Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.

Slides:



Advertisements
Similar presentations
TPC meeting, CERN, January 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, January 2003 Børge Svane Nielsen Niels Bohr.
Advertisements

TPC meeting, GSI, 2-3 June 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, GSI, 2-3 June 2003 Børge Svane Nielsen, Jørn Westergaard Niels.
MU 7 Mak Fu Shun Kong Yau Choi Lee Man Kit Poon San On Zen YKK Project: Automatic adhesive machine.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Introducing Florida Tech Laszlo Baksay Marcus Hohlmann High Energy Physics Group Dept. of Physics & Space Sciences.
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
Calibration of clinometers for the alignment of muon chambers in the CMS experiment. MOSCHOUTIS Thomas FAS meeting – Orlando, 12 March 2004.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Calibration of clinometers for the alignment of muon chambers in the CMS experiment. Thomas MOSCHOUTIS, Marion RIPERT and Georgia KARAGIORGI with Dr HOHLMANN.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Dimensioning Dimensioning.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Drawing Straight Line Graphs
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 28 Absorber Systems & MICE Magnets Session 6 October 2010 technical drawings by.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
LumiCal mechanical design, integration with LDC and laser alignment
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Calvin Kwok Cary Sit Colin Wang Jack Ye Steven Norwood
Transfer Line and CSC Rφ Reconstruction
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
Presentation transcript:

Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 2 Activities since last meeting Florida Tech alignment group met with Dave Eartly on campus Feb 11 & 12 Worked out exact calibration goals & procedures and a tentative schedule Final calibration setup being designed and built Current focus on R sensors and clinometers (most “complex”)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 3 Radial alignment across back & front chambers “up” = front chamber “down = back chamber”

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 4 R-sensor positions & mounts DCOPS & R-sensor mounted on tower DCOPS & R-sensor mounted on plate Straight Line Monitor To transfer plate with R-post ME 2-2 ME 2-1 R-post R-sensors ME-2 example: CAD Drawing by FNAL “down” “up” wire

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 5 R-sensor calibration bench Linear mover (6 μm step size) DCOPS & R-sensor mounting towers (“left” & “right”) Base with dowel pins for attaching DCOPS & R-sensor mounting plates (“left” & “right”) Dowel holes of mounting plate or tower in line with mover axis low R-post high R-post 3D drawing by M. Ripert (Fl. Tech) Florida Tech calibration bench Base for towers

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 6 Calibration bench: Reality

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 7 R-sensor calibration Defined the distance d that will be calibrated: linear mover R-sensor (wire extension potentiometer) precision dowel hole (known in CMS geometry) direction of motion R-post (precision dowel pin) Distance d we will calibrate: “center R-post to center dowel hole” Mounting plate or tower extended wire d Calibration will produce (non-linear) V sensor (d) Will calibrate over range Δd ≈ 3 cm Top view possible true radial direction possible SLM line

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 8 SLM Clinometers in alignment system Clinometers monitor inclination of alignment transfer plates 15 o 75 o -45 o Transfer plates are mounted at 6 different angles in φ

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 9 Clinometer mounts 6 different mounts accommodate various angles of transfer plates, so that null-positions of clinometers are horizontal Mount production: Wisconsin / FNAL Clinometers mount onto horizontal red surfaces All 3-D clinometer drawings: T. Moschoutis (Fl. Tech)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 10 Clinometer calibration prototype calibrated linear mover sensing liquid Clinometer Θ

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 11 Clinometer calibration Calibrated moving table Jig Final design Clinometer mount (mounts in 2 pos. for calibrating tilts in x and y) Red surface indicates position of clinometer spring-loaded base plate All 3-D clinometer drawings: T. Moschoutis (Fl. Tech)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 12 Mounting Clinometers for calibration (1) 45 o clinometer mount 75 o clinometer mount 15 o clinometer mount Jig #1 for mounting 3 clinometer mounts onto calibration device Clinometers mount onto horizontal red surfaces Mounts: Wisconsin / FNAL Jig: in production at Fl. Tech All 3-D clinometer drawings: T. Moschoutis (Fl. Tech)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 13 Mounting Clinometers for calibration (2) Clinometers mount onto horizontal red surfaces Mounts: Wisconsin / FNAL Jigs: in production at Fl. Tech 15 o clinometer mount Jig #4 for mounting -45 o mount Jig #2 for mounting -75 o mount Jig #3 for mounting -15 o mount All 3-D clinometer drawings: T. Moschoutis (Fl. Tech)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 14 Base plate leveling Use Surveyor’s Laser Level to find true horizontal position for base plate Expected leveling precision: 0.1 mrad (0.5 mm over 5 m) (compare to 0.01 o = mrad clinometer resolution)

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 15 Other progress Calibration DAQ –Replaced RS232 serial line for PC – Agilent Multimeter communication with parallel GPIB interface to avoid LabView buffer overruns COCOA alignment program –student Sara Walker has compiled latest greatest COCOA version on CMS cluster at FNAL –slow progress: compiler problems, version changes, … –made deal with Robert Lee: help in exchange for writing a COCOA user manual –getting help from Pedro Arce at CERN

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 16 Calibration schedule May 4, 04 –UW/FNAL (Dave in person) delivers to Fl. Tech at least one final mount with sensor attached for every type by mid-June –Fl. Tech finalizes calibration setups for all sensor types mid-June –Fl. Tech starts calibrating sensors for ME-2 by early September –Fl. Tech has calibrated all ME-2 sensors (=1/8 of total) mid-September –Ship calibrated sensors to CERN for installation on ME-2 September 04 - … 2005 –Fl. Tech continues calibrations & delivery for other disks

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 17 Management issues ProgressProgress –Fl. Tech/CMS MoU for EMU in place since 3/3/04 –SoW for EMU work in FY04 in place since 3/26/04 –Fl. Tech accounting waiting for FNAL P.O. … External Funding –NSF turned us down: very positive on technical issues in proposal But: “viability” issues: new group, small group, … 9% cut for NSF for FY04 Insufficient support from CMS (letters not enough !) NSF recommends strengthening cooperation with other Florida Institutions ( UF !) & starting physics preparation Will try again for fall (DOE/NSF)…

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 18 Loosely related news Have formed a “GRID group” at Fl. Tech: –working with 6 other faculty (4 CS, 2 IT, 2 math) –ante a 48 node Beowulf cluster to join Grid2003 ?! –LB & MH interested in CMS software: development of software alignment tools get involved in PRS Muon → physics with muons possibly ride the tail end of ‘Data Challenge 04’ ?! –CS & IT people interested in developing grid middleware & other grid infrastructure: privacy process mobility, swarm intelligence, …

4/16/2004 M. Hohlmann - EMU meeting at Ohio State University, Columbus 19 Even more loosely related news Then… …now ! New Physics Building