Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.

Slides:



Advertisements
Similar presentations
Puget Sound Area Northern Intertie (PSANI) Transmission History ColumbiaGrid September 24, 2007 September 24, 2007 Snohomish County Public Utility District.
Advertisements

NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
(One) Utility IRP Planners Perspective Phillip Popoff Manager, Integrated Resource Planning Puget Sound Energy June 22, 2010.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Houston Region Import Capacity Project Planning for Reliable Power.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Montana Ambassadors Helena, Montana February 25, 2011.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Grid, Smart grid, CURENT. Basic components of the Electric Grid Power Plant- Electricity generation Transmission- Transmit electricity to different areas.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Barrilla Junction Area Transmission Improvements Project
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Pacific Power Seismic Preparedness Update
Recent Approved WECC Cases
Building a Combined 25F Nomogram Step 0: Define Terms
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
ColumbiaGrid Puget Sound Area Study Team
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
Comments received: PSE
Presentation transcript:

Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips

2 PSE Strategy Meet service obligations Follow best practices for reliable, cost efficient system Work collaboratively with stakeholders Consider all alternatives (single utility)

3 Areas of Concern Transmission capacity for Whatcom and Skagit Counties King County capacity Cross Cascade capacity Transmission capacity for Pierce and Thurston Counties

4 BPA’s 500 kV Monroe – Echo LakeWinter/Spring Power Flow

5 BPA’s 500 kV Monroe – Echo LakeSummer/Fall Power Flow Raver - Paul

6 Whatcom/Skagit Counties South of Sedro Cut Plane operational limits  Can be limiting S-N and N-S with single 230kV line outages New service needs  New resources being proposed in US and Canada  Changing generation and industrial loads BPA and Snohomish in parallel

7 Identified Alternatives Sedro-Horse Ranch #2 230kV line  Rebuild 30 miles of existing 115kV  Utilizes existing ROW  Adds third 230kV line across South of Sedro Cutplane

8

9 King County Monroe-Echo Lake Cutplane  BPA internal cutplane  Operational limitations  Highest PSE load density North of Covington  Operational limitations  Growing load service needs BPA, SCL, and Snohomish in parallel

10 Monroe-Echo Lake Alternative Sammamish-Lakeside-Talbot 230kV line  Rebuild 16 miles of existing 115kV  Utilize existing ROW  Adds fourth 230kV line across Monroe-Echo Lake  Provide load service to North King County

11

12 North of Covington Covington-Berrydale 230kV project scheduled for 2008 Relieves operational limits north of Covington Provides loop feed to PSE loads at Berrydale and Talbot

13

14 Cross-Cascades New PSE owned wind generation in Eastern Washington More eastern renewables expected as part of state initiative Growing Puget Sound Load Usage change in Westside resources to firm renewables BPA in parallel and preliminary studies are underway

15 Identified PSE Alternative Conversion of I.P. 115kV line to 230kV  Adds new 230kV line across Cascades  Directly connects to wind resources  Improves load service to Kittitas County  Mostly on existing R.O.W.

16

17 Pierce and Thurston Counties New load growth pushing 230/115kV transformation capacity Raver-Paul cutplane impacts BPA and Tacoma Power in parallel

18 Pierce County Alternative Add 230/115kV transformer at Alderton Substation 230kV source from White River or BPA  Interconnection studies initiated with BPA Provides load service to south King & Pierce Counties Relieves Raver-Paul 115kV constraints north of Alderton

19

20 Thurston County Alternative Add 230/115kV transformer at Saint Clair or Spurgeon Creek (pending site adequacy review) 230kV source from BPA  Interconnection studies being initiated with BPA Provides load service to south Thurston County Relieves BPA Olympia and Tono loading

21

22 Additional 115kV Projects Reconductor Bellingham-Sedro Woolley 115kV lines  Ties between Whatcom and Skagit Counties  4/0 CU to 1272 Bittern Novelty 230/115kV transformer  Load service to north King County Woodland-St Clair 115kV project  Adds 3 rd 115kV line between Pierce and Thurston Counties. (contingent on Timing of 230 kV projects)