Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.

Slides:



Advertisements
Similar presentations
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
Advertisements

Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
AWAKE Electron Spectrometer Simon Jolly 7 th March 2013.
Transverse Emittance and Energy Spread Measurements for IFMIF-EVEDA C. OLIVER Contributors: P. A. Phi NGHIEM, C. Marolles ABI Workshop on Emittance Diagnostics.
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Pepperpot Emittance Measurements of the FETS Ion Source
RFQ CAD Model Tolerance Studies Simon Jolly 14 th December 2011.
Fusion Physics - Energy Boon or Nuclear Gloom? David Schilter and Shivani Sharma.
SPEC(troscopy) -Trap Outline of talk Introduction – motivation for two cross continent traps Imperial College Group – areas of interest and expertise SPECTRAP/SPECTRAP’
Ultra-sensitive HALO monitor N. Vinogradov, A. Dychkant, P. Piot.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
AWAKE Electron Spectrometer Design Simon Jolly 4 th September 2012.
Electron Spectrometer Progress Report Simon Jolly 19 th October 2012.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Data Acquisition and Error Analysis for Pepperpot Emittance Measurements Simon Jolly Imperial College DIPAC ‘09.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
20to2T5m100cm Images Van Graves February 13, 2014.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
Assessing Single Crystal Diamond Quality
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
FETS RFQ Beam Dynamics Simulations for RFQSIM, CST and Comsol Field Maps Simon Jolly 2 nd June 2010.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
The Heavy Ion Fusion Virtual National Laboratory Neutralized Transport Experiment (NTX) P. K. Roy, S. S. Yu, S. Eylon, E. Henestroza, A. Anders, F. M.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
RF source, volume and caesiated extraction simulations (e-dump)
Global Structure of the Inner Solar Wind and it's Dynamic in the Solar Activity Cycle from IPS Observations with Multi-Beam Radio Telescope BSA LPI Chashei.
Developments of the FETS Ion Source Scott Lawrie.
Pepperpot Emittance Measurement System: Current Status Simon Jolly Imperial College FETS Meeting, 10/05/06.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Progress of Mk.II Pepperpot: Camera, Scintillator and Data Analysis Simon Jolly Imperial College 24 th January 2007.
FETS Ion Source Diagnostics: The Pepperpot
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
GSI IPMs.
Preliminary results for electron lens with beam current of 20 A
GPT Simulations of the Ion Source Beam
Pepperpot Emittance Measurements of the FETS Ion Source
Time-Reversed Particle Simulations In GPT (or “There And Back Again”)
at Royal Holloway Univ. London
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Spectrometer Layout (Isometric View)
Status of the Front End Test Stand April 2007.
Jim Crittenden Electron Cloud/Impedance Meeting 27 May 2015
Optimisation of the FETS RFQ
Experimental Overview
H- Ion Source Development
Pepperpot MkII assembly
200 kV gun CST microwave studio simulations Shield modifications
Electron cloud studies at CESR
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Mechanical Engineering progress for the Front End Test Stand
Simon Jolly UKNFIC Meeting 25th April 2008
Experience with photoinjector at ATF
Presentation transcript:

Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007

13/6/07Simon Jolly, Imperial College2 Pepperpot Components Pepperpot head: –Tungsten intercepting screen, 50  m holes on 3mm pitch in 41x41 array. –Tungsten sandwiched between 2mm/10mm copper support plates. –Quartz scintillator images beamlets. Camera system: –PCO 2000 camera with 2048 x 2048 pixel, 15.3 x 15.6 mm CCD. –Firewire connection to PC. –105 mm Micro-Nikkor macro lens. –Bellows maintains light tight path from vacuum window to camera. Main support: –Head and camera mounted at either end of 1100 mm linear shift mechanism, with 700 mm stroke. –All mounted to single 400 mm diameter vacuum flange.

13/6/07Simon Jolly, Imperial College3 Vacuum bellows Camera Moving rod Shutter Mounting flange Pepperpot head Bellows Tungsten mesh Beam profile head FETS Pepperpot Design

13/6/07Simon Jolly, Imperial College4 Pepperpot Installation

13/6/07Simon Jolly, Imperial College5 “0 mm” position of pepperpot head is 57 mm downstream of cold box exit. 458 mm dynamic range means “300 mm” position is approximately 20 mm upstream of slit- slit scanners. 57 mm Pepperpot Location Inside Ion Source 458 mm 100 mm Measurements taken at 100 mm intervals.

13/6/07Simon Jolly, Imperial College6 Mk.II Pepperpot Recent Improvements Completed: –Multiple calibration markings on pepperpot and profile heads. –Sliding camera mount to improve resolution. –Larger, permanent camera-bellows mount (not cardboard!). To do: –Background light replacement to improve calibration. –Support for new bellows mount. –Clamp to support sliding mount to prevent it toppling forward. –Install new components: Tuesday 16 th June?

13/6/07Simon Jolly, Imperial College7 Pepperpot Data Image Raw dataCalibration image Colour enhanced raw data image, 60 x 60 mm 2. Calibration image: use corners of 9 mm x 9 mm square on copper plate to give image scaling, tilt and spot spacing.

13/6/07Simon Jolly, Imperial College8 Pepperpot Emittance Extraction Pepperpot image spots: hole positions (blue) and beam spots (red) Emittance profiles Y X

13/6/07Simon Jolly, Imperial College9 13 kV Extract: 0 mm

13/6/07Simon Jolly, Imperial College10 13 kV Extract: 100 mm

13/6/07Simon Jolly, Imperial College11 13 kV Extract: 200 mm

13/6/07Simon Jolly, Imperial College12 13 kV Extract: 300 mm

13/6/07Simon Jolly, Imperial College13 Position Variation for 13 kV Extract 0 mm 100 mm 200 mm 300 mm  x = 1.36  y = 1.47  mm mrad  x = 1.82  y = 1.96  mm mrad  x = 1.65  y = 1.78  mm mrad  x = 1.90  y = 2.04  mm mrad

13/6/07Simon Jolly, Imperial College14 Results of Position Variation Behaviour as expected: steady expansion in beam size along the beam axis. Emittances show no obvious nonlinearities; increases may be a result of space charge effects. Level of space charge compensation needs to be investigated with beam dynamics simulations. Flat top and bottom of the beam profile are likely due to collimation occurring upstream of the ion source exit.

13/6/07Simon Jolly, Imperial College15 6 kV Extract: 0 mm

13/6/07Simon Jolly, Imperial College16 9 kV Extract: 0 mm

13/6/07Simon Jolly, Imperial College17 13 kV Extract: 0 mm

13/6/07Simon Jolly, Imperial College18 17 kV Extract: 0 mm

13/6/07Simon Jolly, Imperial College19 Variation of Extract Voltage at 0 mm 6 kV 9 kV 13 kV 17 kV  x = 0.25  y = 0.77  mm mrad  x = 1.36  y = 1.47  mm mrad  x = 0.74  y = 1.14  mm mrad  x = 2.02  y = 1.92  mm mrad

13/6/07Simon Jolly, Imperial College20 Results of Extract Variation Distinct change in beam shape, density distribution and emittance: –6 kV shows strong asymmetric divergence in both planes. –9 kV shows mostly vertical expansion. –13 kV is nearly symmetric and slightly collimated. –17 kV dominated by collimation. A number of factors contribute to changes: –Upstream collimation. –Change in extract potential: changes shape of field within extract region, and affects shape of discharge plasma. –Increase in extract potential also requires change in 90° sector magnet current: change focussing effect of fringe fields. –Decrease in post-acceleration voltage means transverse focussing from fringe fields within post-acceleration gap will change.

13/6/07Simon Jolly, Imperial College21 Results Summary Extract (kV) Current (mA) Z (mm)Beam size  (  mm mrad) x (mm)y (mm)  x,rms  y,rms ± 1 ± 0.1± 3± 5 %

13/6/07Simon Jolly, Imperial College22 Scintillator Measurements 5 kV Ext5.5 kV Ext6 kV Ext6.5 kV Ext 7 kV Ext8 kV Ext9 kV Ext11 kV Ext

13/6/07Simon Jolly, Imperial College23 Scintillator/Pepperpot Comparison: 6 kV

13/6/07Simon Jolly, Imperial College24 Scintillator/Pepperpot Comparison: 9 kV

13/6/07Simon Jolly, Imperial College25 Conclusions First results already promising. Detailed research program under discussion: start with categorising scintillator. Clear comparison between scintillator and pepperpot measurements: calibration markings should allow precise correlation between the two. Quality of results should improve with latest modifications. Lots of data to take…