Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.

Slides:



Advertisements
Similar presentations
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
By Chris Ford and James Hughes ( ) ( )
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
BoRit Superfund Site Timeline
Resource Conservation and Recovery Act Authorizes EPA to identify hazardous wastes and regulate their generation, transportation, treatment, storage and.
The Process of Siting and Approving a New Landfill in Ontario
WASTEWATER SYSTEM MANAGEMENT by John Lisenko Wastewater systems are indispensable for community health. One of the signs of progress and civilization is.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Environmental Permitting Regulations Tom Fowler – Environment Officer
COMPLIANCE ASSISTANCE OFFICE Giving small businesses a helping hand to overcome hurdles in Environment Regulations Genevieve Salmonson Compliance Assistance.
Federal Energy and Environmental Regulation Agencies and Laws
RECOMMENDATIONS TO SAARC TO ADDRESS URBAN ENVIRONMENTAL CHALLENGES AND POVERTY ALLEVIATION IN THE REGION.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Kiggavik Project Final Hearing Presentation
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
| [Contractor Safety Training] 1 Environmental Policy for Contractors.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
November 2008 Eureka Facilities Meeting. Introduction.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Writing a Compare and Contrast Essay Writing a Compare and Contrast Essay.
Regulatory Framework for Uranium Production Facilities in the U.S.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
HANNAH WALKER RESOURCE CONSERVATION AND RECOVERY ACT.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
1 CXS490 Ozone Protections Program Factsheet
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Resource Conservation and Recovery Act (RCRA) Draft Year: 1976 (drafted as an amendment to the Solid Waste Disposal Act.) Amendment years: 1984(HSWA, Hazardous.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Waste and Hazardous Materials
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Variance Petition Requirements
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Health and Food Safety EU strategy for Pharmaceuticals in the Environment Patrizia Tosetti DG SANTE European Commission China/EU Pharmaceutical Industry.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
GBLWMP-SLUP Integration Meeting February 4-5, 2010 Sahtu Land Use Planning Board.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
WASTEWATER SYSTEM MANAGEMENT by John Lisenko
Restoration and Regulation Discussion
Nunavut Water Board Public Hearing
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Phase 2 Hope Bay Belt Project
Restoration and Regulation Discussion
Environmental Assessment and Licensing (EAL) in Manitoba
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
BAT Work Group.
Restoration and Regulation Discussion
Presentation transcript:

Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License Renewal Application March 2006

Legislative Authority DOE derives its regulatory authority from the Environmental Protection Act (EPA). EPA Prohibits the discharge of a contaminant into the environment. Does not apply if the discharge is authorized by Federal or Territorial Legislation. EPA, its regulations and guidelines are the standard against which development projects are gauged in determining if they should proceed.

Opening Comments DOE avoided providing prescriptive, detailed recommendations for Terms and Conditions. Most DOE comments and suggestions are intended for the City of Iqaluit’s consideration and to assist them with coming into compliance with EPA. Comments intended to be included in the TAC are specifically noted as such.

Topics of Discussion Water Source & Treatment Waste Disposal – Solid Waste Lower Base Contamination Spill/Emergency Response Abandonment and Restoration Waste Disposal – Sewage

Water Source and Treatment DOE accepts the City’s plan as presented. Only real concern is the proximity of the new plateau sub-division to the City’s potable water source. This is a health issue, therefore outside of DOE’s regulatory jurisdiction. It is assumed that Health officials have examined this.

Waste Disposal – Solid Waste DOE will comment on the following aspects: I.Hazardous waste management. II.Runoff/Leachate Monitoring. III.Expansion of current site. IV.Long-term solid waste. management plan. V.Lower Base Contamination VI.Abandonment and Restoration VII.Spill/Emergency Response Plans

Hazardous Waste Management City has made many improvements to their domestic hazardous waste management plan as compared with 10 years ago. City appears to be exercising more control over what enters the landfill*. City will be required to register with DOE as a HW storage facility if they intend to store HW for > 180 days.

Runoff/Leachate Control Leachate may contain substances which can have a detrimental effect on the sewage lagoon. Leachate from the landfill must be collected, contained and treated in an appropriate manner. A leachate and runoff management plan should be submitted to the NWB for review and approval.

Expansion of Existing West 40 Site Current site is approaching capacity. City proposes to expand to a pre-prepared site adjacent to the current site. Proposed site is underlain by a military dump. Limited characterization of this site (“Site 3”) was undertaken in Land ownership undetermined.

Expansion of Existing West 40 Site City would like to use 1995 study results as their baseline study did not include all possible parameters of concern. City should, for their own protection, attempt to characterize this site in greater detail.

Expansion of Existing West 40 Site The terms and conditions of the Water License should include a requirement for leachate and runoff control and treatment for the proposed expanded West 40 landfill.

Long-Term Solid Waste Management Plan DOE recommends that the City of Iqaluit be required to provide a long- term, detailed solid waste management plan for review and approval within four years of the issuance/renewal of their Water Licence.

Lower Base Contamination Anecdotal and physical evidence suggest that Lower Base is underlain by hydrocarbon- contaminated soil, the full extent of which is unknown. First documented in 1990.

Lower Base Contamination Contamination of Lower Base became a public issue in July 2005 with the excavation of trenches for water/sewer lines. DOE believes that this issue is relevant to the Water License.

Lower Base Contamination Environmental Engineering tenet: If you are digging a trench and you find evidence of contamination, the first thing to do is stop digging.

Lower Base Contamination City can not and should not be held responsible for historic contamination, nevertheless: The City of Iqaluit should develop and implement a management plan for contaminated soil and water if they intend to excavate in areas that are suspected to be, or confirmed, contaminated.

Abandonment and Restoration Plans Under “A&R” Plans, City of Iqaluit submitted a 1995 report: Environmental Study of a Military Installation and Six Waste Disposal Sites at Iqaluit, NWT. DOE suggests the City put more effort into developing A&R Plans.

Abandonment and Restoration Plans The City should be required to submit up to date Abandonment and Restoration Plans for those facilities over which they have control; which were, or are, part of their day to day operations; and which have already or are intended to be decommissioned. A&R plans for these facilities should be submitted within four years of the issuance/renewal of the Water Licence or within a time frame acceptable to the NWB.

Spill/Emergency Response

DOE finds the spill contingency plans to be, for the most part, complete and acceptable. Minor suggestions have been made for improvements. The City of Iqaluit should be fully prepared to manage the hazardous materials under their control; including during emergency situations.

Waste Disposal - Sewage DOE has posed a number of questions and offered comments pertaining to the new Waste Water Treatment Plant. The City is advised to address these questions and to take the comments into consideration.

Waste Disposal – Sludge Management City should re-review estimated quantities of bio-solids production using conservative figures for sludge management plan. Evaluation ratings for screened technologies appears to be skewed in favour of air drying. City should explain how they arrived at their ratings.

Waste Disposal – Sludge Management City is advised to review other options such as “trench composting” in an enclosed building. DOE strongly recommends that the City determine with reasonable exactitude, how much land they will require for drying beds, vs. how much land is available.

Waste Disposal – Sludge Management Appendix A of the Sludge Disposal Plan references a similar installation in Sweden. Temperature graph for Swedish city = 7 months above freezing. Iqaluit experiences 4 months of above- freezing temperatures. Has the City determined how Iqaluit conditions will impact this technology?

Waste Disposal – Sewage Lagoon The City of Iqaluit should be required to draft a plan, for review and approval, to manage the existing lagoon, including, but not restricted to: –Measures to be taken in the event of an accidental release (Contingency measures). –Plan for repairs/upgrades to the lagoon (as identified in the various lagoon reports). –Abandonment and decommissioning plan, including provisions on how to manage lagoon sludge.

Summary DOE does not have any “show stopper” concerns with this application. Major concern relates to the paucity of information pertaining to the short and long term management of the current sewage lagoon. City’s proposed sewage treatment system appears to be sound, proven technology.

Summary City should develop A&R plans for those facilities which are under their control/management and which are intended to be closed in the near future. Long-term solid waste management plan. Lower Base Soil & Water Management Plan.

Summary City of Iqaluit is facing problems unlike those faced by any other City in Canada: –historic contaminated sites –aging infrastructure –population boom (2 x since 1991)* –High turnover of engineering staff

Summary Despite these hurdles, the City has progressed in many areas. Room for improvement, however City is to be commended for their continuing efforts. DOE is willing to provide assistance when and where possible.

DOE Priorities Leachate and Runoff Monitoring Plan – June 2006 Leachate and Runoff Control Implementation – Upon commissioning of the new (old) site. Management Plan for Contaminated Soils – June 2006 Lagoon Plan – Within 1 year of issuance of licence Long-Term SWM plan – within 4 years after the issuance of the licence. Abandonment and Restoration Plans – within 4 years of the issuance of the licence or at a time mutually agreed upon by the NWB, the City and other interested parties.