Test beams for 2011-2013 Introduction and plan for discussion EUDET contract to end Dec. 2010 ‘Mombusho’ to end…. Canada funding secure till April 2012.

Slides:



Advertisements
Similar presentations
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Advertisements

Beam Test and Detector R&D LCWT 09 November 2, 2009 Takeshi MATSUDA DESY/FLC & KEK/IPNS.
7/16/03LC TB Summary1 LC TB Goals and Organization Detector groups have made significant progress Individual detector groups have been working on TB efforts.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
Gakujyutsu sousei ( 学術創成) JSPS funding ■ ILC detector R&D fund ■ GLD’s 3 detector componenets ◆ Vertexing ◆ TPC ◆ Calorimter (mostly HCAL) ■ + Optimization.
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
UK ILC Tracker Meeting Oxford 15 April Liverpool activities HV-CMOS Sensor development in HV-CMOS, benefitting from 2 year PRD grant (Matthew Buckland,
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
1 ILC Detector Activities in Japan Hitoshi Yamamoto Tohoku University IRFU Linear Collider Days, Sacley November 29, 2013.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
G-2, EDM, COMET muon particle physics programmes at J-PARC Mu_01 Satoshi MIHARA IPNS, KEK FKPPL-FJPPL workshop, Yonesei Univ.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
TPC Studies at University of Victoria ALCPG meeting SLAC, January 2004 Dean Karlen University of Victoria / TRIUMF.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Prospects of the ATF operation in FY2016 N. Terunuma, KEK 19 th ATF TB/SGC meeting Jan , LAL Orsay.
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
Input to Strategy currently planned
LC Test Beam Activities
Introduction to the Workshop
What is ATTRACT? ATTRACT (breAkThrough innovaTion pRogrAmme for deteCtor / inrAstructure eCosysTem) A proposal from CERN to the European Commission (EC)
Working for a detector project: A message from AIDA
Status of International Collaboration for CEPC Detectors R&D
Toward the final design of a TPC for the ILD detector
WP-conveners 3rd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
WP-conveners 1st phone meeting
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Covering a Large Area ILC-TPC endplate
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012 but insufficient US funding promissing but not yet established LHC/LC situation to clear up in the next few years (LHC startup -> first results -> review LC project -> start design and construction) New european R&D effort in preparation in FP7 RD51 collaboration ‘up and running’ WHAT SHOULD WE DO TO BE READY AT DUE DATE?

R&D Questions What improvement(s) need the present facility? Going to CERN or elsewhere : Do we want it? When? Do we need a larger, higher field magnet? (Are we ready to spend a million or so for this?) What would we learn from an integrated 'slice' vertex+TPC+Cal ? Will we need a beam with the ILC time structure? Where can we carry out power-switching tests? Ion backflow and gating studies? Cooling studies? Mechanical studies? Vibrations? Distortion studies? Laser alignment ? Do we need a new endplate? A new cage? Our relations with RD51 The technology choice(s) : When and How?

TB in Possible scenarios as outlined in MOA Addendum : Ron Settles Funding : Detector R&D in FP7 : Ties Behnke KEK GD, R&D and funding plans in Asia : T. Matsuda (or Keisuke, or Akira, and/or Yuanning) R&D and funding plans in Americas : D. Karlen (or Dan Peterson) Discussion (all)