AGATA: Advanced Gamma Tracking Array

Slides:



Advertisements
Similar presentations
The AGATA Project First 4pi -ray spectrometer built completely from Germanium detectors. Based on the novel technique of gamma-ray tracking. Measures radiation.
Advertisements

Călin A. Ur* for the AGATA Collaboration INFN – Sezione di Padova
Nuclear Structure with Gamma-ray Tracking Arrays
Advanced GAmma Tracking Array
Pete Jones University of Jyväskylä INTAG Workshop GSI, Germany May 2007 Status of digital electronics at JYFL Pete Jones Department of Physics University.
AGATA Introduction John Simpson Nuclear Physics Group.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
HISPEC/DESPEC meeting GSI, 21/02/ Introduction: what happened recently (B.Rubio) 2. Beam quality: energy buncher (C.Brandau) 3. Layout.
Congresso del Dipartimento di Fisica Highlights in Physics –14 October 2005, Dipartimento di Fisica, Università di Milano Study of exotic nuclei.
The AGATA project concept of  - ray tracking design and development Witek Męczyński The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy.
Relativistic Coulomb excitation of nuclei near 100 Sn C.Fahlander, J. Eckman, M. Mineva, D. Rudolph, Dept. Phys., Lund University, Sweden M.G., A.Banu,
AGATA A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration FEE Workshop November 17 th -18 th 2011 PROMETEO.
Coulomb excitation of the presumably super-deformed band in 42 Ca - preliminary results from the first AGATA Demonstrator experiment Katarzyna Hadyńska-Klęk.
Depletion Region Dynamics of an AGATA Detector Steven Moon University of Liverpool UNTF 2010, University of Salford 14 th -16 nd April 2010.
WP1: Detector Assembly Liverpool Tasks:  Detector specification measurement Assembly of components in progress  Detector assembly for scanning Work in.
TRACKING TEAM Introduction What has been done What still needs to be done.
The AGATA Demonstrator at LNL: Status of the installation and scientific programme. A.Gadea CSIC-IFIC / INFN-LNL on behalf of E.Farnea (new local responsible)
AGATA: Advanced Gamma Tracking Array
Characterisation & PSA Team Meeting Presentations –Liverpool Status, Andy Boston/Matt Dimmock (Liverpool) –Crosstalk properties of AGATA detectors, Bart.
Workshop on Physics on Nuclei at Extremes, Tokyo Institute of Technology, Institute for Nuclear Research and Nuclear Energy Bulgarian Academy.
Luis M Fraile ISOLDE, PH/IS, CERN, Switzerland Universidad Complutense, Madrid, SPAIN FastPool Fast timing pool of detectors and electronics FastPool EURONS.
Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay.
Wednesday, May 9 th 2007Torsten Beck Fast Pulse Shape Analysis for AGATA-Germanium- Detectors Torsten BeckWednesday, 9. Mai 2007 Student seminar Wednesday,
John Simpson Nuclear Physics Group Daresbury Laboratory The AGATA project NUSTAR ’05 University of Surrey January 2005.
Status of the ISOLDE DECAY STATION - IDS Hilde De Witte IDS status report, ISCC, June 24 th 2014.
AGATA Pre-processing team report AGATA Week, July 2008.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
Primary beam production target ESR The GSI Radioactive Beam Facilities RISING high-resolution Ge  -spectrometer.
Paul Greenlees, Department of Physics, University of Jyväskylä, FinlandENAM’04, Callaway Gardens, Sept04 In-beam and decay spectroscopy of transfermium.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
AGATA: Status and Perspectives E.Farnea INFN Sezione di Padova, Italy on behalf of the AGATA Collaboration.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
In-beam performance of AGATA-DEMONSTRATOR Ideas for the firsts commissioning experiments of the AGATA-DEMONSTRATOR campaign at LNL-Legnaro F. Recchia INFN-LNL.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
AGATA and the Physics Programme Dino Bazzacco INFN Padova on behalf of the AGATA collaboration NuPECC Meeting with Funding Agencies November 29, 2004,
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
AGATA AGATA Advanced Gamma-Ray Tracking Array Next-generation spectrometer based on  -ray tracking Radioactive and stable beams, high recoil velocities.
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
AGATA: Status of the Implementation and Performance A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration.
AGATA Week Introduction John Simpson Nuclear Physics Group GSI, February 2005.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
Data Analysis Working Group AGATA Tasks of the WG Schedule Johan Nyberg, ADAWG meeting, June 12-13, 2003, NBI.
Compton Add-Back Protocols for use with the EXOGAM Array Adam Garnsworthy University of Surrey Methods for improving spectra through reducing the effects.
Detector Module Three 36-fold segmented detectors 111 preamplifiers Cryostat Jürgen Eberth University of Cologne Detector Team: Dirk Weißhaar Preampl.
PSA: ADAPTIVE GRID SEARCH The Method Experimental Results Optimization aspects Roberto Venturelli (INFN Padova - IPSIA “Giorgi” Verona) SACLAY, 05-may-06.
AGATA Detector Meeting March 16th, 2006, Cologne Detector Acceptance Tests: delivered: three symmetric detectors S001 properties excellent S002 properties.
A realistic simulation of the AGATA Demonstrator +PRISMA Spectrometer Elif INCE, Istanbul University 7 th AGATA Week, July 2008.
Daniel Bloor & The AGATA Collaboration IoP NPPD Conference, University of Glasgow, 05/04/11. Development of a simulation package for fragmentation reactions.
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Wolfram KORTEN DAPNIA/SPhN AGATA “Gamma-ray tracking” AGATA “Gamma-ray tracking” A novel technique for building high-resolution Ge spectrometers.
Silvia Lenzi – GTH-2012 Workshop, Padova, October 29-31, 2012 EGAN Silvia M. Lenzi University of Padova and INFN
AGATA; status, plans and opportunities
AGATA MANAGEMENT BOARD AND TEAMS
Complementary detectors for campaign
1st PSeGe Workshop, IPNO & CSNSM Orsay 3rd -4th October 2016
Topolgical data analysis for AGATA
for the EURISOL Steering Committee
Efficiency versus energy resolution
Detectors and Preamplifiers
Status of the AGATA installation at GANIL
for the LNL-Ganil collaboration
ASC report AGATA week Orsay Oct. 3-7, 2016
What the Advanced Gamma Tracking Array can do for us Nuclear science in the 21st century AGATA PSD8 Glasgow Andy Boston
Status of the AGATA installation at GANIL
CAT of AGATA detectors &
SIGMA: a detector for γ-ray spectroscopy & imaging Dr Laura AGATA/GRETINA Collaboration Meeting
Presentation transcript:

AGATA: Advanced Gamma Tracking Array

Introductions Presentations John Simpson International Project Leader Chair of AGATA management Board Technical co-ordinator International status and overview Paul Nolan Chair of AGATA Steering Committee UK Spokesperson Status of this grant Jonathan Strachan Project manager AGATA Mechanical Engineer & WP6 leader

International status and Overview What is AGATA? AGATA Demonstrator Phase Status UK Contribution New MoU (exploitation and development) Physics Campaigns

New challenges in Nuclear Structure Shell structure in nuclei Structure of doubly magic nuclei Changes in the (effective) interactions Transfermium nuclei Shape coexistence Proton drip line and N=Z nuclei Spectroscopy beyond the drip line Proton-neutron pairing Isospin symmetry Nuclear shapes and high spins Exotic shapes and isomers Hyperdeformation Coexistence and transitions 48Ni 100Sn 78Ni 132+xSn Neutron rich heavy nuclei (N/Z → 2) Large neutron skins (rn-rp→ 1fm) New coherent excitation modes Shell quenching Nuclei at the neutron drip line (Z→25) Very large proton-neutron asymmetries Resonant excitation modes Neutron Decay

Huge increase in sensitivity Idea of -ray tracking Large Gamma Arrays based on Compton Suppressed Spectrometers Tracking Arrays based on Position Sensitive Ge Detectors Previous array Compton suppression Eff max at 10% good resolution Exogam, Miniball, high efficiency for medium multiplicity Limited by solid angle subtended by the shields 50% coverage Throw away suppression shields Track every event Reconstruct the full energy 2 major projects AGATA and GRETA Eff 40% and multiplicity 1 Even 20% at multiplicity 30 EUROBALL AGATA e ~ 10 — 5 % ( Mg=1 — Mg=30) e ~ 40 — 20 % ( Mg=1 — Mg=30) Huge increase in sensitivity

Long Range Plan 2004 Recommendations and priorities In order to exploit present and future facilities fully and most efficiently, advanced instrumentation and detection equipment will be required to carry on the various programmes. The project AGATA, for a 4-array of highly segmented Ge detectors for g-ray detection and tracking, will benefit research programmes in the various facilities in Europe. NuPECC gives full support for the construction of AGATA and recommends that the R&D phase be pursued with vigour. Long Range Plan 2009/10 AGATA the major instrument

AGATA (Design and characteristics) 4 -array for Nuclear Physics Experiments at European accelerators providing radioactive and stable beams Main features of AGATA Efficiency: 43% (M =1) 28% (M =30) today’s arrays ~10% (gain ~4) 5% (gain ~1000) Peak/Total: 58% (M=1) 49% (M=30) today ~55% 40% Angular Resolution: ~1º  FWHM (1 MeV, v/c=50%) ~ 6 keV !!! today ~40 keV Rates: 3 MHz (M=1) 300 kHz (M =30) today 1 MHz 20 kHz Summary List few items Agata very powerful instrument for nuclear spectroscopy Exciting science programme subject of this meeting Aim to propose and start realisation of the full AGATA from 2008 180 large volume 36-fold segmented Ge crystals in 60 triple-clusters Digital electronics and sophisticated Pulse Shape Analysis algorithms allow Operation of Ge detectors in position sensitive mode  -ray tracking

The AGATA Collaboration Memorandum of Understanding 2003 Research and Development phase Bulgaria: Univ. Sofia Denmark: NBI Copenhagen Finland: Univ. Jyväskylä France: GANIL Caen, IPN Lyon, CSNSM Orsay, IPN Orsay, CEA-DSM-DAPNIA Saclay, IreS Strasbourg Germany: GSI Darmstadt, TU Darmstadt, Univ. zu Köln, LMU München, TU München Hungary: Debrecen Italy: INFN and Univ. Firenze, INFN and Univ. Genova, INFN Legnaro, INFN and Univ. Napoli, INFN and Univ. Padova, INFN and Univ. Milano, INFN Perugia and Univ. Camerino Poland: IFJ PAN Krakow, SINS Swierk, HIL & IEP Warsaw Romania: NIPNE & PU Bucharest Sweden: Chalmers Univ. of Technology Göteborg, Lund Univ., Royal Institute of Technology Stockholm, Uppsala Univ. UK: Univ. Brighton, STFC Daresbury, Univ. Edinburgh, Univ. Liverpool, Univ. Manchester, Univ. Paisley, Univ. Surrey, Univ. York Turkey: Univ. of Ankara, Istanbul University   Huge collaboration Over 40 laboratories in 10 countries Others joining, Turkey, Hungary

The First Step: The AGATA Demonstrator 1 symmetric triple-cluster 5 asymmetric triple-clusters 36-fold segmented crystals 540 segments 555 digital-channels Eff. 3 – 8 % @ Mg = 1 Eff. 2 – 4 % @ Mg = 30 Full EDAQ with on line PSA and g-ray tracking In beam Commissioning Technical proposal for full array Cost 6.7 M€ Capital Powerful array in its own right Still to decide where to site Still to decide the key test experiments

Ingredients of g-Tracking 4 1 Identified interaction points Reconstruction of tracks e.g. by evaluation of permutations of interaction points Highly segmented HPGe detectors (x,y,z,E,t)i g · · · Pulse Shape Analysis to decompose recorded waves · 2 3 What has to be done to perform tracking What are the ingredients Detectors highly segmented, encapsulated, cryostats Electronics Digital PSA to extract Energy Time and Position Algorithm development particularly for position Area where effort is required Thorsten Kroell. See him. Tracking algorithms, reconstruction of the events for full array Obtain full energy Many technical development in all areas. Digital electronics to record and process segment signals reconstructed g-rays

First AGATA triple-detector @ IKP Cologne Credits Weisshaar – CTT – Eberth Lab frame moveable

Asymmetric AGATA Triple Cryostat - integration of 111 high resolution spectroscopy channels - cold FET technology for all signals Challenges: - mechanical precision - heat development, LN2 consumption - microphonics - noise, high frequencies

Detectors 3 symmetric detector delivered and operational 15 asymmetric capsules ordered R&D phase 12 operational 11/12 ordered next phase Deliveries 2009/2010 More orders (France and Italy soon) 5 triple cryostats ordered 2(3) operational 5 test cryostats available (scanning, CAT tests, electronics tests.)

Electronics and Data Acquistion Preamplifiers (Ganil, Milano, Cologne) Digitizers Pre-processing Trigger DAQ (tracking, storage, GUI)

AGATA Digitiser Module 36+1 channels, 100 MhZ, 14 bits (Daresbury – Liverpool - Strasbourg) First production digitizer at Daresbury 18 assembled 7 in operation in Legnaro Prototype Segment Board (2 boards per crystal)

Pre-processing (Position) Management of team only Status: Production for 18 detector/capsules in progress Carrier cards- 25 delivered (8 mid-June). 9 commissioned and working Segment mezzanines- 50 delivered (60 mid-June) 33 working Electronics not on critical path!!

AGATA Demonstrator at PRISMA

Status of the installation Basic local infrastructure complete Full chain of EADQ for one triple complete Full chain for two triples now Commissioning with a simple ancillary Powerful array in its own right Still to decide where to site Still to decide the key test experiments

UK Contribution Project Management Digitizer electronics EDAQ specification Mechanical Design Detector characterisation

International Contribution to R&D phase MoU 2003 Total capital 6.7M€ (ex VAT) UK commitment EPSRC (£2.3M) capital 0.95 M€ (ex VAT), FTE 46.5

Project management: AGATA Organisation AGATA Steering Committee Chairperson: P.J. Nolan, Vice Chairperson: B. Cederwall G.deAngelis, A.Atac, F. Azaiez, D.Balabanski, A, Bracco, D.Bucurescu, B.Cederwall, J. Gerl, J.Jolie, W.Korten R.Julin, W.Meczynski, P.M.Walker AGATA Management Board J.Simpson (Project Manager) D.Bazzacco, G.Duchêne, P. Reiter, A.Gadea, J.Nyberg, Ch. Theisen, E. Farnea AGATA Working Groups and leaders Simulation and Data Analysis J.Nyberg Ancillary detectors and integration A.Gadea Design and Infrastructure G. Duchêne Front-end Processing D.Bazzacco Detector module P.Reiter Data Acquisition Ch. Theisen AGATA Teams How is it organised Steering committee Funding, Steering, represent countries, Science, meetings like this Management Board Technical aspects, deliver the project, manage resources Capital and effort Through a set of working groups and teams. Gamma-ray Tracking A.Lopez-Martens Elec. and DAQ integration P. Bednarczyk Mechanical design J.Strachan Digitisation P.Medina Data acquisition X.Grave Detector and Cryostat B. Bruyneel Physics & exp. simulation E.Farnea Devices for key Experiments N.Redon Infrastructure P.Jones Pre-processing I.Lazarus Run Control & GUI G.Maron Preamplifiers A.Pullia Detector data base K.Hauschild Impact on performance M.Palacz R & D on gamma Detectors D.Curien Global clock and Trigger M.Bellato Detector Characterisation A.Boston Data analysis O.Stezowski Mechanical Integration J. Valiente Dobon PSA R.Gernhaeuser/ P.Desesquelles

Commissioning in Legnaro Series of Source and in-beam tests March (no ancillary) June-July (Dante –MCP) Further 20 days requested from Sept AGATA+DANTE+Interface AGATA+PRISMA (tandem) AGATA+PRISMA (ALPI beams)

In-beam run March 2009 Aims To test the detector in real experiment conditions DAQ Pre-processing electronics On-line analysis Acquire useful data for off-line optimization of the system

RUNNING! 30Si@70MeV + 12C 11:42 17/03/2009 Pre-processing PSA Tracking

Non-segmented detector 1823 keV ??

AGATA DET SEG 17.7 keV

AGATA DET SEG MGS 14.6 keV

AGATA DET SEG MGS JASS 12.5 keV

Run last week Reaction is 56Fe on 208Pb, One triple cluster and DANTE DAQ consists of 11 nodes. PSA, tracking and Doppler correction performed on line considering the central position of DANTE. The spectra show the 2+->0+ of 56Fe at 847 keV. No clear info about the narrowing of the peak. The trigger is the OR of DANTE plus one of the crystal. The coincidence rate is around 150Hz.

Fantastic progress Immediate aims and issues Test with ancillary detector Test with 2 or more triples (2nd installed next week) Start physics experiments

Issues AGATA collaboration Detectors Characterisation Production of electronics Staffing Organisation of the next phase New MoU Siting

New MoU In operation Signed by STFC Defines build up, operation and exploitation of full project New management structure Defines in more detail the build up to a 1/3 array UK signed up bid for 2460 k€ capital 550 FTE (months) This grant 893 k€ capital 470 FTE (months)

New MoU committments UK this grant Other major countries All countries on different timescales Germany 1M€, bid again 2012 Italy 2 triple systems assured, 5 year plan INFN being submitted France Bidding now (3 triple systems initially) Successful defence last week IN2P3 Sweden Bid when relationship to FAIR clear Other countries (Turkey, etc.) Key fact: Will have 10 triple clusters by end 2010

The siting issues At time of grant submission LNL- Ganil- GSI ~15 month campaigns New timescales Ganil Shutdown for SPIRALII installation mid 2011-early 2012 Re-evaluation of schedule

The current plan Under discussion, ASC-Labs-Collaborations (NuSTAR/PRESEPC) Meeting of AGATA, Lab directors, PAC Chairs last week GSI as the next site If GSI then: Run in LNL until June 2011 Earliest start GSI October 2011 Earliest start GANIL March 2013

Current planning Affects this grant

THANKS

The ASC The AMB

Experimental conditions and challenges Low intensity High backgrounds Large Doppler broadening High counting rates High g-ray multiplicities FAIR SPIRAL2 HIE-ISOLDE EURISOL ECOS High efficiency High sensitivity High throughput Ancillary detectors Need instrumentation

-array for Nuclear Physics Experiments at European accelerators providing radioactive and stable beams HIE-ISOLDE GANIL SPIRAL 2 FAIR Jyvaskyla AGATA LEGNARO

AGATA detector detail 42

AGATA Front end electronics Digitizers: 18 assembled (UK), 7 operational in Legnaro, 3 Turkey (need to go to Strasbourg), 5 in Strasbourg, 3 in UK to go to Strasbourg. Pre-processing in production. Will be 40 carrier cards in total. Note, 2 carrier cards needed per crystal. 6 made by Padova. 34 in production in IPNO. 25 carrier cards have been delivered (rest mid June). Under test (9 tested and working). Segment mezzanine, 110 being manufactured (CSNSM), 50 delivered (60 mid June), 33 working early June. Note, need 7 per crystal since also being used for the core. Linco (card per carrier card to transmit data to processor/PSA farm), 6 in use, 10 in production, end June. GTS: one needed per crystal, plus a few for triggering and interfacing to ancillary detectors; 20 in production (out of 35), first modules expected beginning of July. Online digital trigger installed and tested: used in the end-May test (coincidence Dante-Ge) Overall aim to have a system for two triple clusters before summer vacations (almost ready now) Test system is being built up in Orsay.

Characteristation and Scanning Comparison of real and calculated pulse shapes. Validate codes. Coincidence scan for 3D position determination Two symmetric capsules scanned in Liverpool 288keV Further scanning systems Orsay operational (A005 or A006) C001 scanning in progress in Liverpool 374keV 662keV