RESULTS – Fertilization Overview Interior 2012 Fertilization Meeting February 8 th, 2012 Prince George, BC Paul Rehsler, RPF Resource Practices Branch.

Slides:



Advertisements
Similar presentations
EziLink RESULTS Training Session 1 – Show and Tell For the Ministry of Forests, Lands and Natural Resource Operations.
Advertisements

RESULTS Amendments and Updates March 2012 Presented by Mei-Ching Tsoi
RESULTS Training Core Module 4 Obligation Reporting Standards Unit Modifications Overview Sept 2013.
RESULTS Training Core Module 5 Obligation Reporting Standards Unit Modifications-ESF Sept 2013.
RESULTS Spacing Reporting December Background Spacing activity is conducted on young stands soon after free growing on pre-existing silviculture.
RESULTS Training Core Module 1 Obligation Reporting Policy and Business Context Sept 2013.
Manage Transfer Students. C3-TF Manage Transfer Students by School Student Registrar Description: –This function allows the School Student Registrar to;
RESULTS Training Woodlot Reporting to RESULTS ESF Submission March 2013 Mei-Ching Tsoi
Backlog NSR Project Review and RESULTS Issues Land Based Investment Strategy (LBIS): Current Reforestation and Timber Supply Mitigation Meeting September.
Manage Examination 3 rd March 2015, Tuesday –
New Student Orientation Registration System Stephen Nakamura EE496 Final Presentation Fall 2008.
Using Social Care Online: an overview Version 1.0 April 2015.
RESULTS Training Woodlot Reporting to RESULTS Online Data Entry March 2013 Mei-Ching Tsoi
RESULTS Training Woodlot Reporting to RESULTS Online Data Entry Demo March 2013 Mei-Ching Tsoi
Understanding Key Applications 1 Ministry of Forests Understanding Key Applications: An overview of application inter-connections Corporate IT Training.
RESULTS Training Forest for Tomorrow Jan Learning Objectives Documentation Guidance Opening Codes and Funding source Codes Use of New vs. Existing.
5 Year Silviculture Plan Development Process Presented by Kevin Telfer R.P.Bio., R.P.F. Stewardship Forester Coast Region.
Spring 2006 Version 3.0 Overview Module. FTA/ESF Overview Module Introduction to the Session Welcome to the FTA/ESF Overview Training Session 1.1.
BUDGET MANAGEMENT TRAINING PEOPLESOFT 8.9 Scott McElroy Office of Budget & Finance.
RESULTS Training Core Module 3 Obligation Reporting Submitting by ESF Sept 2013.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Live Meeting RESULTS - Reports Species Monitoring.
RESULTS Forest Cover – Treed Retention January 2010 Presented by Mei-Ching Tsoi
RESULTS Spacing Reporting December Background Spacing activity is conducted on young stands soon after free growing on pre-existing silviculture.
RESULTS FRPA s.108 Application November 2010 Presented by Mei-Ching Tsoi
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
A new Integrated World Linking Results-Based Code, Inventory Updates & Timber Supply Review By the FC Linkages Team October 2, 2002.
1 FSP Tracking System Overview Bill Beard / John Gallimore March 8, 2007 A presentation at the PFIT Post FSP Workshop by Bill Beard/John Gallimore on the.
RESULTS Corporate Reporting System March 2012 Presented by Mei-Ching Tsoi
Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management.
IIS Home Screen (Teacher) Copyright © 2011 Pearson Education, Inc. or its affiliates. All rights reserved.1.
October 2008 Version 4.0 FTA/ESF Recreation Module.
A1 Agenda RESULTS Training RESULTS & Mapview RESULTS & Mapview MOF Information Management Group 2005 Module 8 – RESULTS & Mapview.
Lead Management Tool Partner User Guide March 15, 2013
Intra SEZ Transfer Request Demo 1.IntroductionIntroduction 2.Nature of transactions coveredNature of transactions covered 3.Role of Unit Maker/CHA user.
Silviculture Reporting Silviculture business under the FRPA Act and revised FPC Ralph Winter Forest Practices Branch Feb 10, 2003.
RESULTS Business & CRS Overview March 2010 Presented by Mei-Ching Tsoi
RESULTS Training Woodlot Reporting to RESULTS Legislative Context and Submission Documentation March 2013 Mei-Ching Tsoi
A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports.
Post-FSP World Making it work between Tenures, C&E, Stewardship (Larry Badowski) (Tenures Officer – PGFD) A presentation at the PFIT Post FSP Workshop.
Streamlining Project Final Version August 2005 Cutblock Integration Team Proposals Creating a streamlined forest information management model…
What’s New? RESULTS Training RESULTS 3.0 What’s New? RESULTS 3.0 What’s New? MoFR Information Management Group March 2007 Module 12 – RESULTS 3.0 What’s.
RESULTS Training Carbon Offset Reporting to RESULTS Sept 2013.
Quesnel Forest District Sharing of experiences and learning's Gord Wall, Tenure Supervisor ESF Implementation Team Member.
Integrated Land and Resource Registry Integrated Land Management Bureau.
Key BC Silviculture Statistics ä Forest Practices Branch BC Forest Service September 8, 2009.
RESULTS Spatial Views & Business Overview November 2009 Presented by Mei-Ching Tsoi
V Slide 1V 1.0Slide 1 School Details School Administrator School JAN 1 Class Subject Update School Details  Basic Information  School Management.
RESULTS Training Core Module 2 Obligation Reporting Online Entry and Mandatory ESF Conditions Sept 2013.
HR Information System Upgrade eRecruitment. HR Information System Upgrade – eRecruitment 2 Welcome to today’s session on eRecruitment Your Presenters.
ISES Discipline Collection Fall 2007 – Segment 1.
Candidates: Administrators:
ADAPTIVE SPORT GRANT PRESENTATION To Access the Meeting: Code 49048# Online:
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
RESULTS: A New Integrated Tool for Forest Stewardship John Gallimore, RPF Information Management Group Ministry of Forests ESF User Meeting December 9th,
FAQ Webinar Call for Proposals Call toll-free: (local: ) Participant code: # Webinar Dates: August 11 – August.
Title I Equipment Inventory Requirements
Title I Equipment Inventory Requirements
Title I Equipment Inventory Requirements
Live Meeting RESULTS - Reports Species Monitoring.
Workday Financials Role Mapping Guide For Business Operations
Role Mapping Guide for Business Operations
LAND BASED INVESTMENT STRATEGY
IBM Embedded Solution Agreement (ESA)
Exploring the new HelpDesk System of Region One
[insert Module title here]
ETS – Air Data submission Training
Title I Equipment Inventory Requirements
RESULTS 3.0 What’s New? 1 MoFR Information Management Group March 2007
On-line Training for iBooking.
Presentation transcript:

RESULTS – Fertilization Overview Interior 2012 Fertilization Meeting February 8 th, 2012 Prince George, BC Paul Rehsler, RPF Resource Practices Branch

Requirement to report Policy driven requirement, as per the RESULTS Information Submission Specifications for Government Funded Silviculture Activities (RISS-gf), Broad treatments over large areas Why report? To track and monitor investments

What gets submitted? –Opening definition, for new shell openings –Fertilization assessment, SU FE –Planned fertilization (immediate and future), FE NUT / CGE –Completed treatments FE NUT / CGE –Post-treatment monitoring SU FE –Supporting documents Spatial data is submitted for all fertilization activities

What does this information get used for? Support to LBIP administrators Timber supply review Planning subsequent treatments Access management Preclude harvest until gains are realized

Shell Openings vs. individual Openings Shell openings: covers large areas, spanning many openings and areas where there are no openings in RESULTS, complete coverage (assessed, planned, treated) in one record. Individual openings: provides full historical context BUT Its labour intensive to submit to all impacted openings Area outside openings reported as shell opening Shell openings spanning multiple part openings

Step 1: Create a shell opening Specifics: Opening Category – NREQ (Not Required) Opening Gross Area – 0.1ha (minimum impacts on reporting) Approval Date – can be current date No opening definition gml. Step 2: Once the shell opening is created, add the following information Specifics: Set Opening Status to “FG” (District staff to set) Set Timber Supply Block – assist in TSR & reporting

Step 3: Create the spatial submission to the shell opening Use ESF Submission Tool to set up ESF Fertilization Treatment xml with Activity GML Map. Specifics: Use Opening ID as the key (not tenure information)! EXAMPLE: Completed Treatment Activity Mandatory data: Base: FE Tech: CA Method: HELI Objective: CGE Funding Source: FTL or FTM Completion Date Area Treated Interagency Number (conditional) Project No (conditional) GML Map Comments

The ESF submission looks like this:

Fertilizer Monitoring Plots: Mel Scott provided to Mei-Ching and Matt LeRoy who submitted to RESULTS via ESF Each plot was buffered to create 1 ha openings in order to get the plots into RESULTS as polygons Monitoring plots for each geographic area (i.e. PG) were submitted as one opening Coded as silviculture trials, SX silviculture base method code, not FE Data relevant to each project was attached to the opening in RESULTS, i.e. detailed measurements in excel

Prince George monitoring plots, SX FE, 1 ha blobs, multi-part polygons:

How to Access Fertilizer Activities in RESULTS: Corporate Reporting System (CRS), link from RESULTS

Note: choose to view CSV format online, although shown as an option, CSV’s won’t be ed to you

Land and Resource Data Warehouse (LRDW) Query the Activity Treatment SVW for silv base code = “FE” or silv base code = “SX” Openings SVW for openings with gross area = 0.1 ha

Key Points, Reporting Through to RESULTS: Geometry is required for both planned and completed fertilization activities We are getting lots of new shell openings with actual gross area values in the Opening Gross Area – that has an impact on reporting. Switch to shell opening gross area reporting of 0.1 ha Where using an existing opening to report out on fertilization activities use existing opening gross area

Recent Fertilizer Reporting Performance: Completed Activities, 1100 in the last two fiscals combined (entire province) 157 of which provided no spatial Planned Activities, 255 Planned in the last two fiscals, 188 no geometry provided

Thanks to Matt Leroy and Mei Ching Tsoi