MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware WP 4.2 site surveys WP 4.4 test of the proof of concept cable deployment and landing shore station
MeDON meeting 09 mars Observatory architecture designed for shallow water deployed by local & small nautical means able to be maintain with local means able to host new sensors (any type) easy to adapt to deep water or other layout
MeDON meeting 09 mars shelter (energy & telecom) Armored cable End termination Hybrid connector Removable module node JB Sensors Equipment camera frame (heavy)
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars Tests in pool and at sea
MeDON meeting 09 mars MeDON meeting 09 mars IFREMER Electronics & software
MeDON meeting 09 mars MeDON meeting 09 mars General electrical sketch Molène shelter
MeDON meeting 09 mars MeDON meeting 09 mars Molène shelter electrical sketch
MeDON meeting 09 mars General electrical sketch Node 10/22
MeDON meeting 09 mars Node electrical sketch 11/22
MeDON meeting 09 mars General electrical sketch Junction Box 12/22
MeDON meeting 09 mars Junction box electrical sketch 13/22
MeDON meeting 09 mars Overall software architecture MeDON meeting 09 mars
MeDON meeting 09 mars MeDON meeting 09 mars Software architecture
MeDON meeting 09 mars Open test bench MeDON meeting 09 mars
MeDON meeting 09 mars Hydrophone integration & tests (open test bench) MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars WP 4.2 site surveys Regulation: Marine Natura 2000 site (special protection area) Environmental impact assessment waiting Navy permission (ok for other authorities)
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars Cable landing site
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars
MeDON meeting 09 mars