11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change.

Slides:



Advertisements
Similar presentations
Monitoring and Controlling the Project
Advertisements

MGT/437 – Project Management © Westbrook Stevens /23/2015 How to Collect Data  After data collection has been completed,
Monitoring and Controlling the Project
Monitoring and Controlling the Project
Copyright 2005 John Wiley & Sons, Inc Monitoring and Controlling the Project Project Management in Practice Second Edition Mantel, Meredith, Shafer,
Chapter 4: Project Integration Management
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Monitoring and Information Systems
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
A Maturity Model for Project Portfolio Management
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management: A Managerial Approach
Fundamentals of Information Systems, Second Edition
Project Management Session 7
Chapter 3: The Project Management Process Groups
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Learning Objectives Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life.
Managing Projects
Chapter 7 Process Management
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Presentation of of Project management on PROJECT CONTROL Presented By:- Arpana.
Copyright 2012 John Wiley & Sons, Inc. Chapter 11 Project Control.
What is Business Analysis Planning & Monitoring?
Systems Analysis and Design in a Changing World, 6th Edition
S/W Project Management
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
© Gunnar Wettergren1 IV1021 Lecture 6 – Monitoring and terminating Gunnar Wettergren
Resources Performance time. resources Performance time 2.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
1 Mgmt 371 Chapter Twenty Basic Elements of Control Much of the slide content was created by Dr, Charlie Cook, Houghton Mifflin, Co.©
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
“How to fail in project management without really trying” –J. K
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Management: A Managerial Approach
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
Project Management: A Managerial Approach
Controlling projects: The Management Process
MEM 612 Project Management Chapter 7 Monitoring and Controlling the Project.
Copyright 2012 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Place Slide Title Text Here ©2013 John Wiley & Sons, Inc. All rights reserved. 9-1 ©2013 John Wiley & Sons, Inc. All rights reserved. JOHN R. SCHERMERHORN,
What is project management?
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
Advanced Project Management Project Planning Phase Ghazala Amin.
Ch7: Project Monitoring and Control  To reduce differences between plan and actual in the 3D space of T/C/P.  Best utilization of organization’s primary.
1 Controls in Strategic management Dr. Fred Mugambi Mwirigi JKUAT.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Not for Distribution Outside of MBP1 April 11, 2012.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
The Project Management Process Groups
Basic Elements of Control Chapter 11. The Nature of Control in Organizations Control The regulation of organizational activities so that some targeted.
Copyright 2009 John Wiley & Sons, Inc. Chapter 11 Project Control.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
PROJECT CONTROL Project Control Defined Types of Control Systems
Systems Analysis and Design in a Changing World, 4th Edition
CS4311 Spring 2011 Process Improvement Dr
Monitoring and Controlling the Project
Information Technology Project Management – Fifth Edition
Chapter 9 Fundamentals of Control
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Earned Value Management
Software life cycle models
Project Management: A Managerial Approach 4/e
Chapter 11 Project Control.
Chapter 11 Project Control.
Chapter 11 Project Control.
Presentation transcript:

11-1 PROJECT CONTROL Project Control Defined Types of Control Systems Need for Balance in Control Systems Control of Creative Efforts Changes and Change Control

11-2 Project Control Defined CONTROL: The act of reducing the difference between plan and reality The last element in the plan-implement- monitor-control cycle Uses the information from the monitoring process to get and keep a project on track

11-3 Control Can Be Complicated Performance, cost, and schedule issues all have a human element Symptoms are obvious, but root causes never are “Messes” vs. “problems” Hard to separate random events from systemic difficulties

11-4 Two Fundamental Purposes of Project Control Regulate project results through alteration of activities Efficiently use and protect organizational assets

11-5 Asset Conservation Has Three Aspects Physical Assets Maintenance, inventories, security protection Human Resources Managing acquisition, development and performance of people Financial Resources Budgets, audits, financial ratio analyses The concept of “due diligence”

11-6 Purpose of Control To make the actual meet the plan The Process 1. Identify key performance areas 2. Set standards 3. Measure performance 4. Compare 5. Take corrective action

11-7 Three Types of Controls Cybernetic controls “Steering” Key feature: automatic operation Go-no go controls Most common project control Test that predetermined specifications have been met Post controls After the fact

11-8 A Cybernetic Control System, Figure 11-1

11-9 Typical Paths for Correction of Deviation, Figure 11-2

11-10 A 2 nd -Order Feedback System, Figure 11-3

11-11 A 3 rd -Order Feedback System, Figure 11-4

11-12 More on Go-No Go Controls Based on project plans, budgets, schedules Can be periodic or milestone-driven Both are essential “Phase-gated” criteria are hurdles that must be passed to go to next project stage Common terms: “exit criteria,” “milestone decisions,” “system maturity models”

11-13 Sample Project Status Report, Figure 11-5

11-14 Components of Post Control Process Benefits future projects more than the present one See Project Auditing in Chapter 12 Four parts Project objectives Milestones, checkpoints, budgets Final report on project results Recommendations

11-15 Some Desirable Control System Features Flexible, able to adapt to unforeseen events Cost effective (control value > control cost) Useful and ethical Accurate, precise, timely Simple and maintainable Fully documented

11-16 Critical Ratio Critical ratio = actual progress X budgeted cost scheduled progress actual cost I.e., CSI = SPI X CPI, as in Chapter 10 Indices and ratios greater than 1.0 are favorable

11-17 Critical Ratio Control Limits, Figure 11-8

11-18 Cost Control Chart, Figure 11-9

11-19 Effective Control Systems Must be Balanced Balance means Measuring both tangibles and intangibles Looking at both long-term and short Keeping flexibility in the system Addressing human factors Focusing on correction, not punishment Optimizing control, not maximizing it

11-20 A Question of Balance Too little control? Too much control? $ Amount of Control C Control C Mistakes

11-21 Control of Creative Activities Controlling “knowledge work” is difficult Three tools Progress reviews Reassigning people Control of resource inputs

11-22 Controlling Changes and Scope Creep Changes can drive higher costs and stretched out schedules So controlling them is an essential project management task A formal change system is a must for project control

11-23 Five Principles of a Formal Change Program All contracts specify formal change process All changes require formal change order All change orders approved in writing by client and project organization Project manager is always consulted The approved change order becomes part of the master plan

11-24 Changes and Change Control Remember the last step of the control process: Take corrective action, so that the actual matches the plan Two Types: Business and Technical Changes

11-25 Business Changes Business-related Driven by such things as: Spec relief Deliverables changes Funding shifts Schedule changes Acts of God Subcontractor changes

11-26 Technical Changes Technological issues, such as: New technologies Laws of physics Competitor response Changes in client requirements (real or political)