1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.

Slides:



Advertisements
Similar presentations
Capital Budgeting Capital Budgeting: How managers plan significant outlays on projects that have long-term implications (such as the purchase of new equipment.
Advertisements

Agenda Cost Management Capital Budgeting Payback Period
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
11-1 Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost reduction.
Slide to accompany Blank and Tarquin Basics of Engineering Economy, 2008 © 2008 by McGraw-Hill All Rights Reserved Basics of Engineering Economy.
Statement of Cash Flows- First Approach
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
Part Two Fundamentals of Financial Markets. Chapter 3 What Do Interest Rates Mean and What is Their Role in Valuation?
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Chapter 11 - Income Taxes Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Warm-Up Review Time Value of Money Calculation of Future Value
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Financial Projections (1) – Assumptions and Cash Flow MHR 308 Summer 2002.
Managerial Accounting Structure of Financial Statements.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
CHAPTER 6 ACCOUNTING FOR AND PRESENTATION OF PROPERTY, PLANT, AND EQUIPMENT, AND OTHER NONCURRENT ASSETS McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc.,
BUDGETING Financing for Students The Basics of Financing for Students.
Chapter 2 Engineering Costs and Cost Estimating
1 Engineering Economics Engineering Costs and Cost Estimating William Loendorf, P.E.
Time Value of Money – Part II
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
Understanding Interest Rates
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Long-Term (Capital Investment) Decisions
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1 Accounting 100 Chapter 2 Analyzing Business Transactions.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
BSAD 221 Introductory Financial Accounting Donna Gunn, CA.
Engineering Economic Analysis Canadian Edition
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Engineering Costs and Cost Estimating. Manufacturing Cost Structure Direct Materials Direct Labor Direct Labor: Cost of all “hands-on” effort required.
Copyright 2003 Prentice Hall Publishing Company1 Chapter 10 Preparing a Statement of Cash Flows.
Real Estate Principles and Practices Chapter 16 Investment and Tax Aspects of Ownership © 2014 OnCourse Learning.
5.01 Budget Planning & Control. Budget Planning Financial planning is one tool managers use to improve profitability. Planning the financial operations.
© 2001 Prentice Hall Business Publishing Financial Accounting, 4/e Harrison and Horngren 12A-1 CHAPTER 12 Part A Preparing and Using the Statement of Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Chapter 8 Capital Asset Selection and Capital Budgeting.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Financial Planning Skills By: Associate Professor Dr. GholamReza Zandi
Real Estate Principles and Practices Chapter 16 Investment and Tax Aspects of Ownership © 2010 by South-Western, Cengage Learning.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating.
Engineering Economic Analysis Canadian Edition
CHAPTER © jsnyderdesign / iStockphoto 9 CAPITAL BUDGETING.
UNIT No. 3 Capital Budgeting Nature Significance Technique of Capital Budgeting Pay back Method Accounting Rate of Return Net Present Value Profitability.
CAPITAL BUDGETING DECISIONS CHAPTER Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 2.
Chapter # 5 Financial Plan. Financial Plan for start up business A financial plan is a series of steps or goals used by an individual or business, the.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Financial Statements Filippo Egizii UNIDO ITPO Bahrain
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
1 Concepts of Incomes, Expenses and Retained Earnings Lesson 1 – Concepts and Characteristics of Incomes.
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Planning ahead for long-term, expensive projects
DEVELOPING A BUSINESS PLAN FOR A MANUFACTURING COMPANY: BUDGETING
Engineering Economics Engineering Costs and Cost Estimating
and short term financial planning
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Time Value of Money & Cash Flow Estimation Prepared By Toran Lal Verma
Chapter 3: Cost Estimation Techniques
Presentation transcript:

1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation

2Introduction Engineering economic analysis focuses on the future consequences of current decisions. Estimating is the foundation of economic analysis. Estimating cost begins at the activity level. Once costs at the activity level have been determined, they are aggregated to the project level. Generally, we categorize costs as labor costs or material costs.

3 Introduction Material costs will be priced on a per-use or per-time-unit basis. Labor costs are people resources. In order to estimate people costs for an activity, – you need to know the rate of pay for a time unit of labor. – The time unit can be hourly or daily. – Because you know the resource requirement by skill or job classification for an activity, you can easily calculate the total labor cost for an activity. – The variable here is the activity duration over which the labor costs are accrued; needed for cost/schedule control purposes.

4 Types of Estimates Each type of estimate has its unique purpose, place, and function in a project ’ s life. Types are: Each type of estimate has its unique purpose, place, and function in a project ’ s life. Types are: 1- Rough Estimates:  Used for high-level planning, for determining macro-feasibility, and in a project ’ s initial planning and evaluation phases.  They tend to involve back-of-the-envelope numbers with little details or accuracy.  Their accuracy is generally -30% to +60%.

5 Types of Estimates 2- Semi-detailed Estimates: Used for budgeting purposes at a project ’ s conceptual or preliminary design stages. Used for budgeting purposes at a project ’ s conceptual or preliminary design stages. These estimates are more detailed than rough estimates and require additional time and resources to develop These estimates are more detailed than rough estimates and require additional time and resources to develop The accuracy of these estimates is generally -15% to +20%. The accuracy of these estimates is generally -15% to +20%.

6 Types of Estimates Types of Estimates 3. Detailed Estimates: Used during a project ’ s detailed design and contract bidding phases. Used during a project ’ s detailed design and contract bidding phases. Involve the most time and resources to develop Involve the most time and resources to develop More accurate than rough or semi- detailed estimates More accurate than rough or semi- detailed estimates The accuracy of these estimates is generally -3% to +5%. The accuracy of these estimates is generally -3% to +5%.

7 Difficulties in Estimation It is difficult to anticipate future economic consequences exactly (Uncertainty) It is difficult to anticipate future economic consequences exactly (Uncertainty) Aspects of estimating that make it difficult task are: Aspects of estimating that make it difficult task are: 1) First run projects (One-of-a-Kind Estimates) 2) Time and Effort Available 3) Estimator Expertise

8 Important Estimating Models 1. Pre-Unit Model - Uses a “ per unit ” factor, such as cost per square foot, to develop the estimate desired. - Very simplistic and useful technique - Does not make allowances for economies of scale - It can be very accurate if accurate data are used Examples: Examples:  Salary: $/month  Transportation: $/mile  Tiles/Plastering $/m2  Concrete $/m3  Steel $/ton

9 Important Estimating Models 2. Segmenting Model - divide and conquer ” - Based on “ divide and conquer ” - An estimate is segmented into items/categories - The items/categories are sub-estimated using the unit factor model

10 Other Estimating Models 1. Cost indexes - - Cost indexes reflect relative price change in cost items or units. - - Cost at Time A/Cost at Time B = Index value at time A/Index value at time B 2. Power-Sizing Model - - Is used to calculate the costs of power plants and equipment - - It scales up or down known costs - - Cost of equipment A/Cost of equipment B = Size of equipment A/Size of Equipment B

11 Other Estimating Models 3. Triangulation - Involve using different sources of data and different quantitative models to arrive at the value being estimated. 4. Improvement and learning - As the number of repeated estimates increases, performance becomes more faster and more accurate due to gained experience and learned lessons

12 Estimating Benefits Engineering economists must estimate benefits of the projects )Highway and bridge toll, reduced risk of flooding, reduced risk of pollution, etc … ) Engineering economists must estimate benefits of the projects )Highway and bridge toll, reduced risk of flooding, reduced risk of pollution, etc … ) The cost concepts can be applied to economic benefits The cost concepts can be applied to economic benefits

13 Cash Flow Diagrams (CFD) Summary of the transactions (costs and benefits) of engineering projects occur over time A picture that shows all cash inflows and outflows plotted along a horizontal time line. A picture that shows all cash inflows and outflows plotted along a horizontal time line. CDF illustrates the size, sign, and timing of individual cash-flows CDF illustrates the size, sign, and timing of individual cash-flows CDF is the basis for engineering economic analysis CDF is the basis for engineering economic analysis Cash flow diagrams may also be used to represent payment schedules for bonds, mortgages, and other types of loans. Cash flow diagrams may also be used to represent payment schedules for bonds, mortgages, and other types of loans.

14 Categories of Cash flows Categories of the expenses and receipts in engineering projects: Categories of the expenses and receipts in engineering projects: - First cost= expense to build or to buy and install - Operation and maintenance (O &M) + annual expense such as electricity, labor, and repairs - Salvage value = receipt at project termination for sale or transfer of the equipment - Revenues = annual receipts due to sale products or services - Overhaul = major capital expenditure that occurs during the asset ’ s life

15 Constructing Cash Flow Diagram The time line is a horizontal line divided into equal periods such as days, months, or years. The time line is a horizontal line divided into equal periods such as days, months, or years. Each cash flow, such as a payment or receipt, is plotted along this line at the beginning or end of the period in which it occurs. Each cash flow, such as a payment or receipt, is plotted along this line at the beginning or end of the period in which it occurs. Funds that you pay out such as savings deposits or lease payments are negative cash flows that are represented by arrows which extend downward from the time line with their bases at the appropriate positions along the line. Funds that you pay out such as savings deposits or lease payments are negative cash flows that are represented by arrows which extend downward from the time line with their bases at the appropriate positions along the line. Funds that you receive such as proceeds from a mortgage or withdrawals from a saving account are positive cash flows represented by arrows extending upward from the line. Funds that you receive such as proceeds from a mortgage or withdrawals from a saving account are positive cash flows represented by arrows extending upward from the line.

16 An Example of Cash Flow Diagrams + $ 100 Year 1 Year 2 Year 3Year 4 Time 0Year 5 + $ $5 0 - $ $ 150