OLD POLE Remediation Project FY11. Old Pole Location.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Division of Reclamation December 4, Signs and Markers Place at all entrances to the permit area from public roads conspicuous signs which state.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Blast Site Edge Protection
Time-Lapse Monitoring of CO2 Injection with Vertical Seismic Profiles (VSP) at the Frio Project T.M. Daley, L.R. Myer*, G.M. Hoversten and E.L. Majer.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Abstract Characterizing the hydrology of the shallow riparian groundwater of the Rio Grande Bosque is important for understanding the interactions with.
Skyscraper Construction
Lecture 4 Excavating and Lifting
Rock Excavation.
Lecture 7 Loading and Hauling
You will be able to describe the passage of depression Klaus over the 23 rd and 24 th of January. Objectives You will be able to identify the different.
ROPE RESCUE 1. Rope Rescue – Providing aid to those in danger where the use of rope and related equipment is needed to perform safe rescue. 2.
Recognizing the Hazards
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
TAPA BARRACKS AT/FP EVALUATION 5 JUNE 12.
Ship Structural Response: Loads
Basic Hydraulics Irrigation.
Science ~ chapter 9 climate
Wrecks of the World II Wreck Remediation and Pollution Recovery – Case Studies Zach Malinoski.
Part 6 Where’s the Tent???? South Pole—Then and Now.
1 SAFETY Rail/Line Haul Operations. 2 SAFETY Agenda l Overview l Rail Team Organization l Risk Assessments l Medical support l Safety support l Ground.
Well Control Events North Texas Exploration Production Safety Network January 22, 2008.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
PRIMARY SCHOOLS’ MATHEMATICS CHALLENGE x 5 ÷ 4 Which number must go into the box on the right side of the scales to balance them with the left.
Autonomous Rovers for Polar Science Campaigns 1. Why Develop Polar Rovers? Reduce logistics costs Less infrastructure Broader safety & weather windows.
CLIMATE.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
How Do Californians Get the Water They Need?. California Science Standard 3.e Students know the origin of the water used by their local communities.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
MSHA Fatalities Involving Drilling Operations. MSHA Fatality INVOLVING DRILLING OPERATIONS On February 17, 1995, a driller with six months of mining experience.
Earth Science: 7.1A Glaciers. Glaciers  As recently as 15,000 years ago, up to 30 percent of earth’s land was covered by an glacial ice.  Earth was.
MNM Fatal Falling Material Accident Falling Material Accident December 23, 2010 (Florida) December 23, 2010 (Florida) Crushed Stone Operation Crushed.
Earth’s Physical Geography. The Seasons – The seasons occur because of the tilt of the Earth’s axis. The Seasons.
DOT/PF INCIDENT RESPONSE FLOOD MAY 09 DISASTER EVENT WASHTO Committee on Maintenance.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
USS DEWERT (FFG-45) Example of Major Casualty Training Scenario for Final Evaluation.
ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban.
MNM Fatal Explosives Accident Explosives Accident September 7, 2011 (Alaska) September 7, 2011 (Alaska) Gold Mine Gold Mine Miner Miner 30 years.
Antarctic Infrastructure and Logistics Update Erick Chiang Section Head Polar Research Support Section Office of Polar Programs.
Methods of Landfilling
Name : Abdulrahman Al-bedah ID : KINGDOM OF SAUDI ARABIA KING SAUD UNIVERSITY CIVIL ENGINEERING DEPARTMENT CE DEEP COMPACTION.
The Island Acipific. Factors Contributing to Climate Location Water Unique Physical Features Wind Pattern.
Global Wind Currents. What do wind patterns have to do with oceans?  CURRENTS.
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
World Trade Centre Collapse Group 17 Valerie Scott Dan Kennedy.
Weather Patterns & Severe Storms Ch 20:1. Air Masses and Weather Air Masses –An air mass is a large body of air that has similar temperatures and moisture.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
 Holds water in the landscape so it infiltrates (drain) into the ground.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Other Applications of Velocity, Acceleration 3.2.
Raytheon Polar Services Company UNITED STATES ANTARCTIC PROGRAM McMurdo Ground Station Workshop Columbus, OH USAP Terascan Satellite Data Systems Overview.
Crater Lake, Oregon. Crater Lake was formed after the collapse of an ancient volcano, posthumously named Mount Mazama. This volcano violently erupted.
West Virginia Fatality Assessment and Control Evaluation.
BUILDING CONSTRUCTION
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
TRANSPORT IN ANTARCTICA. Destination: Antarctica  Antarctica is Earth's southernmost continent, containing the geographic South Pole.  Area is 14,107,000.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
Substructure Groundworks - Hazards
TRI-STAR MINING INC JOB # 3 MSHA ID NO
Earth’s Waters Water Continually Cycles – 1.1
Objectives Upon completion of this module you should be able to:
Air masses & the UK climate
From Tanker Roll-Over to NFA
Click anywhere to get started…
Drilling and Blasting Toolbox Talk : 03 Updated Aug 2014
Climate.
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Presentation transcript:

OLD POLE Remediation Project FY11

Old Pole Location

Objective The objective was to ensure that the area surrounding the Old South Pole Station identified as off limits and unsafe, was evaluated and made safe for normal surface travel and work by personnel or equipment.

Background During the early FY09 winter, the culvert at the entrance of Old Pole was removed and the opening was filled in. Due to an unexpected void beneath the surface, a D7dozer sank approximately 6 feet below the plateau.

Background During the FY10 summer season, Old Pole was surveyed using ground penetrating radar (GPR) The majority of the structures were approximately feet below the surface of the plateau, with one unidentified structure approximately 10’ below the surface Due to the depth of the structures, the site was determined to be safe and able to support heavy equipment movement

MT865 Challenger Upon completion of the bulk dozer work, a final pass to groom the unfinished surface with a MT865 Challenger was being performed when the tractor dropped into an unexpected void beneath the surface. The tractor sank approximately 30 feet below the plateau at its lowest point.

MT865 Challenger January 2010

D8 Dozer During the response to the Challenger incident, a D8 dozer dropped in another hole approximately 150’ grid west of the Challenger location. The back end of the D8 dozer sunk approximately 8’ with the front of the dozer level with the plateau. The equipment was recovered with no injuries to the Operators and only minor damage to the MT865 Challenger

D8 Dozer

Equipment Recovery The D8R was successfully retrieved from the site. The successful retrieval of the Challenger MT865 tractor was completed after excavating a ramp to access the machine.

FY11 Objective The FY11 Old Pole Remediation plan was developed and implemented to collapse the Top Hat structures that were built on top of the T-5 building structures. Combined effort by Raytheon Polar Services (RPS), National Science Foundation (NSF), Cold Region Research Engineering Laboratory (CRREL), and the McMurdo Explosive Team. Test Blast at Old Pole

Top Hats Top Hat extensions were approximately 8’ in height. Reduce snow loads to buildings and act as insulation barriers to prevent snow melting and leakage In some cases two levels- 16 feet high, leaving a manmade void above the T-5 buildings.

CRREL/GPR Survey Old maps and data found in the archives as well as the 2010 GPR report were used to initially locate and flag the area The team fabricated a 15’ boom mounted to the front of the PB100 tracked vehicle

Old Pole GPR Survey

Explosive Team One Lead Blaster, and two Explosive Handlers arrived on 11/ gallon hot water tank and gravity fed hot water drill/hose Dyno Nobel Exgel 75 3” x 16” dynamite 50-grain detonator cord

Hot Water Drilling

Placing Dynamite

First Blast 12/1/10 The Comms, Sick Bay and the Navy Barracks, or buildings #1, #3 and #4 respectively. Forty six (46) holes spaced out 6 feet apart around the perimeter of the buildings Averaging 27 ft in depth 2552 lbs of dynamite 2268’ of 50-grain detonation cord

Blasting Pattern

Blast #1 12/1/10

Blast #1

Second Blast 12/4/10 The Science, Science Quarters and OIC Quarters and Head Module, or buildings #8, #9 and #22 respectively. Forty (40) holes, 6 feet apart around the perimeter of the buildings. Averaging 25 ft in depth 1760 lbs of dynamite 2952’ of 50-grain detonation cord

Blasting Pattern

Blast #2 12/4/10

Blast #2

Third Blast 12/7/10 The Galley, Post Office and Shops, or buildings #5, #6 and #7 respectively. Sixty seven (67) holes, 6 feet apart around the perimeter and in between buildings. Averaging 27 ft in depth 3344 lbs of dynamite 4620’ of 50-grain detonation cord

Blasting Pattern

Third Blast 12/7/10

Blast #3

Aerial of Old Pole Area 2/5/2011

Questions?