Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.

Slides:



Advertisements
Similar presentations
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
Advertisements

Industry Outlook Forum Kenai Peninsula – Opportunities Abound Kenai Nitrogen Operation (KNO) Restart Project.
Houston Region Import Capacity Project Planning for Reliable Power.
Year End Review January, 2015.
Aboutpipelines.com Managing Safety and the Environment PATRICK SMYTH, VP SAFETY & ENGINEERING 28 OCTOBER 2014.
Dominion Update November Dominion: In Virginia Headquartered in Virginia  More than 9,000 employees in the Commonwealth  Annual Virginia payroll.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
Energy Technologies and Environmental Protection April 3 rd, 2006, Bucharest.
1. Forward Looking Statements/Additional Information and Cautionary Note Regarding Hydrocarbon Disclosure Except for the historical information contained.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
Advancing the Commercialization of Small Modular Reactors Michael Kurth American Nuclear Society & Washington Internship for Students of Engineering.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
ECONOMIC IMPACTS OF THE NATURAL GAS INDUSTRY IN NORTH TEXAS Terry L. Clower, Ph.D. Center for Economic Development & Research University of North Texas.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Nuclear Power Isar Plant - Germany Diablo Canyon - California.
Community Socioeconomic Profile Wayne County, West Virginia March 27, 2007.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Show-Me Recycling The Missouri Recycling Association’s statewide education campaign that showcases sustainable programs that improve the economy and community.
Federal Energy and Environmental Regulation Agencies and Laws
Etowah County Alabama. Etowah County has been selected to be the first site in Alabama for a wind energy farm. Pioneer Green Energy is the developer The.
Central Florida’s Modeling, Simulation & Training Cluster A Critical High Tech Segment of a Diversified Florida Economy Thomas L. Baptiste, Lt Gen, USAF.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
A THREAT TO RURAL AMERICA Overview of EPA Proposed Rule.
1 Status of and Outlook for Nuclear Generation in the U.S. Energy Bar Association Mid-Year Meeting December 3, 2009 Scott Sitzer U.S. Energy Information.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
November 13, 2007 The Evolving Roles and Responsibilities of Gas Utilities In Today’s Markets: Giving Customers More Choices.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
Wyoming Energy Strategy Draft for discussion purposes Office of Governor Matt Mead Shawn Reese, Policy Director Draft.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
UC Berkeley Per F. Peterson Professor Department of Nuclear Engineering University of California, Berkeley California Science Center February 23, 2008.
Institute for Energy Economics and Financial Analysis Presentation to Center for American Progress and Climate Solutions March 1, 2012 Washington, D.C.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Indiana’s “NowGen” 630 MW IGCC Plant On-line the Summer 2012 Chairman David Lott Hardy.
WIEG Annual Meeting June 19, 2008 Gale Klappa Chairman and Chief Executive.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Community Choice Energy as a Community Development Strategy for Oakland March 30, 2010.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
Anni Podimata MEP Member, Committee on Industry, Research and Energy 8th Inter-Parliamentary Meeting on Renewable Energy and Energy Efficiency Budapest,
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Milestones or Millstones Alex R. Burkart, Deputy Director Office of Nuclear Energy, Safety and Security United States Department of State.
Black & Veatch “The Infrastructure Experts” Len Rodman.
North American Young Generation in Nuclear (NAYGN)
THE ECONOMIC AND FISCAL IMPACT OF THE PROPOSED TOURO UNIVERSITY VILLAGE DEVELOPMENT A Presentation to the Vallejo Chamber of Commerce June 13, 2007 Gruen.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
Findings from the Multi-Sector Working Group Future Greenhouse Gas Reduction Strategies in the Metropolitan Washington Region Presentation to the WRTC.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Committee of 100 for Economic Development IFFCBANO Conference
Planes, Trains & Automobiles Oil & Gas Conference Fort Nelson, BC 2011.
Nuclear Energy 2016: Status and Outlook
USA: Key Energy Efficiency Developments Cary Bloyd EGEEC-39 Chinese Taipei November 7-8, 2012.
The Economic Benefits of Refurbishing and Operating Ontario’s Nuclear Reactors February 25 th 2011.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
Creating a Sustainable Energy Future Alex Glenn State President Progress Energy Florida, a subsidiary of Duke Energy.
Nuclear Power Update for The Society of American Military Engineers
The Opportunity for CHP in the United States
Overview of Vogtle Nuclear Power Plant
NUCLEAR ENERGY What is it?
Presentation transcript:

Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010

1 Comanche Peak History  Unit 1 - Commercial Operation August 1990  20 years of Operation  Unit 2 - Commercial Operation August 1993  17 years of Operation  Squaw Creek Reservoir  Closed for security reasons after September 11, 2001  Reopened to public for fishing earlier this year

22 Comanche Peak Units 1 & 2 ZeroSafety Incidents 98.1%Capacity factor (availability) of existing units Zero Greenhouse gas emissions (main units) ~ 2,500Megawatts of electric generating capacity ~ $11 BillionCost of Units 1 & 2 20Years of Operation for Unit 1

3 Unit 1 & 2 Operation Overview  Top priority is to maintain nuclear and personnel safety  Excellent results  Ongoing corrective action plan  Focus on management behaviors that maximize solutions  Unique cooperation within industry to share information  Constructive culture led by Servant Leaders  Costs are low – in top 5% of industry

44 Units 1 & 2 Area Impacts 1,220 Employees and team members. $100 Million Current annual Comanche Peak payroll. Average salary and benefits of plant employees is about $80,000/year. $1 Billion Total of tax payments and other monetary donations to local communities. Over $615,000 Raised for Hood County United Way in past 4 years. $1.1 Million Ongoing average annual payments for the construction of Lake Granbury for the past 38 years. When payments are complete, we will have spent $46 million to fully underwrite the construction cost of Lake Granbury.

5 Comanche Peak Oversight  Created by nuclear industry  Helps industry achieve operational excellence  Evaluates & assists  Accredits training  U.S. Regulatory Agency  Develops rules & regulations  Inspects plants Nuclear Committee Comanche Peak Operations Review Committee  Required by Technical Specifications  Includes off-site industry experts  Quarterly intensive review of performance  Reports to CNO & provides feedback to the Board  Committee of Luminant Board  Receives periodic reports of CPNPP performance  Reports to the Board QA

66 More than 11 Million New Texans by 2040… Texas’ Projected Population Growth Assuming Net Migration Equal to Millions Source: Texas State Data Center

77 …Means Additional Electric Demand and New Generation Needs Increased Electric Demands MW Source: ERCOT

8 Overview of Proposed Expansion (Units 3 & 4)  1700 MW each unit; 3400 MW total  Uses existing Comanche Peak site and infrastructure  Comanche Peak Nuclear Power Company – Joint venture between Luminant and Mitsubishi Heavy Industries  Attractive, emissions-free growth opportunity Proposed Existing

99 Benefits of Potential Expansion Safe Operations: Strong history of safe operations Clean-Air Energy: Zero greenhouse gas emissions (existing main units) Dependable Power: High annual availability factors Advanced Technology: Improved nuclear design Ratepayer Certainty: Owners pay for construction – not ratepayers

10 Future Economic Benefits of Proposed Expansion (Perryman Group) 10  $22 billion in Texas Economic Impact: Including increased retail sales, personal income and gross state product. This would be the largest economic development project in state history.  Thousands of New Jobs: In addition to thousands of construction jobs, the new units would create about 1,000 new, on-site jobs. With the economic development multiplier, this is expected to create a total of 6,200 Texas jobs.  Increased State Revenue: State tax revenue is projected to increase by more than $490 million during development and construction – by more than $30 million annually once the plant is operational.

11 Potential Construction of Comanche Peak 3 & 4 (Especially for Engineers) > 5 millionCubic yards of earth to be moved 90,000Tons of rebar ~ 1 millionYards of concrete to be poured > 12 millionFeet of cable > 30 millionConstruction man-hours to complete > 40,000Tons of structural steel ~ 8 millionSquare feet of formwork

12 Project Milestones 2006Announced Potential Expansion Plans 2007 Selected Mitsubishi US-APWR Design APWR: Advanced Pressurized Water Reactor 2008 Submitted License Application to Nuclear Regulatory Commission 2010Draft Environmental Impact Study 2011NRC Safety Evaluation Report Development 2012Additional NRC Review 2013Possible License Issued 2013+Decision About Whether to Build 2019–2020Earliest Possible Time New Units Operational

13  Nuclear Regulatory Commission Licensing process  Federal Loan Guarantee process  Looking Forward

14 Questions