CERN PCB workshop CPW Rui de Oliveira on behalf of PCB workshop team 29/11/20121.

Slides:



Advertisements
Similar presentations
Results of a R&D Micromegas Bulk Results of a R&D S. Aune a, M. Boyer a, A. Delbart a, R. De Oliveira b, A. Giganon a, Y. Giomataris a A CEA / DAPNIA,
Advertisements

Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
50  m 140  m Leszek Ropelewski, CERN Maxim Titov, CEA Saclay, France Micromegas: GEM + CMOS ASIC Thick GEM + (THGEM) OUTLINE:  News  RD51 Collaboration.
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Status of the ATLAS MM project
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
TE/MPE/EM/PMT activity Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
Industrial Production of MPGDs Rui de Oliveira Workshop on neutron detection with MPGD CERN October
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
CERN PCB workshop activities
Fabrication techniques and industrialization of MPGDs.
F. Formenti - Annecy industry-academia meeting on MPGDs - April 27th Efforts for industrialization of GEMs and Micromegas at CERN Outline: 1)WG6.
RD 51 Collaboration News Leszek Ropelewski (CERN), Maxim Titov (CEA Saclay) RD51 Collaboration Mini-Week, CERN Geneva, December 3-5, RD51 Member.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
WG1 summary P. Colas, S. Duarte Pinto RD51 Collaboration meeting in Bari October 7-10, 2010.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
GainEnergy resolution DIRECTION DES SCIENCES DE LA MATIERE LABORATOIRE DE RECHERCHE SUR LES LOIS FONDAMENTALES DE L’UNIVERS CENTRE DE SACLAY Contact :
Situation with industry Rui de Oliveira RD51 CERN October
09/06/2009Rui De Oliveira1 Large MPGD production status.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Situation with industry
L. M. Pant 1, A. K. Mohanty 1, O. J. Pinto 2, S. Gadhadharan 2, Pradeep Menon 2, Archana Sharma 3, Rui De Oliviera 3 1 Nuclear Physics Division, Bhabha.
Technological Aspects and Developments of New Detector structures
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN State of the art technologies for front-end hybrids.
F. Formenti - RD51 collaboration meeting February 20th-22nd, Brief CMS and Atlas upgrade plans Status and follow up for: Newflex Eltos Techtra Recent.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
RD 51 Collaboration News Leszek Ropelewski (CERN), Maxim Titov (CEA Saclay) 10 th RD51 Collaboration Meeting, Stony Brook, USA, October 1-4, RD51.
RD 51 & CERN Workshop Upgrade RD 51 & CERN Workshop Upgrade Leszek Ropelewski (CERN), Maxim Titov (CEA Saclay) CERN, November 6, 2009.
M. Bianco On behalf of the ATLAS Collaboration
Working Group 1 WG1 Geometry and Interactions Technological Aspects and Developments of New Detector structures.
Low Mass Rui de Oliveira (CERN) July
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
Resistive protections Rui de Oliveira 09/12/15
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
Working Group 1 Technological Aspects and Developments of New Detector structures WG1 Geometry and Interactions.
L. M. Pant, A. K. Mohanty Nuclear Physics Division Bhabha Atomic Research Centre, Mumbai on behalf of India CMS GEM collaboration Indian Industrial Outreach.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Academia meets Industry: RPC and TGC Vienna University of Technology March 25 th 2014 By R. Santonico.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
GEM, Resistive M-Bulk, ThGEM detector production. Rui De Oliveira, Cosimo Cantini, Antonio Teixeira, Olivier Pizzirusso, Julien Burnens Annecy 26/04/2012.
Large size MPGD production: -GEM update -read out board infos Rui De Oliveira CERN 28/04/2009.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
GEM, Micromegas detector production. detector’s dynamic range detector’s dynamic range Rui De Oliveira Catania 24/11/ /11/20111Rui De Oliveira.
CEA DSM Irfu Micromegas R&D for ILC and sLHC at Saclay P. Colas, I. Giomataris, M. Titov.
-Stephan AUNE- RD51 BARI. Saclay MPGD workshop R&D 09/10/20101 Saclay workshop R&D for new Bulk structure.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GEM Integrated PCB readout and cooling
Large volume GEM production Rui De Oliveira TE/MPE/EM
New MPGDs at CERN PCB Workshop
GEM and MicroMegas R&D Xiaomei Li Science and Technology
Gaseous detectors Task Resistive anode Micromegas
Efforts for industrialization of GEMs and Micromegas at CERN
An improved design of R-MSGC
WG1 Task2 New structures, new designs, new geometries
A DLC μRWELL with 2-D Readout
MPGD Experience with Technology Transfer
Presentation transcript:

CERN PCB workshop CPW Rui de Oliveira on behalf of PCB workshop team 29/11/20121

outline Activity Team Fellow/Technical student RD51 collaboration Patents Trainings FP7 and AIDA Building 107 Gallery 29/11/20122

3 20 persons Building :1000 sqr meters Making PCBs since PCB -Rigid -Flex -Flex-rigid -Microvias -fine line (10um) -large size (up to 2m) -Thick film Hybrids -Thin film Hybrids -Chemical milling -Cu, Fe, Al, Au, Ag, W, Mb, Ti, Cr, Ni -MPGD -GEM/thinGEM/THGEM/RETHGEM -MSHP/Cobra -MICROMEGA/ Bulk/ Micro-BULK -RES BULK -Resistive MSGC -R&D on new structures -Low mass circuits -Multilayer flexes with aluminum strips -embedded heat sinks (carbon, graphite, metals, diamon) -Embedded components -passive -Active CPW activity 1.7 Mchf/year turnover + 10% in Mchf equipment

‘96: GEM 50 x 50mm with a gain of 10. ‘97: GEM 100 x 100mm with gain of ‘98: GEM 400 x 400mm; 1D and 2D readouts; micro-groove and micro-well detectors. ‘00: 3D GEM readout; 1D readout for Micromegas in COMPASS. ‘01: PIXEL GEM readout; 2D Micromegas readout. ‘03: PIXEL Micromegas readout. ‘04: Bulk Micromegas detector 100mm x 100mm. Micro BULK detectors ‘06: Half cylindrical GEM detector. ’08: first large GEM 1.2m x 0.4m. First spherical GEM ‘09: first large BULK Micromegas 1.5m x 0.5m ‘11: First resistive Bulk Micromegas 100mm x 100mm ‘12: First 30cm x 30cm NS2 GEM detector ‘12: First 1m2 Resistive Micromegas ‘12: First 2m2 Resistive Micromegas ‘12: First NS2 GEM detector 1.2m x 0.5m ‘12: Full cylindrical GEM detector ‘14: GEM 2m x 0.5m ?? Micromegas 3.4m x 2.2m ?? CPW MPGD history 4

CPW Team 8 Staff – Olivier Pizzirusso, – Serge Ferry, – Antonio Teixeira – Alexandra Gris – Julie Veron – Alexis Rodrigues – David Ranchin – Rui de Oliveira 1 fellow – Silvia Franchino 12 FSU – Bertrand Mehl (team leader) – Ercan Budun – Benilde Martins – Katia Jauregui – Paul N’Guyen – Frank Valente – Xavier Thery – Cedric Callau – Jose Alves – Jorge Penedo – Valerie Akpata – Jonathan Scalet 29/11/20125

CPW fellow/Technical students projects 29/11/20126 Embedded active silicon devices (Kim-Eigard Hines) – Low mass detectors MHSP detectors (Mafalda Macatrao) – Low Ion Feed Back detectors Chemical Microvias (Victor Da Silva) – General High density circuits Self stretching Triple GEM detectors (Christian Waltz) – CMS High Eta Muon Chamber upgrade Spark study (Cosimo Cantini) – Improve THGEM immunity to sparks – ATLAS Muon Chamber upgrade Optimisation of resistive layers in different detectors (Silvia Franchino) – For Higher rate detector applications

CPW participation in RD51 RD51 : Around 90 institutes and more than 450 persons 7 working groups WG1 :R&D on new structures, CPW have introduce: – Bulk Micromega ( with Saclay collaboration) – Resistive protections (with Atlas Collaboration) – Large GEM (with CERN GDD/CMS/INFN Frascati/TUM Munich …) – GEM embedded stretching system NS2 WG6 :Industrialisation, CPW inputs: – Companies visits (more than 10) – TT transfer with selected companies – Institutes trainings 29/11/20127

CPW Patents Large size GEM Chemical micro-vias Resistive protections Special capacitive couplings to reduce electronic channel count in gas detectors Piggy Back Micromegas Micro BULK Micromegas PG and TPG thermal management devices (sold to Queen Mary college) 29/11/20128

9 CPW giving Trainings 29/11/2012 GEM production training: – Techtra 2 weeks (Polish institute) – Xiaomei Li (CIAE Beijing) 1 week Micromegas production training: – CEA Saclay (BULK and resistive protection) many – CEA Saclay : BULK facility Saclay – CIREA and ELTOS (BULK and resistive) 2 CERN + 2 ELTOS – INFN Frascati (Large Micromegas detector) 2 THGEM production – VECC KolKata (polyurethane protection) 1 – Weissmann institute Israel (test and Cleaning) 2 Spray solder mask deposition – Cirly one

Projects FP7, AIDA PMT was involved in an FP7 project in collaboration with 7 institutes, for the development of large size GEMs – Part of the R&D on large size GEM have been financed by this program PMT is involved now in the AIDA program for consolidation of Detector infrastructures – Aida contribution consist in financing the salary of one fellow during 2 years – The task is to set up all machines needed for prototyping large size detector – 9 machines have been bought, 6 are running (total budget 785 KCHF) – The installation of the 3 last ones needs a 1 week stop of the whole activity (we are now looking for the best opportunity). The R&D on large detectors will not be stopped. 29/11/201210

Currently CERN-MPGD workshop is the UNIQUE MPGD production facility (generic R&D, detector components production, quality control) 2008 RD51 Collaboration Survey: 11 RD51– MPGD Production Construction of the new workshop’s building Start : beginning 2012 Completion: October 2014 Upgrade of the workshop approved by CERN management (Nov. 2009): Installation of the new infrastructure to fabricate 2x1m 2 Bulk MM and 2x0.5m 2 GEM COMPLETED GEM: Continuous polyimide etcher Cu electroetch line MicroMegas: Large laminator Large Cu etcher Large UV exposure unit Large resist developer Large resist stripper Large oven Large dryer

12 GEM Single mask examples KLOE – Cylindrical 3 GEM Detector GEM 800mm x 500mm Read-out 2D : 800mmx 500mm GEM 1.1m x 500mm CMS GEM detector GE1/1 03/10/12Rui De Oliveira

03/10/12Rui De Oliveira13 CMS GE1/1 NS2 detector CMS GE1/1 NS2 detector

03/10/1214Rui De Oliveira Bulk Micromegas examples Largest size produced: 1.5m x 0.6m Limited by equipment BULK Technology DUPONT PC 1025 coverlay BOPP Meshes SERITEC stretching T2K ILC DHCAL

detector opened detector closed

Thank you 29/11/201216