Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.

Slides:



Advertisements
Similar presentations
C. M. Johnson, P. H. Riley and C. R. Saha Thermo-acoustic engine converts thermal energy into sound energy by transferring heat between the working media.
Advertisements

WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
DESIGN THAT MATTERS Energy Efficient Stove Innovator – Mr. Prakash. Guide - Saleem Ahmed Students – Christy, Divya, Nived, Kishor, Puttaraj Energy Efficient.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Tests at HiRadMat of advanced SiC and Al 2 O 3 as model targets for radioisotope beam production Experiment proposal Collaboration: Michal Czapski*, Thierry.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
ISIS Second Target Station
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
26/3/03J.E Campagne LAL Horn R&D J.E Campagne, A. Caze (Ph. D), CNGS Horn: G. Macé, S. Wallon New persons: J. Bonis, M. Omesh,… Other IN2P3 members: J.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
The HIE-ISOLDE Design Study Richard Catherall ISOLDE Technical Coordinator CATHI Final Review Meeting Marina H10 Hotel, Barcelona 22 nd – 26 th September.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Carles Colldelram EuroCirCol Kick of meeting, CERN 03/06/2015 CERN March’15 EuroCirCol Kick of meeting Study Beam Induced Vacuum Effects.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ESS Vacuum Standardization
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
SPS High Energy LSS5 Thermal contact & cooling aspects
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
I. Bergevoet - Training preparation
"Drawer Mechanics - MiniDrawer"
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Thermo-electric refrigeration.
Hervé Allain, R. van Weelderen (CERN)
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
P08441:Thermoelectric Auto Exhaust Power Generation
Target and Horn status report
ELECTRICAL ENERGY BASED PROCESSES
p2n Converter Geneva Meeting
2th EuCard Col/Mat WP Meeting
Phase II Collimators : design status
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano Marzari (CERN EN-STI-RBS) CATHI Final Review Meeting Barcelona September 2014

Outline: 1.Thermal measurements 2.Container optimization 3.Water cooling alternatives 4.Other contributions 5.Conclusions

Introduction : The “Target conceptual design” is part of WP6 (Studies for ISOL Target & Front-End upgrades) ESR9 (Target conceptual design) This WP was held by CATHI fellow Serena Cimmino (from February 2012 up to June 2014) Supervisor: Stefano Marzari (EN-STI-RBS)

Introduction : Isolde Target… Isolde Target Isolde Front End protons container Ion source protons Heat generated by proton energy deposition ~500W Heat generated by ohmic heating ~2500W Water cooled 90% Protons from PS Booster Target area Ion beam

Introduction : Main areas of improvement: 1.Thermal measurements and calibrations 2.Target Container (new concept) 3.Water cooling & Safety 4.Nuclearisation (rad hardness and recycling) Isolde Target

1.Thermal measurements : Pyrometer calibration Improve our knowledge in thermocouple and pyrometer utilisation Organisation of a specific training at LNE (Laboratoire National d’Essais) in Paris Collaboration protocol with LNE for future developpements Measurement on the pump stand Comparison with ANSYS model Creation of a reference folder

Our pyrometers Optical pyrometers IR pyrometer dichromatic X

LNE training and future collaboration Thermocouples & Pyrometers calibration Lab Calibration cell development for thermocouple correction on-line :  Melting point reference of a specific metal  Has to be miniaturized  Collaboration protocol under approval

Measurements and simulations Start with a simplified case (bare container without heat screens) Heating Tests on the Pump Stand (measurements with thermocouples and pyrometers) Simulation with ANSYS Workbench and comparison Iterations … Model validation Bare Ta Container Pump Stand

Measurements and simulations Thermo-electrical analysis (and model validation) Comparison with real measurements Catia Model Geometry simplification Results

Creation of a reference folder Folder available for Technicians, Users and students… Paper form and in EDMS database Summary of measurement theory Measurement and off-line user guide Material Emissivity data base

2. Container optimization: Actual design Un-couple container and heating function Uniformise the profile of temperature Reduce the aging factors Reduce weight of waste Improve the temperature control

Actual Isolde design Heating days Contact points Screening system efficiency, container Temperature Tantalum container with 5 layers of thermal insulation Thermal insulation efficiency changes Container material changes characteristics (recrystallization) Target material changes structure  The electrical resistance of the containers changes during operation  The calibration chart T= f(I) is no more reliable ! I current

Thermal profile on the target container Reduction of the production efficiency due to the “cold areas” each side of the container I current Real temperature profile Ideal temperature profile

Un-couple container and heating functions Ta container Graphite heater Graphite insulation Graphite rigid connectors Graphite flexible connectors Utilization of graphite pieces Reduction of Tantalum weight 50% => nuclear wastes reduction

Prototype Thermocouple Insertion of a thermocouple between the heater and the container => Direct Temperature measurement (without calibration)

The tests are promising… Better temperature profile was measured (but could be improved) Good mechanical stability (strength, dilatations) No increase of the outgassing verified (due to the porous graphite insulation) => Next steps: container profile optimization and on-line tests….

3. Water cooling alternatives : Water leaks risks on inside the target volume (for cooled transfer lines) Weldings Brazing !! EB welding >2000°C target container >2000°C ion source Elastomers EPDM O-rings Water circuit

Risk analysis and tests… A test was done simulating a direct water leak on the Tantalum container Hydrogen production by Tantalum oxidation was measured  explosion risk confirmed Test bench Hydrogen production measurement device Water leak target Final Report

Proposed solutions Some solutions were studied and discharged : Utilization of heat pipes (impossible to integrate into a so small volume) Modification of the transfer line geometry to optimize the heat flux Heat pipe diam.8mm, l=100mm ~60W heat removal capacity => We need to remove ~750W ! Examples of geometry trials => Not enough heat transfer capacity

Best solution… Use the same water cooling principle as the 3 power conductors : No more O-rings or welding inside the vacuum ! => In case of leaks no direct contact between water and hot pieces

Study… Additional 4 th cooled finger assembled by EB welding Cooled line screwed on it Thermal contact by pressure L=158mm L=212mm Actual designProposed design => This solution has still to be tested and validated by a prototype

4. Other Serena’s contributions : Molten salt target (supervised by T.Mendonca) Donut neutron converter (supervised by T.Stora) Target Nuclearisation (leak of time…)

Molten salt target Thermal issues analysis Author of a Publication in 2013

“Donut” neutron converter Collaboration with Triumf (CA) Geometry optimization Production analysis with Fluka an thermal analysis with Ansys Isolde traditional converter New “Donut” converter

Target nuclearisation Development of a Rad-Hard design (O-ring water and vacuum tightness) (From CERN Report 4) O-rings Paramètres Isolde Paramètres HIE Isolde

Target nuclearisation Improve the dismountability with remote handling devices (like tele manipulators into the ISOLDE hot cell) If possible, remove to small screws and fittings If possible, integrate the “ITER Remote Handling Code of Practice” (license agreement with CERN)

5. Conclusions : Acknowledgments to Serena for her great and useful work during these 2 years and 4 month fellowship Some studies are not finished and have to be tested and optimized (like the graphite container, the water cooling and the “donut” converter) Thanks for your attention !!