Next Generation 3D Imaging Models SEG Research Committee (modeling sub-committee) Bill Abriel Lewis Bartel Bee Bednar Biondo Biondi Joakim Blanch Arthur.

Slides:



Advertisements
Similar presentations
Right of Way Acquisition Process Jesse W. Smith Right of Way Manager.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
SEG Post-Convention Workshop SEAM Phase 1: Initial results Technical and Operational Overview of the SEAM Phase I Project Michael Fehler.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Zonta Club Of _____________Presents “Get Hooked on Zonta!”
Agriculture in the Classroom Canada Building Agriculture Awareness through Education.
The investigator will examine collected data to illustrate the system of communication used to align goals at the various organizational levels of a private.
Using Simulation to Address Challenges of Subsalt Imaging in Tertiary Basins with Emphasis on Deepwater Gulf of Mexico (Paper 23566) Michael Fehler SEG.
Multi-Component Seismic Data Processing
Pre-bid Conference Self-Pay & Third Party Collections Agenda Sign-in Introductions Alliance Overview Sourcing Event Overview Historically Underutilized.
District Business Development Manager February 2015.
Riemannian Wavefield Migration: Wave-equation migration from Topography Jeff Shragge, Guojian Shan, Biondo Biondi Stanford.
Towards Regional Independent Operators – a main driver for successful market integration.
Alabama GIS Executive Council November 17, Alabama GIS Executive Council Governor Bob Riley signs Executive Order No. 38 on November 27 th, 2007.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 6 – 10, 2007 St. Louis, Missouri Trnsport User Group Trnsport Task.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Next Generation 3D Imaging Models Bill Abriel Bee Bednar Biondo Biondi Arthur Cheng Stewart Levin.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Technical sessions 9am-noon Break for lunch (provided) Technical 1-4:00pm; discussion Cocktails and posters 4:30-6:00pm Dobrin 6 – Dr. Brian.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Laura M. Madelone Director, Office of Alumni Affairs, SUNY Oneonta.
Establishing Boundaries and Working Together: Effective Senate-Union Relations Stephanie Dumont, Area D Representative Lesley Kawaguchi, Area C Representative.
SEG 3-D Elastic Salt Model
CS240 Computer Science II Introduction to Unix Based on “UNIX for Programmers and Users” by G.Class and K. Ables.
Michael Ernst, page 1 Collaborative Learning for Security and Repair in Application Communities Performers: MIT and Determina Michael Ernst MIT Computer.
Problem Identification
1 This workshop is part of our commitment to periodically provide you with updated information about BPA’s contracting and project management processes.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Financial Subcommittee Report February 15, Identify options for funding new equipment. Tasks include: Identify and evaluate potential sources of.
Research and Imaging Program for the SVAS. Current Situation Society supports beginners well –Messier Group –Community Outreach programs Monthly star.
Best Practices: Financial Resource Management February 2011.
SEG Advanced Modeling (SEAM) Project The panel: –Bee Bednar, Biondo Biondi, Joakim Blanch,
NDIIPP The Next Phase Meg Williams Associate General Counsel The Library of Congress.
Attribute- Assisted Seismic Processing and Interpretation 3D CONSTRAINED LEAST-SQUARES KIRCHHOFF PRESTACK TIME MIGRATION Alejandro.
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
1 E-911 Services Board Meeting General Business Meeting September 8,
7-1 Project Management from Simple to Complex. 7-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Policies and Procedures for Summer Supplements on Federal Awards April
San Joaquin Delta College Flex Calendar Program General Flex at Delta Types of Activities Administration of Program Process Filling Out the Flex Contract.
Step 1: Build a Planning Team
ITS Contract An Overview of the Instructional Telecommunications Services Contract.
The Summit of the Americas and Property Registration A Background Brief Prepared for the Special Commission on Inter- American Summits Management Prepared.
Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.
Bee SEG Model Consortium Planning Issues The original idea The emerging idea Planning issues.
Towards a Single Economy and a Single Development Vision Norman Girvan UWI.
Office of Human Resources1 PERFORMANCE MANAGEMENT 2008 AT HKS.
Committees. Executive Committee Terms of Reference Committee Type – standing Purpose -. Manage the business and technical affairs of Open Health Tools.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
Fractures play a major role in many tight reservoirs such as shale, carbonate, and low permeability sand by providing fluid flow conduits, for this reason.
1 Business Aspects of Software Engineering SWE 513.
Oracle Services Procurement
Board of Advisors for People continuing in 2 nd year of their term 4 People rotating off the board Must be a member of the Board.
DOE Data Management Plan Requirements
Bill Kuo DTC Science Advisory Board. Outline Charge of DTC Science Advisory Board (SAB) Membership of DTC SAB Operation of DTC SAB Review of DTC tasks.
Rules of Participation in Framework Programme 7 Brussels Office Helmholtz Association of German Research Centres Rue du Trône 98 B-1050 Brüssel
State of Georgia Release Management Training
GIVE YOUR CURRICULUM PROCESS A TUNE-UP: MAKING CURRICULUM PROCESSES EFFECTIVE AND EFFICIENT John Freitas, Los Angeles City College Michael Heumann, Imperial.
SEAM SEG Advanced Modeling Consortium. SEAM Plan Design –Model –Algorithms Data Generation –Realistic Deliverables –Execution Data Storage –Central site.
SOFTC : Honors and Awards Mike Rahmatipour, Chair, Awards Subcommittee 03/12/2011.
Workforce Innovation & Opportunity Act Regional and Local Area Designation and Redesignation Local Workforce Investment Board Listening Session February.
Purdue University’s Approach to Industry-Sponsored Student Class Projects Sponsored Program Services Effective March 1, 2016.
WLA SEG Model Consortium How do we think it is to operate? How does your company view the structural set- up?
Louisiana State University. IT GOVERNANCE LOUISIANA CONSTITUTION (allows us to purchase with state funds) LA REVISED STATUTES (provides the laws that.
PANTHER DISTRICT VENTURING ROUNDTABLE CREW YOUTH POSITIONS AND ELECTION OF OFFICERS VENTURING BSA.
Enron Business Challenges EnronOnline has generated tremendous business value for Enron Maintaining liquidity is critical to sustaining value contribution.
Gunnar Buckau, Forschungszentrum Karlsruhe, Germany
Multi-state Corridor Pooled Fund Program
Governance, Intellectual Property and Membership
Welcome from all of us.
Presentation transcript:

Next Generation 3D Imaging Models SEG Research Committee (modeling sub-committee) Bill Abriel Lewis Bartel Bee Bednar Biondo Biondi Joakim Blanch Arthur Cheng Richard Day Gregory Elbring Mike Fehler Leigh House Stewart Levin Matthias Imhof Neill Simon

Cooperative Motivation Shared numerical models have been advantageous (e.g. Marmousi, SEG 3D subsalt) New problems worth working on are of a size and cost not likely to be born by any one organization 3-D AVO analysis elastic inversion fracture detection prestack geometric attribute analysis shear wave splitting reservoir characterization OBC acquisition, illumination, and analysis multi-component data processing converted wave velocity analysis and imaging polarization filtering Q compensation 3-D prestack migration in rugged topography

Window of opportunity for cooperative project Computational Cost Years Too expensive 3-D two-ways acoustic 3-D two-ways elastic ? 3-D one-way elastic 2.5-D two-ways elastic No need of cooperative project

Window of opportunity for cooperative project Computational Cost Years Too expensive 3-D two-ways acoustic 3-D two-ways elastic ? 3-D one-way elastic 2.5-D two-ways elastic No need of cooperative project 3-D two-ways elastic

Modeling Project Evolution Discussions among motivated colleagues (Stanford SEP etc.) 2004 Ad-hoc meeting at SEG 2004 Denver (including EAGE) –Biondi, Abriel, House, Bednar (and many others – names available) –Recognized rapid advancement in the past 10 years in sophistication of geophysical problems, modeling codes, compute speed, knowledge of properties and physics –Concluded there is significant momentum for modeling project –Recognized need for many models and many years to accomplish things in a step- wise fashion (e.g. elastic follows acoustic) –Proposed a consortium driven by SEG research committee SEG research committee meeting 2005 –Agrees to be project “owner” –Suggest major role for long term project manager (Bee Bednar nominated) –Requests administrative assistance from SEG HQ

SEG executive committee meeting May 2005 Request is to become non-profit SEG “project” with cost recovery. Run by project manager, responsible to consortium members, but under SEG legal controls. Why the SEG ?? A Cooperative activity –Less conflicts of interest than being driven by a university or an oil company –Consistent with SEG charter to advance profession SEG can provide mechanism for contractual and fiscal controls SEG “ownership” provides evergreen intellectual interest –Catalyst for geophysical progress and collaboration –SEG can provide free data for educational purposes (donate to student sections, utility in SEG courses) –opportunity for collaboration with AAPG/SPE in modeling geophysical response of important geology and fluid flow

Business proposal to be developed for distribution Operational structure –Fees $30-$50k / yr (initial 2 yr commitment) –Data exclusive for paying members 2 years –Data can be distributed to educational and non-profit organizations with consensus of paying members – Open access after 2 years (recover copy and storage costs) –SEG fiscal and contractual controls –Project manager for planning, operations, communication and coordination Plans for modeling (2-5 years) –Coordinate with Delft 3D physical model (subsalt) –Expand numerical options in acquisition (Marine patch 3D, 3D VSP etc..) –Build numerous small models to grow expertise in properties (anisotropy, elastic propagation, 4D production effects, complex stratigraphy ….) –Tests and benchmarks of modeling codes and compute resources Start-up planned for Fall 2005 (at or prior to SEG convention)

Operator (SEG) Tax-free status Legal, fiscal and contractual controls Executive Committee Participants (voting) + SEG officer SEG Research chair EAGE advisor Bi-annual Funding Technical program approval Funding approvals Project Manager Model design working group Numerical modeling and software working group Model execution (contract ?) Data distribution and archive (contract ) Analysis working group

Start-up plan (Summer 2005) Goal: Gather momentum before and at SEG convention to secure wide support for the project (e.g. sign up paying companies). Before SEG –Sign-up 6-8 Majors (Major = Major oil company and Large contractor) => Funding Members –Assemble a “model design working group” collecting model components from Funding Members »The Model Design Group should produce a conceptual design of the geological model before SEG. »The group should meet 2-3 times before SEG (first tentative meeting on July 12th at CSM). –Assemble a “numerical algorithm and software” working group to identify candidate for computations At SEG –Present project during already scheduled SEG Post-Convention Workshop –Involve SPE and AAPG in the process by inviting representative to SEG workshop After SEG –Finalize contractual and legal framework –Sign-up medium-size companies –Try to get Grid-vendors (e.g. IBM, Sun) to support project –START

Ziggy physical 3D subsalt Numerical equivalent With enhancements Ziggy physical 3D subsalt Acquisition data sets 1.3D VSP 2.Multi –azimuth 3.… Small scale properties (e.g. velocity) Complex elastic parameters Specific stratigraphy 1 st Q nd Q st Q 2007 (?) Etc…………