INTRA-DAY TRADING Development of Modification(s) 1st February 2011.

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Market Systems Release Update Modifications Committee Meeting 58 December 4 th
Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, am – 13:00 pm Conference call number: , pin:
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Global Aggregation Working Group 15 th September 2010.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Market Systems Release Update Modifications Committee Meeting 61 April 15 th
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Market Systems Release Update Modifications Committee Meeting 49 June 13 th
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Planning and Community Development Department Housing Element City Council February 03, 2014.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 July 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Mod_02_13 Registration of Charges Legal Spending Update.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
T&SC Modification Proposal: Clarification of Outturn Availability
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Market Trials Structured/Unstruc tured Test Overview December 14, 2012 Casey Cathey ·
Site Specific Proposals Local Development Document Background Papers Presented by Julia Baish 9 November 2011.
FlorenceForum November 2008
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Distribution Workgroup 24/11/16
MOD_04_17 Solar in the SEM 9th June 2017.
Grid Code Development Forum – 6 September 2017
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
MOD_19_18 Part B Housekeeping 1 21st June 2018.
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Update to Unit Under Test Process
Redefinition of Schedule Production Cost
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Credit Cover Signage and Subscript Correction
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
Correction to No Load Cost - “and” vs “or”
Interconnector trading in SEM 7th June 2007
Presentation transcript:

INTRA-DAY TRADING Development of Modification(s) 1st February 2011

During 2010, the RAs instigated the development of proposals in respect of Intra- Day Trading in the SEM. Through the Modifications Committee Working Groups, the High Level Design for Intra-Day Trading was developed. The High Level Design was recommended for approval by the Modifications Committee in Meeting 32. In November 2010, the SEM Committee agreed that SEMO and the TSOs should continue to develop the design in conjunction with the CMS and Operational Scheduler vendor. There is currently no legal drafting to reflect the High Level Design. This document discusses options for the development of the required Modification or Modifications during Introduction

SEMO will be developing the Modifications to align with the High Level Design (developed by SEMO on behalf of the Working Group) and the requirements as provided to the CMS vendor. This is in line with the RA decision paper (SEMO ): SEMO intends to develop a “Plain English” document which will accompany each Modification Proposal. The “Plain English” document associated with each Modification Proposal will: Detail the proposed changes in a more descriptive manner Align with legal drafting Promote understanding of the changes (noting that the legal drafting is what will ultimately be considered by the Modifications Committee) How will the Modifications be developed?

The introduction of intra-day trading in the SEM represents a major change in the market design. As a result, there will be a number of changes that will impact on the Trading and Settlement Code (“Code”), including: Bidding to multiple Gate Windows (EA1, EA2 and WD1) for the relevant Trading Day. Restriction of Interconnector Unit bidding in the EA1 Gate Window to Capacity Holders. Reallocation of unused Interconnector Capacity to any Interconnector Unit (with no requirement to be a Capacity Holder) in EA2 and WD1 MSP Software Runs. Different lengths of Trading Window for each Ex-Ante MSP Software Run: EA1: entire Trading Day EA2: entire Trading Day WD1: second portion of the Trading Day Fixing of Interconnector Unit capacity allocations from EA1 MSP Software Run (MIUNs) in the EA2 and WD1 MSP Software Runs. Changes to Credit Cover arrangements to ensure that the SEM remains as collateralised as possible. Market changes required for Intra-Day Trading

Key T&SC Changes (initial SEMO assessment which needs to be further refined) Code Section Description 2Changes to Registration Processes, particularly in relation to the registration of Interconnector Units. 3Clarification of treatment of Default Data, MSP Software run contingencies and Data Contingencies. 4Explanation of input data (COD, TOD, EDP data) for each Gate Window, description of Trading Windows/Optimisation Time Horizons. 5Clarification of the data required and utilised within each Gate Window and MSP Software Run. 6Clarification of treatment of Trading Day Exchange Rate, Data and Settlement Queries and values for Administered Settlement. App EClarification of publications following each MSP Software Run or Gate Window Closure. App HChanges to Registration Processes, particularly in relation to the registration of Interconnector Units. App IChanges to clarify the Offer Data requirements for each Ex-Ante Gate Window. App JRevision of SMO and TSO Data Transactions (particularly in the context of Technical Offer Data). App KChanges to clarify SMO and TSO Data Transactions (new and existing). App NOptimisation constraints for each MSP Software Run (e.g. Active Capacity Holdings in EA1, Superposition for EA2 and WD1). GlossaryNew and amended Glossary definitions. AP1Changes to Registration processes. AP2Clarification of treatment of Interconnector Units in multiple Gate Windows and Trading Windows. AP3Clarification of testing in the Certification Environment of bid/offer data for each relevant Gate Window. AP4Changes to reflect additional Gate Windows and Trading Windows, along with COD and TOD treatment. AP6Detail of reports published following each Ex-Ante MSP Software Run or Gate Window. AP7Explanation of agreed run contingencies (run cancellation etc). AP9Significant changes to reflect proposed Credit Cover arrangements for Interconnector Units. AP13Possible changes to criteria for Data and Settlement Queries.

Option 1: Single Modification The changes to the Code to account for Intra-Day Trading are wide- ranging. Development, presentation and approval of a single Modification would increase the risks of delay to the approval of the legal drafting: It would delay when the Modifications Committee can consider the proposed text. It would be difficult to consider as a whole in a Modifications Committee meeting.

Option 2: Functional Grouping Group NameSections Included Registration and Submission  Section 2  Section 5 registration-related  Appendix H  Appendix K registration-related transaction  Appendix E registration-related publications  AP1  AP6 registration-related  Key Glossary definitions Bids, Data Transactions and MSP Software  Section 4 (submission and transactions)  Section 5 (Interconnectors & bids/Data Transactions/MSP Software)  AP4 bids  Appendix K Data Transactions  Appendix I  Appendix E scheduling and pricing-related publications Settlement and Credit Management  Section 4 (settlement)  Section 6  Appendix E, CRM or settlement-related publications Functional grouping would allow a consistent set of changes to be considered separately (example grouping below – to be refined following further analysis). Easier for SEMO to develop and the Modifications Committee/RAs to consider. Note: a full analysis has not been completed, hence further changes may be required.

Option 3: Sectional Grouping Group NameSections Included Main SectionsSections 2, 3, 4, 5 and 6 AppendicesAppendices H, I, J, K, N Agreed ProceduresAgreed Procedure 1, 2, 3, 4, 5, 6, 7, 9, 10, 13 and 14 Sectional grouping would allow each section/AP/Appendix to be addressed separately. Would require each section to be revisited once associated changes are made in other sections. More difficult for the Modifications Committee/RAs to consider and approve, as associated changes would not be available to consider at the same time. Note: a full analysis has not been completed, hence further changes may be required.

SEMO Recommendation: Option 2 (Functional Grouping) SEMO recommends that a functional grouping approach is adopted.

Current Committee Timelines Meeting 33: 01 February (Dublin) Meeting 34: 05 April (Belfast) Meeting 35: 09 June (Dublin) Meeting 36: 09 August (Belfast) Meeting 37: 11 October (Dublin) Meeting 38: 06 December (Belfast) SEMO intends to submit Modifications from May 2011

More meetings are needed It is assumed that the Intra-Day Trading Modification(s) need(s) to be approved by the end of 2011/very early SEMO is concerned that the Modifications Committee meeting schedule will be insufficient to allow Modifications Proposals to be considered and approved to meet the intended timetable.

Proposal SEMO proposes that four additional meetings are scheduled, in accordance with AP12: Commence planning, analysis and drafting could begin from mid February 2011

Current Committee Timelines Additional Meeting 1: 10 May (Belfast) Meeting 35: 09 June (Dublin) Additional Meeting 2: 05 July (Dublin) Meeting 36: 09 August (Belfast) Additional Meeting 3: 20 September (Belfast) Meeting 37: 11 October (Dublin) Additional Meeting 4: 10 November (Dublin) Meeting 38: 06 December (Belfast) Note: exact grouping and number of Modification Proposal(s) will be developed by SEMO