A group of friends recently took a vacation at one of New York’s Finger Lakes and Shortly After decided to invest in a newly built and furnished home.

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
(Builder Marketing Message) (Builder Logo) Consider adding your logo to the master slide.
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
LEARN HOW TO SELL USING 203(k) LOANS With Tim Pascarella.
FHA 203K Streamline. Why FHA 203K Streamline? Through the FHA 203K Streamline program, borrowers can purchase or refinance their home and include the.
Skyscraper Construction
A New Day Is Dawning… Sunnyside Pointe Homes An A ffordable, S ustainable, E fficient Planned Community.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
7 Set of Floor Plans Primary Considerations
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
Where in the World? -Our home is in New Jersey because the State of New Jersey gives generous rebates on top of the rebates granted by the US Government.
Site Plans.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Practice House 1. Make a rectangular foundation 2. Put an interior wall in the middle. 3. Add an exterior door, interior door and at least one window on.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
LIVING TO DESIGN: The Architectural Design Project.
Presentation By: Stacey R. Cook March 25,  Silver Fiddle Construction Background  The Customers  Project Statement/Objective  Requirements of.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Chapter 2 Introduction to Construction Procedures
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Unit 1: Planning and Permitting Mr. Todzia. How does a construction project start? First need someone to initiate……could be the homeowner, a developer.
Primary Design Considerations
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
IET 120 – CONSTRUCTION DESIGN
Presented by: Gossling Construction & Seamless Gutters Keith Gossling - Owner Lauren Ragone - Administrative Assistant.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
WebQuest: Building A Home 8 th Grade Math & Art Application Corinne McKenna.
Affordable housing project
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
IET 120 CONSTRUCTION PROJECT Name: Jesse Webb-Greenhill.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Understanding the FHA 203K STREAMLINE AfterBefore.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
IET 120 Project #4 Matthew Porter Construction Project.
The art and science of designing and construction of buildings.
Construction Planning
LenderSelect Mortgage Group Education for Renovation
Sherry Brooks David W. Butler April 28, 2009
Foundations of Technology Construction
Major Steps In Building a SFR
Passive Solar Home Design Project
Wood Structures Topic 8 Quality Workmanship
Pre-Contract Cost Control
Decisions and considerations of choosing or building a new home.
2911 AW Grimes Blvd., Pflugerville TX 78660
Remodeling and Renovating
How & When to Get Permits for Work in Your Home
10 The Cost Approach—Part I: Reproduction/Replacement Cost
House Construction Budget Plan
Foundations of Technology Construction
Floor Plans and Symbols
Trillo Apparel Company Revised Delivery Plan
Presentation transcript:

A group of friends recently took a vacation at one of New York’s Finger Lakes and Shortly After decided to invest in a newly built and furnished home.

Group of peers who decided to build a 4,000 sq. ft. vacation home in Watkins Glen, New York with an estimated cost of $600,000. Hire a reputable general contractor who will oversee all labor and construction. It will be the responsibility of the GC to hire reputable sub-contractors to complete work such as electrical, plumbing, painting and décor, roofing, windows, excavating GC ensure both payment and performance bonds allows for any potential payment issues to be settled quickly and orderly Subcontractors that are selected by the GC will be approved by the project team, SC will be licensed and bonded. All necessary permits will be obtained by any and all contractors and subcontractors, with routine expectations by local inspectors.

All contracts will be discussed and agreed upon by all parties and their respected attorneys if a problem arises, arbitration will be the first course of action. Any additional costs over $10,000 will have to be approved by the team before additional work will be accepted Financing obligations- they buyers are putting 40% down- $240,000 There will be no clearing or raising costs attributable to the project because the plot of land is completely bare. A construction access road will be constructed by the GC in order to transport materials in an efficient manner All materials and equipment will be completed within 90 calendar days of the start of the construction of foundations to ensure delivery and availability. Work will be completed Monday-Friday only. Roof will have a 25 year warranty Foundations will be waterproofed with associated warranty

4,000 Square foot, 6 bedroom, 5 bath, finished home. Fully finished interior, including all appliances such as a microwave, washer and dryer. Custom slate tile roof with 25 year warranty. Backyard infinity pool with grotto and water slide. Solar Panels to harness solar energy.

ActivityDescriptionDurationCosts AFoundation16$ 70,000 BFrame15110,000 CMasonry12110,000 DRoof/Doors/Windows1350,000 EMech./Elec./Plumbing1290,000 FInterior1260,000 GFinishes1970,000 HExterior2540,000 $ 600,000

Permits approved-May 2, 2011 Foundation dug and poured-May 17, 2011 Drywall, framing sheathing, plumbing, electrical and mechanical inspections passed-August 5, 2011 Pool Completed- August 18, 2011 Final inspections-September 1, 2011

Home must meet local building codes. Windows and doors must pass energy efficiency test. Exterior walls of house properly insulated. Ceiling and floor insulation must meet energy efficiency standards. Pool must be 110sq feet with a min depth of 3ft and max of 12 ft. Garage must be able to hold three cars and up to four recreation vehicles, dirt bike,atv,etc. Minimum of four industrial grade solar panels or enough to offset monthly energy bills by one third. Structure must pass seismic stability test in case of unpredicted glacier movement.

Structure will be built to specification of customer, all changes must be approved. Costs over 10,000 of original budgeted must be approved. Contractor reserves rights to contract out services. Contractor is responsible for subcontracted work. Materials and equipment are only on had for 45 days form start of project. Anytime over this is at additional cost. Dishwater and refrigerator are not included appliances. Site work is limited Monday through Saturday, 8am to 7:30 pm.

Rain- Whether should not be a major issue to the project because of the months in which work is being done. However, if it does rain it will no have a major effect on the project because there are extra days built in as contingency. Code- Building might not be up to code. This is not likely to happen because of the projects reputable general contractor. A list of specialists will be drawn up as a precautionary measure so that problems of this nature can easily be taken care of.

Material Prices: There is a possibility that prices for lumber, copper wiring and other building materials significantly rise. Resources: Resources that are needed are listed in detail in the proposal. Failure to procure the require resources could result in a serious set back. Cost Estimation: At the beginning of the project a projected budget of $500,000 was drawn. Cost will be monitored throughout the project to make sure the team does not go over budget. If costs end up being higher, the team will have to address accordingly. Transportation: Material Transportation is an essential part of the project. It is important for suppliers to get materials to the site. The project team must make sure that the general contractor has access to an alternative mean of transportation.

Foundation: Digging Laying -65,000 Interior Building (Rooms), Painting, Plumbing, Electric :112,000 Framing: 116,000 Siding: 18,000 Exterior Landscape Including Pool and Plants: 45,000 Driveway: 9,000 Concrete Masonry: 111,000 Total Costs: 476,000

ActivityDescriptionDurationCosts AFoundation16$ 70,000 BFrame15110,000 CMasonry12110,000 DRoof/Doors/Windows1350,000 EMech./Elec./Plumbing1290,000 FInterior1260,000 GFinishes1970,000 HExterior2540,000 ITree Removal (add work)410,000 $ 610,000

The heavy rains that fell midway through the project delayed the project. We did have contingency plans set in place to combat such an instance The cost of lumber was increased by 20%. Therefore for the 75% that needed completed actual building costs increased. We also had to subcontract a tree removal service that was not part of initial budget.

Foundation$66,000 Frame 148,000 Masonry 109,000 Roof/Doors/Windows 57,000 Mech/Elec/Plumbing 88,000 Interior 64,000 Finishes 69,000 Exterior 38,000 Tree Removal 6,000