Survey of cathode deformations and further actions F. Vercellati – INFN-PV C. Montanari – CERN / INFN-PV weekly meeting, March 12, 20151.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
TDI observations winter break 2012 Thanks to F. Loprete, E. Page, B. Henrist, B. Salvant.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Lab #3 Report due TODAY Individual Data Processing and Individual Write Up Lab #3 Report is due TODAY by midnight Answer Multiple Choice Questions ONLINE.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
1 Installation of Delphi Frame  ITS Installation.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Annual Meeting – October 8, Status of the CEA Saclay R&D activities on pixelised readout of TPC David Attié, Paul Colas,
CEDAR Opening 26/03/2012-FH1. Cedar Overview 26/03/2012-FH2.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Update on X Band Klystron Modulator Installation.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Environmental monitoring Continuous in-situ monitoring systems.
Pedestrian Safety Effects of Bumper Test Area Determination Using the Old vs. the New Method Presented by the experts of OICA Informal document GRSP
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
IT-4189 Supply and installation of a cryogenic distribution system
TEST MODULE WG Cradles for CLIC module supporting system
Naming convention and layout database for the East Area
- CT INSTALLATION PROCEDURE OVERVIEW -
Analysis of optical IPM data
News about the WA104 Programme
G. Carboni for the Muon Group
Requirements of the support mechanics
Pressure vs height (solid CPA plane)
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Preparations for test of
LINAC4 LEBT beam size and emittance diagnostics
TPC Paul Colas Technical meeting, Lyon.
The Tutorial Process.
EUDET Extended SC meeting 31 August 2009
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Rack Placement Chopper Workshop
After service guide for changing PCB
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Survey of cathode deformations and further actions F. Vercellati – INFN-PV C. Montanari – CERN / INFN-PV weekly meeting, March 12, 20151

Cathode survey and present activities l We completed the mapping of cathode planarity on a grid of points with 300 mm spacing. Data are being transcribed and will be delivered soon. l Please keep this presentation as a reference for the measurements. l We are preparing to dismount the first cathode panel. The cables at the front (HV connection side) and the front “cross” have been dismounted. The first beam holding the first panel and hosting the HV connection cup has been removed. Level meters, position sensors and purity monitors have been removed. l Following a safety review from Olga and Erwan and thanks to Dimiter, we are implementing a protection for the wires (a net) and a working plane all along the TPC. l The first cathode panel will be dismounted between today and tomorrow. l In the next three weeks we will remove the rivets that are holding the pierced sheet and plan for further actions. Slide: 2 weekly meeting, March 12, 2015

Cathode panels Slide: 3 weekly meeting, March 12, 2015 X Y Origin Last column of the grid 118

Cathode deformations Slide: 4 weekly meeting, March 12, 2015 Panel 1 Panel 2 Panel 3 Panel 4

View of the TPC front side Slide: 5 weekly meeting, March 12, 2015 First cathode panel Beams of the “cross”

Net to protect the wires Slide: 6 weekly meeting, March 12, 2015

Working plane (to be extended) Slide: 7 weekly meeting, March 12, 2015