Towards an International Linear Collider Barry Barish GDE 6-June-07.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
January 17, 2008Mike Hildreth – Aspen 2008 International Linear Collider Project Status Mike Hildreth University of Notre Dame Representing the Global.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
EUROTeV and the ILC Global Context Nick Walker (DESY) EUROTeV Annual Meeting INFN Frascati 24 January 2008.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
11 June 07 Fermilab Steering Group 1 ILC Baseline Schedule, Milestones, and Decision points Tom Himel.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
GDE Status / Plans & ILC Timeline Barry Barish FALC 11-July-07.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
04-Feb-07 GDE/ACFA Intro Beijing Global Design Effort 1 GDE Status Barry Barish 4-Feb-07.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Oct 22 Group Leaders Planning meeting
Report on plan to produce an Engineering Design Report
ILC Global Design Effort
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Towards an International Linear Collider Barry Barish GDE 6-June-07

The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Engineering Design Expression of Interest to Host International Mgmt LHC Physics

6-June-07 40th Fermilab Users Meeting Global Design Effort 3 –11km SC linacs operating at 31.5 MV/m for 500 GeV –Centralized injector Circular damping rings for electrons and positrons Undulator-based positron source –Single IR with 14 mrad crossing angle –Dual tunnel configuration for safety and availability RDR ILC Schematic

6-June-07 40th Fermilab Users Meeting Global Design Effort 44 RDR Design & “Value” Costs Summary RDR “Value” Costs Total Value Cost (FY07) 4.80 B ILC Units Shared B Units Site Specific K person-years (“explicit” labor = 24.0 M 1,700 hrs/yr) 1 ILC Unit = $ 1 (2007) The reference design was “frozen” as of 1-Dec-06 for the purpose of producing the RDR, including costs. It is important to recognize this is a snapshot and the design will continue to evolve, due to results of the R&D, accelerator studies and value engineering The value costs have already been reviewed twice 3 day “internal review” in Dec ILCSC MAC review in Jan Σ Value = 6.62 B ILC Units

6-June-07 40th Fermilab Users Meeting Global Design Effort 5 Assessing the RDR Reviews (5 major international reviews + regional) –The Design: “The MAC applauds that considerable evolution of the design was achieved … the performance driven baseline configuration was successfully converted into a cost conscious design.” –The R&D Plan: “The committee endorses the approach of collecting R&D items as proposed by the collaborators, categorizing them, prioritizing them, and seeking contact with funding agencies to provide guidelines for funding. –International Cost Review (Orsay): Closeout by Lyn Evans (chair) supported the costing methodology; considered the costing conservative in that they identify opportunities for cost savings; etc. Final Steps –The final versions of Executive Summary, Reference Design Report and Companion Document will be submitted to FALC (July), ILCSC and ICFA (August).

6-June-07 40th Fermilab Users Meeting Global Design Effort 6 On track … but what about Orbach? Our technically driven timeline is –Construction proposal in 2010 –Construction start in 2012 –Construction complete in 2019 What do we need to do to achieve our timeline? “Completing the R&D and engineering design, negotiating an international structure, selecting a site, obtaining firm financial commitments, and building a machine could take us well into the mid-2020s, if not later,”

6-June-07 40th Fermilab Users Meeting Global Design Effort 7 Technically Driven Timeline BCD RDREDR Begin Const End Const Engineer Design

6-June-07 40th Fermilab Users Meeting Global Design Effort 8 ILC EDR Organization Funding Agencies (FALC) and Institutions (ILCSC) Executive Committee Tasks ‘I’Tasks ‘II’Tasks ‘III’ Region A Region BRegion C Technical Management - Engineering Design and R&D Regional Management - Funding and Authorization Project Management Office - General Engineering and Administration Institution Instit. …. Director’s Office - Director assisted by Project Managers (PMs)

6-June-07 40th Fermilab Users Meeting Global Design Effort 9 E-Document Systems at ILC Recommendations from the GDE EDMS committee have been implemented Status: ILC Agenda and ILC Doc in operation, ILC EDMS is launched at LCWS DESY, tools for common access to be added subsequently ILC Agenda (InDiCo) ILC EDMS (TEAMCENTER) ILC Doc Common Search and Access Layer agendas meeting minutes presentations ILC notes publications illustrations specifications technical reports drawings 3D CAD models Important global collaboration tool for the EDR phase (under PM office) EDMS tutorials available this workshop ilcagenda.linearcollider.org ilcdoc.linearcollider.org

6-June-07 40th Fermilab Users Meeting Global Design Effort 10 Engineering Design Phase ILC Engineering Design –We have a solid design concept in the reference design, but it is immature and needs engineering designs, value engineering, supporting R&D and industrialization. GDE will be reorganized around a Project Management Office to reach this goal –M. Ross, N. Walker and A Yamamoto – PM “Troika” + high level engineering managers in the project office –Central management will have authority to set priorities and direct the work –Resources for the engineering design and associated R&D appears feasible –Investments toward Industrialization and siting –Anticipate LHC results by about We must be ready!

6-June-07 40th Fermilab Users Meeting Global Design Effort 11 Technically Driven Timeline August BCD Construction  Startup RDREDR Begin Const End Const Engineer Design

6-June-07 40th Fermilab Users Meeting Global Design Effort 12 –Three RF/cable penetrations every rf unit –Safety crossovers every 500 m –34 kV power distribution Double Tunnel

6-June-07 40th Fermilab Users Meeting Global Design Effort 13 Conventional Facilities 72.5 km tunnels ~ meters underground 13 major shafts > 9 meter diameter 443 K cu. m. underground excavation: caverns, alcoves, halls 92 surface “buildings”, 52.7 K sq. meters = 567 K sq-ft total

6-June-07 40th Fermilab Users Meeting Global Design Effort 14 Civil Construction Timeline

6-June-07 40th Fermilab Users Meeting Global Design Effort 15 CMS assembly approach: Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduces size of required underground hall On-surface Detector Assembly CMS approach

6-June-07 40th Fermilab Users Meeting Global Design Effort 16 Technically Driven Timeline August BCD All regions require ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select

6-June-07 40th Fermilab Users Meeting Global Design Effort 17 Situation : in solid rock, close to existing institute, close to the city of Chicago and international airport, close to railway and highway networks. Geology : Glacially derived deposits overlaying Bedrock. The concerned rock layers are from top to bottom the Silurian dolomite, Maquoketa dolomitic shale, and the Galena- Platteville dolomites. Depth of main tunnels : Average ~ 135 m Americas Fermilab Sample Site

6-June-07 40th Fermilab Users Meeting Global Design Effort 18 ~ 5.5 km Central Area fits inside the Fermilab boundary Site Characterization of the Central Area can be done ~ Boundary of Fermilab Preconstruction Plan for Fermilab

6-June-07 40th Fermilab Users Meeting Global Design Effort 19 Americas Site Plan

6-June-07 40th Fermilab Users Meeting Global Design Effort 20 Preparing for 2012 Construction Start Phase 1 Phase 2 Phase 3

6-June-07 40th Fermilab Users Meeting Global Design Effort 21 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL

6-June-07 40th Fermilab Users Meeting Global Design Effort 22 The Task Forces The Task Forces were put together successively over a period of five months:  S0/S1-Cavities, Cryomodule  S2 -Cryomodule String Tests  S3 -Damping Rings  S4 -Beam Delivery System  S5-Positron Source S6-Controls, not yet active S7-RF Working in close collaboration with the Engineering and Risk Assessment team.

6-June-07 40th Fermilab Users Meeting Global Design Effort 23 Module Operational Gradients

6-June-07 40th Fermilab Users Meeting Global Design Effort 24 Rough S2 Schedule

6-June-07 40th Fermilab Users Meeting Global Design Effort 25 4 th generation prototype ILC cryomodule Cavities & Cryomodules Producing Cavities

6-June-07 40th Fermilab Users Meeting Global Design Effort 26 Schedule in Graphical Form Construction Schedule Cryomodule Production RF System Tests

6-June-07 40th Fermilab Users Meeting Global Design Effort 27 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL Detector Install Detector Construct

6-June-07 40th Fermilab Users Meeting Global Design Effort 28 Detector Concepts Road map to two detectors & EDR

6-June-07 40th Fermilab Users Meeting Global Design Effort 29 detector B may be accessible during run accessible during run Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation. Concept of IR hall with two detectors The concept is evolving and details being worked out detector A

6-June-07 40th Fermilab Users Meeting Global Design Effort 30 Technically Driven Timeline August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL Detector Install Detector Construct Pre-Operations

6-June-07 40th Fermilab Users Meeting Global Design Effort 31 Value Funding Profile We are not using integrated cost/schedule tools yet; but it appears feasible to develop a realistic funding profile % of Total Value per Year

6-June-07 40th Fermilab Users Meeting Global Design Effort 32 Achieving our ILC Timeline “The other issues” We need to begin a campaign to prepare the way for submitting a winning proposal in about –Science Motivation is very strong, but we need LHC results for validation (~2010) –Must convince broader HEP and science communities on the ILC –Must engage the global governments to take ownership and develop international governance –Must develop a siting strategy JOIN US!! The ILC is our future. It’s up to us make it happen and on our timescale.