Air Group One Expansion Project Phase 1 Design and Cost Analysis.

Slides:



Advertisements
Similar presentations
1 Comments for Workshop on EEU Budget for August 6, 2008.
Advertisements

DTEB Presentation AIRPORT MASTER PLANNING VS STRATEGIC PLANNING Presented by: Dheya Tawfiqi.
ELLINGTON AIRPORT City of Houston Houston Airport System World Class Aerospace Center.
Product Support Manager Conference Incentivizing Industry Panel Vice Chair, Logistics Division National Defense Industrial Association 15 January 2015.
The Effects of Creep on the U.C. Berkeley Football Field By Dillon Bailey & Thomas Irwin.
Final Program Environmental Impact Report Gillespie Field Development Council January 17, 2012 Item #5.
Running Your Airport Like A Business Keith Freitas Director of Airports Contra Costa County Airports.
Education Through Living History The Dixie Wing Commemorative Air Force Peach State STARBASE.
5 Steps to Build a Strong Business Credit Profile Get the funding you need now! Presented by Amber Colley.
OVERVIEW The Organized Financial Sector. The Informal Sector Anawat Salaam: common in poppy growing Commodity credit Family and kinship groups: most common.
Building Loads. Introduction The design of, selection of materials for and construction of Ag structures is based on the expected loads, use(s) of the.
Phase Difference = Phase Difference = 0.05.
Welcome XXXXX Date. Affiliated Companies  1984 – Established Charter and Air Ambulance Service  Lear 30 Series Aircraft  2005 initial CAMTS Certification.
TexPREP is an academic enrichment program based on S.T.E.M. careers. The program provides an insight to higher level education in regards to Science,
Proposed Amendments for Palomar Airport Center dba Premier Jet Special Workshop/Meeting Palomar Airport Advisory Committee June 14, 2006.
2. What is an Inclined Plane? A ramp is an inclined plane. A ramp is an inclined plane. A ramp helps move objects. A ramp helps move objects. You can use.
1 The Smithsonian’s National Air and Space Museum’s STEVEN F. UDVAR-HAZY CENTER Greater Miami Aviation Association.
12 October 2006http:// Civil Air Patrol Capt. Rangi Keen Lebanon Composite Squadron.
CITY OF SANTA BARBARA Budget Overview APA Citizens Academy Paul Casey, Assistant City Administrator October 15, 2013.
Air Lease (AL) Young firm specializing in commercial airplane leasing. Air Lease CEO Steven F. Udvar-Hazy founded industry giant. International Lease Finance.
The Right Fit Company Overview Cassandra. Overview Company Description Equipment and Fitness Classes Expansion Plans The right fit.
The Right Fit Company Overview Your Name. Overview Company Description Equipment and Fitness Classes Expansion Plans.
AFILAND AVIATION REFORM PROJECT,2009 GROUP 2 David Mzeka Gafor Deus Abe Njoki James.
Board Workshop G & H January 19, G & H Pre-Detail Design.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Currently 45% complete Scheduled Completion is December.
1 ESMBA06 Finance 5405 Financial Management. 2 Team 07 Sushil Bhattachan Christina Danver Ben Gumpert Adan Montoya Gurinder Virdi.
© 2004 VeriSign, Inc. RAPID GROWTH: LESSONS LEARNED FROM.COM/.NET VeriSign Bart Mackay February 2005.
Drones By: Benny Dang - Lu. What is a Drone? A drone is a remote controlled (or radio controlled) aircraft or missile that has no one physically controlling.
Census Data of California Winston Kyu,
Management Short Course January 2012 Future Airport Terminals Trends in Terminal Design.
Registration Management Committee (RMC) Period: September - December, 2011 RABQSA Report San Diego, California Frank Phillips RABQSA International.
Presented to: By: Date: Federal Aviation Administration Unmanned Aircraft Systems “The Basics” ASPRS Conference San Diego, CA Cherlynn Jones, Air Traffic.
Learn to estimate square roots and solve problems using square roots.
Cooperation Afloat Readiness and Training Humanitarian Assistance / Disaster Relief Within CARAT 8 April 2010 SE Asia Senior Leadership Seminar, Manila.
The Internet of Things, BYU Buildings. What does it cost to support an office employee?  Office space leasing ($18/sq.ft./year)  Office & data services.
Aircraft Build Project Proposal to build a Club aircraft.
1 Air Tour Operating Authority (ATOA) Reporting System What It Is:  A web based system that enables its users to report, track, and manage air tour operating.
BY KING KOEN GRAYSON (THE BEST) 6 TH.  The river walk is a famous tourist attraction in San Antonio. The riverwalk is basically a river lined with shops.
Priority Environmental Investment Programme National Workshop Montenegro Priority Water Projects on the PEIP List Budva, 13 th May 2008 Ruslan Zhechkov,
1 Expansion of San Diego Freedom Ranch Expansion of San Diego Freedom Ranch.
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
November 2, 2005San Diego, California1 Strawman Projection Activity Targets (Day 1 – ) Phase III/IV Project Technical Workshop #2 November 1-2,
Prineville City Council April 12, 2016 ROBERTS FIELD MUNICIPAL AIRPORT.
Executive Committee President VP Air OpsVP Finance VP GroundsVP Logistics President Elect VP Public Relations VP Site Prep.
Environmental Impact Report (EIR) Update May 2, 2016.
Urban lands uses residential land use commercial land use industrial land use mixed land use Residential Land Use Mixed Land Use Industrial Land Use.
premier dispensary design builds installs.
1 Mulch Lane Bridgeton Mo
Kawartha Lakes Municipal Airport
CONTEMPORARY ECONOMICS
Mobile Home Park Investment Fund
Industrial Development Bonds for growing manufacturing businesses
BAE Systems, Inc. Sectors at a Glance
Sub-group on Process Efficiency 2nd meeting, 14 Jan 2009 Frankfurt am Main T2S Project Team European Central Bank.
NEW DEALER APPLICATION & APPROVAL PROCESS
HOME PAGE PHOTO SLIDESHOW
Airport Service Market Report : Trends, Forecast and Competitive Analysis 1.
Airport Uses During Emergencies
Air Force ROTC Detachment 842 The University of Texas at San Antonio
Palace Way Mobile Home Park
2429 Iowa (Suite B-D) Your Business 13,000 SF available Office Space
McKinney Airport Master Plan Update April 3, 2018
McKinney Airport Master Plan Update June
INDUSTRIAL / COMMERCIAL Facility For Lease
Wind Picture of wind farm in Judith Gap, Montana (Wickimedia).
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
Problems with the Chinese Economy
AFILAND AVIATION REFORM PROJECT,2009
Phase II Funding Student Branch: Trinity University
RMC Summer Workshop 2012 July 19 – 20, 2012
Presentation transcript:

Air Group One Expansion Project Phase 1 Design and Cost Analysis

An Air Group One for the Future, San Diego’s Commemorative Air Force.

Overview  hangar to maintain 5-6 warbird aircraft. 1 large warbird  Relief from costs of commercial lease and exponential rise in costs, securing AG-1’s future.  Open to the public  Higher priority/status at Gillespie Field  Shop and work area for volunteer projects

Design

Public Viewing Area

Workshop for Volunteers

Museum open to the public

Costs  The project can be incremental depending on the financing plan.  $20/square foot for the structure of 120’x100’ = $240,000  $5/square foot for concrete 7” deep for hangar = $60,000  Additional ramp area. $40,000  $50,000 for soft costs  $390,000 for Total Estimated Costs