5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Weekend: Sat 11th – Mon 13th Reasonably smooth running Saturday:
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Coordination: Gianluigi Arduini & Jan Uythoven
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Yesterday’s morning’s controls issues
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Monday 24 October hours of 25ns MD
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Thursday – Morning Energy matching at injection with H CODs
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Coordination: Eva Barbara Holzer, Mike Lamont
Another Immortal Fill….
Presentation transcript:

5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven

The weekend: Friday LHC 8:30 meeting 5/11/ :45 Stable beams Fill #3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband settings 12:38 Beams dumped, lost BLM crate L8. 79 pb-1 in 3h53m BLM card change and BLM CPU change. Access BBQ and ATLAS. 17:48 Start pre-cycle 19:30 Transfer line steering 20:29 Beams dumped on last injection B2, LHCb BCM 22:09 Filling for physics 23:39 Fill #3259. Stable Beams. Initial lumi 6.5e33 cm-2s-1

The weekend: Saturday LHC 8:30 meeting 5/11/ :04 Beams dumped: Sector 67 trip, RB.A67 ST_ABORT_PIC. Integrated lumi 143 pb-1 in 9h25m. 10:00 Access for ALICE and P6 for MPE piquet and QPS: RB 67 trip was about the sixth time: micro-switch changed. 13:45 Pre-cycle 14:30 Cryogenics problem IP2 16:10 Cryo OK 16:40 Injecting physics beam 16:42 Successful start-up of daughter number 2 of ML 19:15 Stable beams fill 3261, initial lumi 7.3e33 cm-2s-1

The weekend: Sunday 00:55 Beams lost due to possible spurious BLM trigger point 7. Fill 3262 delivered 105 pb-1 in 4h42m 03:59 Stable beams fill 3262, initial lumi 7.0e33 cm-2s-1 04:27 Beams lost due to instability B1. Delivered 11 pb-1 in 0h27m 05:25 Injecting, problems B2 stability, suspect ADT. 04:54 No beam from SPS 07:14 SPS back again, checking ADT at injection. 09:30 Intervention on ADT, set-up of ADT with 6 indivs. 11:30 Ready to inject for physics. 12:54 Stable beams fill 3264, initial lumi 7.1e33 cm-2s-1. 14:25 Beams lost due to spurious BLM trigger L1. 33 pb-1 in 1h31m. 15:27 PS Booster problem: initially RF but then serious problem on injection, stray field compensation. Understood, to be fixed during day. 00:02 Start filling 01:31 Stable Beams fill Initial lumi 7.0e33 cm-2s-1. LHC 8:30 meeting 5/11/2012

The week: many short fills LHC 8:30 meeting 5/11/2012 Fibre & 18 kV BLM ALICE ADT PSB Beam Currents Lumi’s ATLAS & CMS LHCb ALICE

The week – fills summary LHC 8:30 meeting 5/11/2012 FillDayPeak lumi Stable beam [h] Int L [pb -1 ] Dump 3236Sun 28/107.40E+334:0050Operator dump (inherited fill) 3238Mon 29/106.70E+334:3681QPS trigger, two correctors IP Tue 30/107.20E+331:2732QPS RQ5.L1 trigger 3242Tue 30/107.00E+334:2785RF trip Line4 B1 3244Wed 31/107.34E+332:1450QPS heaters powered RQ4.L1, – SEU? 3249Wed 31/107.20E+3314:59199Operator dump 3250Thur 1/117.20E+334:1783QPS trigger RQX.L1 3252Fri 1/117.10E+333:1365QPS on RCB.XV1.R1 3253Fri 1/117.30E+333:5379BLM crate L8 3259Fri 1/116.50E+339:52143QPS trip of RB.A Sat 2/117.30E+334:42105BLM false trigger point Sun 3/117.00E+330:2711Instability B1 3264Sun 3/117.10E+331:3133BLM false trigger L1 3265Mon 4/117.00E+3307:00115Still in Total2d18h1131 > 1.1 fb-1, 40 % in physics

Major down time Optical fibres and SPS 18 kV, planned intervention  Wednesday, planned: Footprint of 6 hours  No knock-on effects, many thanks to Pierre Charrue & team  SPS 18 kV short found BLM replacement of cards and CPU  Friday: 4 hours, 15 min ALICE emergency intervention, QPS in shadow profited to replace micro-switch  Saturday: 4 hours RF- ADT replacement of DSPU board  Sunday: 4 hours PS Booster, RF and injection problems  Sunday: 8 hours 35 min Total with smaller events, 1day and 18 hours : 25 % downtime of which about 1/3 due to injectors LHC 8:30 meeting 5/11/2012

Total lumi’s (yesterday evening) LHC 8:30 meeting 5/11/2012

Plots from statistics pages, since TS3 LHC 8:30 meeting 5/11/ Peak lumi steady above 7e33 cm-2s-1 Bunch intensity taken down a bit, emittance start of sb rather constant

RF voltage and heating: Voltage down Monday morning reduced RF voltage as end of fill test  Counteract heating BSRT, ALFA and MKI New operational procedure for RF  Batch by batch blow up with new target value of 1.5ns (instead of 1.4ns)  Decrease voltage during ramp with correspondingly increased bunch length target during blow-up (10 MV and 1.36 ns) to keep the same longitudinal emittance.  Later in the week brought back up voltage during physics to gain back some lumi LHC 8:30 meeting 5/11/2012

Voltage UP, after 1 hour in stable beams LHC 8:30 meeting 5/11/2012 BSRT, no significant effect ALFA, sees an effect No significant effect on MKI

Effect RF on lumi LHC 8:30 meeting 5/11/2012 Good for the lumi to increase to RF voltage ADT wideband settings, after optimisation, still a (small) negative effect on lumi lifetime

MKI temperature One outlier: MKI.8C.  Not understood why this one hotter. Different layout with damping ferrites and resistor  This magnet also has higher ‘tube temperature’ Increased SIS interlock limit in few steps after rise time measurements when kicker is hot  SIS limit now at 66  C  Did not significantly delay injection during this week. Keep an eye on it LHC 8:30 meeting 5/11/ MKI.8C

Taking out TCLs and Roman Pots Debris collimators at the IP Effect on cryogenics load tested OK  Effect on cryo load – first order ok  More detailed analysis to come (?) TCLs can be taken out when Roman Pots to be moved in Planned to take Roman Pots out this week as end-of-fill  End-of-fill never happened LHC 8:30 meeting 5/11/2012 Ratio of losses TCL-out/TCL-in in IR1

Injection Steering for oscillations regularly needed. Steered on 144 bunches (with intermediate 6 bunch ‘safety’ shot) B2 horizontal oscillations Injection fill 3256 on Friday evening: Last injection: Dump triggered by LHCb BCM upon injection of 144 bunches  In the past this was related to large satellite population... LHC 8:30 meeting 5/11/2012

Effect of batch-by-batch blow-up on inj. losses Friday, fill 3256, blow-up 1.5 ns, dumped on LHCb BCM last inj Saturday, fill 3261, stop blow (up to 1.1 ns), losses not worse at the end Sunday fill 3262, with 1.5 ns blow-up Sunday fill 3264, with 1.1 ns blow-up: ok again Lene has been asked to check loss statistics for the different injections, also depending on bbb blow-up LHC 8:30 meeting 5/11/2012

Satellites and ghosts LDM in physics – satellites at +/- 25 ns. ALICE lumi max about 8 – not that large. B1 B2 They can effect injection losses as they are extracted from the SPS, wider extraction pulse, but lost by LHC injection kicker which has a tighter pulse LHC 8:30 meeting 5/11/2012 Satellites at 25 ns (from PS) Ghosts at 5 ns (from SPS capture)

Instability end of squeeze Beam OFTEN going unstable end of squeeze  At present not a problem for losses, but can blow-up the beam which will reduce luminosity Introduced tune split between the two beams  Vertical tune B1 trimmed down by Did not seem to help LHC 8:30 meeting 5/11/2012

Outstanding LHC 8:30 meeting 3/11/2012 SPS availability  SPS presently without timing system…  Tuesday starting at 8:00: 12 hours technical stop if leaks can be fixed 24 hours if magnet needs to be replaced Injection still ropey – to be re-visited  Check ghost and satellite production in SPS  Related to batch-by-batch blow-up? Also transverse quality of the beam from the injector chain  Better with smaller bunch intensities? ALFA & TOTEM  Move in Roman Pots end of fill  ALFA with TCLs in or out  TOTEM only with TCLs out This week Joerg and Barbara coordinating