AN/ALR-67(V)3 Advanced Special Receiver (ASR) Direct Vendor Delivery Program Presented by: Daniel Buechler ASR R&M IPT Lead (805) 879-2917 dwbuechler@raytheon.com.

Slides:



Advertisements
Similar presentations
(Fighter Avionics Upgrade)
Advertisements

DoN Wiring Information Systems Presented By: Tom Kowalski Assistant Program Manager, Systems Engineering Aircraft Wiring Support Equipment Commodity NAES.
IS Tech Application Resistance to change.  Is necessary  Competition, consumers, technology demand ▪ Better, more perfect products/services ▪ Lower.
Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
DoD Teaming Group E2C2 FST Obsolescence Management Team May 2, 2001
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics Operational Availability Mission Reliability Logistics Response Time Total Life Cycle Cost.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Performance Based Logistics: Transformation Through Partnership.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Mission Statement Our goal is to build relationships and create partnerships with our clients by providing innovative solutions to manage your supply.
Who We Are Raytheon Company is a technology and innovation leader specializing in defense, security and civil markets throughout the world. Number of.
BPT3133 – PROCUREMENT IN INDUSTRIAL MANAGEMENT
Aircraft Tire PBL Programs
DEPARTMENT OF INTELLECTUAL & DEVELOPMENTAL DISABILITIES Project Kickoff Meeting East Regional Office March 7 th, 2013.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
University of Maryland Copyright © 2008 CALCE 1 Center for Advanced Life Cycle Engineering CALCE, Department of Mechanical Engineering University of Maryland.
NDIA Conference:10/22/2003:Page 1 UNCLASSIFIED Copyright © 2003 Raytheon Company All rights reserved Space and Airborne Systems Electronic Warfare Systems.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Server Virtualization: Navy Network Operations Centers
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Honeywell Proprietary Honeywell.com  0 Document control number Honeywell Technology Solutions Inc. Overview November 2007.
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
From Research Prototype to Production
Supply Chain Management Customer Service Operations LB I Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry.
Critical Software © Copyright Critical Software S.A All Rights Reserved. 5 December 2007 Birmingham Enabling Availability Based Contracts HUMS.
Click to edit text Presentation Title Presenter’s name Presenter’s Title Date Be Efficient – Accurate – Connected™
Value and Supply Chain Management. What is Logistics? The Institute of Logistics defines logistics as the management of the flow of goods, information.
Welcome To Business Summary DiveIn Incorporated is a small company that specializes in the sales of swimming pools supplies to homeowners by mail order.
Page 1 Designing for Health; A Methodology for Integrated Diagnostics/Prognostics Raymond Beshears Raytheon 2501 W. University McKinney, TX
Maintenance Overhaul Shops (off-Aircraft)
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Chapter 8 Transaction Processing, Electronic Commerce, and Enterprise Resource Planning Systems.
Reliability & Maintainability Engineering An Introduction Robert Brown Electrical & Computer Engineering Worcester Polytechnic Institute.
Business Functions, Processes, and Data Requirements
Life cycle services for automation products
Distribution Statement B Unclassified Data Distribution Authorized to 2003 NDIA Conference Members. Additional Requests for this document shall be referred.
Next Generation ISEA Roadmap
- Exploring Needs - ERP SOLUTION A Brief Look ”Provide competitive advantage to our clients through the implementation of our business enterprise information.
E-BUSINESS SUITE 11i.10 – CUSTOMER RELATIONSHIP MANAGEMENT ORACLE ACCELERATOR FLOWS, FUNCTIONS & PRODUCTS Sales & Marketing Service Insight to Campaign.
F/A-18 Awarded & Pending PBLs
Hear about Defence Contracting for Military Equipment and the Defence
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
Providing intelligent maintenance solutions for intelligent aircraft.
Central Issuance Registry Presentation for End-Users November, 2008 Special Note: This presentation includes information on Datacard Group’s long range.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
ME Spring 2015 Systems Engineering, Part II Session March 2015 Mr. Larry Hopp, CPL.
LubeWatch® Oil Analysis Program
Summary of Changes to the
SCM Customer Service Operations LB 3
Chapter 18 Maintaining Information Systems
Logistics Depot LLC “Right on Time”
GSSLLC (C) ALL RIGHTS RESERVED
Lockheed Martin Canada’s SMB Mentoring Program
A Process View of the Supply Chain
Chapter # 5 Supporting Quality Devices
Reliable communications at all times.
Presentation transcript:

AN/ALR-67(V)3 Advanced Special Receiver (ASR) Direct Vendor Delivery Program Presented by: Daniel Buechler ASR R&M IPT Lead (805) 879-2917 dwbuechler@raytheon.com

AN/ALR-67(V)3 F/A-18E/F Radar Warning Receiver (RWR) Customer/User: USN Status: Currently in Production PBL Performing Organization: Raytheon EW Operations, Goleta, CA Quadrant Receiver Quadrant Receiver Countermeasures Receiver Antenna Group Low Band Integrated Antenna Antenna Group Quadrant Receiver Quadrant Receiver Countermeasures Computer

What is Direct Vendor Delivery (DVD)? F/A-18E/F Performance Based Logistics (PBL) Program Navy AN/ALR-67(V)3 Radar Warning Receiver Repair Depot Contract Awarded September 1999 Two level maintenance approach On Aircraft: Organic “O Level” Original Equipment Manufacturer (OEM): Depot “D Level” As with other systems, on aircraft failures are isolated to the Weapons Replaceable Assembly (WRA) by the ASR system’s Built in Test (BIT) and reported to the mission computer Suspect WRAs are replaced with a serviceable spare and returned to the OEM, Raytheon, for repair

RFI WRA NRFI WRA NAVICP (EDI) CONUS 940 945 527 Raytheon Fleet The DVD Process NAVICP (EDI) CONUS (2) Normal Supply Requisition (EDI invisible to Fleet) (3) 940 (4) REQUISITION 945 RFI WRA (6) 527 Requisition Order Shipping Advice (1) Receipt of Retrograde (5) NRFI WRA Raytheon Fleet

Performance Metrics Availability Raytheon is required to ship a spare WRA within five working days of receipt of spares request Reliability The Mean Flight Hours Between Failure (MFHBF) shall improve by a prescribed rate over the first five years of deployment Retrogrades The Navy is required to return faulty WRAs to Raytheon within 30 calendar days from issue of a spares request Penalties The penalty for not meeting any metric during a contract year is the provision of additional spares

Availability Steps taken to assure Raytheon achieves the Availability metric Maximize Supply Chain Management efficiency Assure availability of spare parts – front end loaded Dedicated DVD facility Special Test Equipment (STE) Staffing Personnel with the necessary expertise

Reliability Improvement Raytheon has signed up to continuous improvement of the System Reliability metric over the first five years of deployment Reliability growth is achieved by several means Identify and correct failure trends through FRACAS Implement improved designs Technology insertion Back fit of new designs into earlier configuration hardware

MFHBF Metric

Raytheon Responsibilities Ensure a rapid delivery of RFI assets to designated CONUS hub without waiting for a carcass arrival Maintain facilities to repair AN/ALR-67(V)3 WRAs Raytheon System level test – Goleta, CA Unit level test and rework – Goleta, CA Subassembly level test and rework – El Segundo, CA, Forest, MS, Andover, MA, Dallas, TX Subcontractors – Owego, NY, Bohemia, NY , Lansdale, PA, San Diego, CA Unit level test Subassembly level test and rework Inventory tracking RFI Spares Hardware in rework

Navy Responsibilities On aircraft fault isolation and maintenance Identify suspect WRA Request replacement WRA Remove and replace WRA Return suspect WRA to Raytheon within 30 calendar days Additional Raytheon requested activities Record BIT data and return with WRA Confirm failure on aircraft Swap positions/WRA

Asset Management Raytheon maintains As Built/As Maintained configuration Materials Management Information System (MMIS) Raytheon has Systems Engineering responsibility Configuration control below the WRA level Technology insertion Reliability improvement Parts obsolescence management Not contractually required Assures future supportability Lifetime buy/Redesign

Materials Management Information System (MMIS) MMIS was developed by Raytheon to track all aspects of PBL Programs As Built/As Maintained Document Management Electronic Data Interchange FRACAS Inventory Management MMIS Process Parametric Data Parts Interchangeability Parts Management Project Setup Reporting System Work Flow Web based application Accessible by all Raytheon sites, Customer (Navy) and Subcontractors Access available via PDA/Phone

FRACAS Failure Reporting, Analysis and Corrective Action System (FRACAS) Generate a failure report for all field returns Document rework Analyze failed assemblies/components Trend analysis Failure Review Board (FRB) Corrective actions FRACAS data feeds back into field diagnostics

Special Tools CALCE Virtual Qualification Software Located at the University of Maryland, the CALCE Center (Computer Aided Life Cycle Engineering) has formed a consortium of industry and government members investing in the development of methodologies, models, and design tools that address the design and manufacturing of electronic systems Virtual Qualification Software Based on a Physics of Failure approach Captures hybrid/circuit card design Performs simulation in different environments Raytheon has used the software to evaluate: New technologies Redesigns Proposed new designs

Special Tools (cont’d) CALCE Virtual Qualification software thermal and vibration simulation results for a recent new design Thermal Vibration

Summary The ASR Program Office believes that DVD provides substantial benefits to the Navy and to Raytheon Reduced infrastructure costs High Reliability High Availability Raytheon facilities in Goleta and El Segundo, California, Forest, Mississippi, Dallas, Texas, and Andover, Massachusetts are all committed to the success of the Program