Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya W.M.D Jeewantha Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya.

Slides:



Advertisements
Similar presentations
NetPay provides best and effective solution for company Managers to maintain their employee scheduling task (including staff in/out details, overtime,
Advertisements

Windows Server ® 2008 File Services Infrastructure Planning and Design Published: June 2010 Updated: November 2011.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
(Insert Title of Project Here) Kickoff Meeting (Month Date, Year)
Copyright 2002: LIIF Technology Architecture Review Database Application Architecture Database Application Architecture Collaborative Workgroup Architecture.
Cloud Testing – Guidelines and Approach. Agenda Understanding “The Cloud”? Why move to Cloud? Testing Philosophy Challenges Guidelines to select a Cloud.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Chapter 13 Physical Architecture Layer Design
Chapter 5: Project Scope Management
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Services Flexible Workstyle and People-Centric IT Windows Accelerate: Deployment Windows 8.1 Proof of Concept (Window 8.1 PoC) will demonstrate how the.
Customer Sales Presentation Stoneware webNetwork Powered by ThinkServer.
Effectively Explaining the Cloud to Your Colleagues.
Web Development Process Description
How to implement enterprise class communication and collaboration tools on a shoestring budget.
INFO425: Systems Design INFORMATION X Finalizing Scope (functions/level of automation)  Finalizing scope in terms of functions and level of.
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
CLEANROOM SOFTWARE ENGINEERING.
Cloud Computing Kwangyun Cho v=8AXk25TUSRQ.
Microsoft ® System Center Operations Manager 2007 Infrastructure Planning and Design Published: June 2008 Updated: July 2010.
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
1 IT Project – Project Lifecycle, methodologies, tools, resources and other issues.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Open University of Sri Lanka. Domain n Open University of Sri Lanka Web browser Hand held device CyberGIS Web Cloud Existing GIS providers GPS device.
The 2000 Decennial Census School District Project: Using Census Data for the School District Mapping System **** Development and Implementation Tai A.
Chapter 8 Evaluating Alternatives for Requirements, Environment, and Implementation.
Microsoft ® Exchange Server 2010 with Service Pack 1 Infrastructure Planning and Design Published: December 2010 Updated: July 2011.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
I Power Higher Computing Software Development The Software Development Process.
Introduction to Making Multimedia
Windows Server ® 2008 and Windows Server 2008 R2 Print Services Infrastructure Planning and Design Published: June 2010 Updated: November 2011.
Project Management Methodology Development Stage.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Quick Recap Monitoring and Controlling. Lesson 11: Monitoring and Controlling Project Work Topic 11A: Identify the Monitor and Control Project Work Process.
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
June 13-15, 2007Policy 2007 Infrastructure-aware Autonomic Manager for Change Management H. Abdel SalamK. Maly R. MukkamalaM. Zubair Department of Computer.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Chapter 12 The Network Development Life Cycle
Selecting the Best Alternative Design Strategy. Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design.
Internet of Things. Creating Our Future Together.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
Systems Analysis and Design in a Changing World, Fifth Edition
Supervisor : Trần Vinh Thu
Lab A: Planning an Installation
InLoox 9 Web App Product Presentation
Chapter 8 Environments, Alternatives, and Decisions.
CONNECTING TO THE INTERNET
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
MOBILE DEVICE OPERATING SYSTEM
Manfred Huber Based on an earlier presentation by Mike O’Dell, UTA
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
InLoox 9 Web App Product Presentation
Test Planning Mike O’Dell (some edits by Vassilis Athitsos)
Inhalt Project Management in your browser Your Workplace on the Web
Software life cycle models
Agile Process: Overview
Inhalt Project Management in your browser Your Workplace on the Web
Resources and Schedule
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Chapter 11 Selecting the Best Alternative Design Strategy
Chapter 11 Selecting the Best Alternative Design Strategy
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya W.M.D Jeewantha Project Title : CyberGIS Project Members : M.S.R Perera D.S Kulasuriya W.M.D Jeewantha Final Project

Project structure The Project Structure document defines the approach the team will take in organizing and managing the project. It is the strategic representation of initial decisions made regarding goals, work scope, team requirements, team processes, and risk.

Project structure  Goals – Specific Develop CyberGIS as a simple location finder to a complex geographic related analysis and decision support system. Deliver a GIS solution that the society can make more use of it in their domains. Expand the GIS technology into new levels while make use of existing GIS data providers. Research and develop new algorithms where applicable in the GIS process.  Goals - General Finish the project within the scheduled time table. Finish the project within the scheduled budget. Finish the project within the specified guide lines. Finish the project with the same level of quality.

Project structure  Assumptions Team members will be available and fit to perform to their expected task in expected performance, throughout the project. No budget or time restrictions will be applied. Availability of softwares, services and technologies that will be used in the project, throughout the project lifetime. No legal restrictions will be applied on selected project field (GIS using GPS technology).

Project structure  Constraints Limited human resource is available. Initially 3 members and this is fixed and no opportunity to allocate additional members. Limited budget is available because of no funding parties or clients involvement. Technological limitation can occur due to limited resource allocation that will cause to use emulators/simulators where applicable for demonstration and testing purposes. Use of third party open source and free software due to licensing issues may cause to limit the capability, performance, reliability of the final product. Limited time in the schedule and team member’s other activities that they must involve may cause to limit the actual working time that they can involve in the project.

Design Challenge(Problem) Is to simply provide a GIS application that is customizable by the business users according to their business needs. Arising Challenges : 1. Finding & Developing an Algorithm to implement the shortest path calculations between two destinations taking into consideration the closed roads, traffic & one way roads. 2. Finding a suitable & reliable GIS Provider from available GIS Providers & integrating it to the CyberGIS in a customizable manner by the end users. 3. Find a methodology to Implementing a customizable Mapping solution that will allow the user to customize according to his own domain by adding his own icons/images etc.

Overall System Architecture

Deployment Plan for the Project

Functional Specifications Sample Usage Scenario

Functional Specifications Business Requirements The major Business Requirements Found for the CyberGIS includes. - Needs of the businesses to provide a customized GIS Based Services to business users that are customizable to suit their own domain. - Needs of the businesses to keep track & streamline their delivery systems in order to provide the best services to the customers. - Needs of the bussines to Monitor their customer locations based on the customer delivery statistics.

Functional Specifications Operations Requirements The System should be able to operate with optimum performance in internet bandwidth ranging from dialup (52kbps) to ADSL bandwidth (512kbps-3Mbps) & above. The system should be able to render the content effortlessly to various end user devices as personal computers to handheld smart phone devices.

Functional Specifications System Requirements The system requirement s on the deployment (vendor) site should consist of a cluster of web servers running Java EE Edition & jboss Application Server. Each server deployed in the cluster should be at least equipped with the following basic hardware configurations. - Memory 4GB GB HDD. - Ethernet Network Adapters.

Testing Specification Test strategy is to test the system components with unit testing, integration testing, performance testing, security testing and system testing. Test schedule descries how the time allocation is managed to complete the tests within the time frame. Test documentations - Test plan - Test cases and Test case review - Defect report Test deliverables after successful completion are defect free software with documents and test result report.

Thank You !.