ extensive site debris management. Additional costs resulting from construction delays, such as security and traffic challenges. Expedite evaluation and processing of warranted change orders related to delays eliminating any impact to construction progress/schedule. Continue to review and revise MPT staging to expedite construction. 10

Major Schedule Risks and Mitigations Mitigation Plan Additional (or different) Maintenance of Traffic needed to accommodate traffic delays Closely monitor traffic conditions and be pro-active with correction/ adjustments of MPT/ staging. Coordinate with NYCDOT and NYSDOT. Girder placement problems (Site logistics) Review and ensure Contractor’s means and methods are efficient to eliminate potential delays related to Girder placement. Use lessons learned from Bronx Approach construction. Unanticipated structural maintenance repairs Anticipate and aggressively evaluate and inspect existing structure during construction to limit/eliminate resulting delays. 11

NEXT STEPS PRIOR TO CONSTRUCTION CONTRACT AWARD Evaluate Bid Results Conduct Contractor Qualification Hearing Complete Bid Analysis and determine recommendations with respect to low bidder

Bridges & Tunnels