EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.

Slides:



Advertisements
Similar presentations
Wetland restoration after a mega-storm Jyneen Thatcher, Wetland Scientist Washington Conservation District Paul Bockenstedt, Ecologist Stantec.
Advertisements

Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
Section 3: Mining Regulations and Mine Reclamation
Cottonwood Wash Abandoned Mine Reclamation Project: A Partnership in Watershed Reclamation.
Geothermal - Utah Program - General Program - General Areas of Geothermal Potential – Prospectively Valuable and Known Geothermal Resource Areas (KGRA)
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
Landslide Disturbance 1 – Landslides, also called debris flows, can rapidly change the landscape of riparian zones. 2 – The sudden movement of debris and.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Vegetation Establishment. Exposed soil occurs on all construction sites.
Methods for the Estimation of Mine Infiltration Bruce Leavitt PE PG, Consulting Hydrogeologist Washington, Pennsylvania.
DROUGHT MONITORING THROUGH THE USE OF MODIS SATELLITE Amy Anderson, Curt Johnson, Dave Prevedel, & Russ Reading.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
The Ecology of Planting Design The North American Deciduous Forests.
Kern River Natural Gas Line Expansion: A Case Study in Overcoming Adversity on a Mountainous Lineal Reclamation Project David Chenoweth, Joe Schneider.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Introduction to Construction General Permit Inspections.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Mine Map Archiving in Utah. IMCC/MSHA Benchmarking Workshop Louisville, Kentucky October 15-16, 2003 Wayne Western, Reclamation Specialist Utah Division.
BIOLOGICAL definition of an invasive exotic NOXIOUS WEED - any plant regulated by a governmental body A WEED is any plant you don’t want.
Earth Day Award Nomination ConocoPhillips Reese Canyon Drill Site Grand Staircase-Escalante National Monument.
Prineville District Vegetation Treatments Using Herbicides on BLM Lands in Oregon Environmental Impact Statement.
Vegetation Inventory and Survey Methods: A Reclamation Tool Monica Pokorny, KC Harvey Environmental, LLC Dennis Neuman, KC Harvey Environmental, LLC Kristine.
Section 3: Mining Regulations and Mine Reclamation
Tree invasion on reclaimed anthracite surface mines in Pennsylvania: Reevaluating inhibition Klemow, K.M., R. Klemish, M. Petras, R. Ali, J. Keller, R.
Definitions for Environmental Reclamation, Remedy, and Restoration.
New Mexico Uranium Exploration & Mining BLM Uranium Workshop August 12, 2008 Salt Lake City, Utah Holland Shepherd, Program Manager Mining Act Reclamation.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Soil Quality Measurement Unit: Soil Science Lesson 7.
Review of Blasting Procedures 1 Utah Regulatory Program Evaluation Year 2002 Review of Blasting Procedures to Ensure Public Notice, Public Participation,
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Director, Jim Karels Florida Department of Agriculture and Consumer Services Charles H. Bronson, Commissioner.
Soil conservation practices Contents Soil conservation practices Soil conservation practices Crop rotation Crop rotation Wind break Wind break Cover.
Electric Powerlines: Design and Construction to Minimize Hazards to Raptors Tonya Buckmaster (OSM-WRCC), Pete Hess (DOGM), Howard Strand (OSM-WRCC), and.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Surface Mining Control and Reclamation Act of 1977 By: Alex Rembolt Period 3 This was approved on August 3, It was amended in 1978, 1980, 1981, 1982,
Vegetation and Soil Programs Mount Rainier National Park.
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Landscape Analysis Project: Craig Mountain Wildlife Management Area For/Range 527 Landscape Ecology.
Chapter 27 Minerals and the Environment. Mining Removal of minerals & fossil fuels from the Earth’s crust.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
UGIP Technical Committee Key Principles of Grazing Management Improves productivity Improves land health Shows responsibility to natural resources Ensures.
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
UTAH BOARD OF OIL, GAS AND MINING EARTH DAY AWARD NOMINATION Canyon Fuel Company, LLC - SUFCO MINE Habitat Improvement Projects Within The Muddy Drainage.
Adapted by Project Greenscape Coordinator LITTORAL SHELF PLANTING Collier County Growth Management Division - Natural Resources Department 2800 North Horseshoe.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Erosion 11/19/08. Soil Erosion  erosion is the removal of material from one place and its transport toward another by the action of wind or water both.
permitting.
Bureau of Land Management Federal Coal Leasing Program Programmatic Environmental Impact Statement Scoping Meeting Supporting Text.
Pennsylvania’s Environmental Good Samaritan Act
Section 3: Mining Regulations and Mine Reclamation
Objectives Upon completion of this module you should be able to:
The Gila River Restoration at Apache Grove
Section 3: Mining Regulations and Mine Reclamation
2018 Excellence in reclamation award
Section 3: Mining Regulations and Mine Reclamation
Section 3: Mining Regulations and Mine Reclamation
Chapter 16 Section 3: Mining Regulations and Mine Reclamation
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Section 3: Mining Regulations and Mine Reclamation
Biomes of the World.
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Overview of US EPA & State Manure Management Regulations
WSUP (Lightning W Tank #2)
Presentation transcript:

EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success

 Priscilla Burton, Steven Demczak, Pamela Grubaugh-Littig(*evaluation leader), and Susan White (Utah-Division of Oil, Gas, and Mining)  Dennis Winterringer (Office of Surface Mining, Western Regional Coordinating Center (OSM-WRCC)) TEAM MEMBERS

REASON FOR TOPIC SELECTION  A fair amount of exploration activity occurs in Utah.  This aspect of the Utah Coal Program not reviewed before in the 6 years of the evaluation team’s existence.

REVIEW –In the six areas disturbed by exploration activities, the team visited 13 holes that had been drilled. –3 for the Canyon Fuel Company LLC SUFCO Mine, –6 for the Canyon Fuel Company LLC Dugout Mine, and –4 for the Canyon Fuel Company LLC Skyline Mine.

PURPOSE  Reclaimed exploration sites and adjacent areas were walked by the team to determine: –1) Whether they caused offsite impacts, and –2) Reclamation success.

CRITERIA USED OFFSITE IMPACTS RECLAMATION SUCCESS

OFFSITE IMPACTS  Offsite impacts occur “outside the area authorized by the permit for conducting mining and reclamation activities.”  None of the exploration operations were major ones requiring a permit, therefore, no “permit boundaries.”  Offsite impacts could not be judged on the basis of occurrences outside the permit boundaries.

RECLAMATION SUCCESS  Excavations returned to the approximate original contour? (R ),  Revegetated to encourage prompt revegetation and recovery of a diverse, effective, and permanent vegetative cover? (R ), –Same seasonal variety native to the areas disturbed? (R ), –Soil surface stabilized by vegetation cover?(R ),

RECLAMATION SUCCESS  All exploration holes, boreholes, wells, and other exposed underground openings reclaimed? (R ), and  All facilities and equipment removed? (except those for environmental monitoring, those for reduction or control of onsite and offsite effects, and those that will facilitate future coal mining and reclamation operations) (R ).

FINDINGS All drill-hole site disturbances were graded and seeded.* Disturbances in the immediate area around the holes were small, in all cases about 0.6 acres or less. *One exception - one drill-hole site at the Skyline Mine, graded but not seeded because the landowner wanted to build a cabin there.

FINDINGS  In most instances, permittees used existing roads, improved for heavy equipment travel - in at least two instances the operators did create new roads (Dugout Mine and Skyline Mine).

FINDINGS  Vegetation types varied considerably depending on the site elevation, slope aspect, and annual precipitation.  Vegetation ranged from dry sagebrush- dominated uplands (Dugout Mine) to wet mountain stream valley meadows (Skyline Mine) to high-elevation alpine tundra (SUFCO Mine).  Drought in Utah for at least the last year. No vegetation observed at one site.

CONCLUSIONS OFFSITE IMPACTS RECLAMATION SUCCESS

OFFSITE IMPACTS  Team concluded that 100 percent of the exploration areas(six of six), including new road segments, were not causing offsite impacts at the time of the field reviews and had not caused offsite impacts in recent times.

RECLAMATION SUCCESS  Operators successfully reclaimed most of the sites  Operators graded the disturbed area to approximate original contour.  Few noxious weeds (thistles) growing on the reclaimed areas - did not affect the overall reclamation success of the sites, because they were not dense and widespread.

RECLAMATION SUCCESS  Established vegetation was generally diverse on the reclaimed areas.  Drought has been impacting Utah over the past couple of years. No germination observed at SUFCO Mine (ACT/041/002- EX-99F).

RECLAMATION SUCCESS  Vegetation on the reclaimed areas was of the same seasonal variety native to the areas disturbed.  The team did not observe any rilling and gullying on the reclaimed areas that need to be repaired.  In all instances, the operators adequately reclaimed the drill holes.  No facilities or equipment on the disturbed areas.

FOLLOW-UP WORK IDENTIFIED  Nonnative plants identified in the seed mixtures for Federal surface lands and observed these plants growing on the sites. –Permanence and adaptability - questionable. –Use of nonnative species in seed mixtures should be discussed with management at the Federal land management agency (U.S. Forest Service, Manti La Sal National Forest) through the interagency group.

FOLLOW-UP WORK  900 feet of new road constructed by Canyon Fuel Company, LLC, Dugout Mine, (Hole DCH-5). –Some vegetation naturally established itself in the road bed, soil berms along the edge of the road and water diversions indications operator had not reclaimed the road. Operator had no record. –DOGM should contact the operator and require reclamation on this road.

FOLLOW-UP WORK  One area may need to be reseeded if germination does not occur by Fall (Canyon Fuel Company LLC SUFCO Mine, ACT/041/002-EX99F, holes , , and ).

RECOMMENDATIONS  SITE RECOMMENDATIONS  PROGRAM RECOMMENDATIONS

SITE RECOMMENDATIONS  Reseeding at SUFCO (EX-99F) if germination does not occur by Fall (holes , , and ).  Dugout Mine, (Hole DCH ‑ 5) needs to be reseeded under the coal mining rules if Utah ‑ DOGM approves a coal methane extraction application for the area or under the coal exploration rules if Utah ‑ DOGM disapproves the application.  One area needs to have a 900-foot segment of road reclaimed (Dugout Mine, AM99H, road to hole G ).

SUFCO MINE

DUGOUT MINE (DCH-5) FUTURE DEGAS WELL

DUGOUT MINE (G)

SKYLINE MINE

PROGRAM RECOMMENDATIONS  Establish procedures for conducting follow-up visits to all exploration sites to ensure that they have been successfully reclaimed.

PROGRAM RECOMMENDATIONS  Suggest to operators that they do surface roughening to increase the chances for revegetation success, and  Meet with management of the U.S. Forest Service (Manti La Sal National Forest) through the interagency meetings and request that they not approve the use of nonnative vegetation species in their seed mixes at mine sites.