Trams -a new approach Free for London ?
A proposal from the Private Sector based on Work undertaken in other cities Less capital costs by value engineering Capital from Debt and Equity Operating surplus services debt Traffic management co-operation with Councils Priority for trams at junctions, as in Zurich Work undertaken in other cities Less capital costs by value engineering Capital from Debt and Equity Operating surplus services debt Traffic management co-operation with Councils Priority for trams at junctions, as in Zurich
Other Projects in hand Dublin & Limerick P & R Two commercial schemes in UK Galway (65,000)
Agreement on Need ? Ken Livingstone announcement Environment - less pollution & noise Bigger transport capacity Reliable: more passengers, less traffic Better accessibility Chance to improve the shopping scene Sustainable with renewable generation Ken Livingstone announcement Environment - less pollution & noise Bigger transport capacity Reliable: more passengers, less traffic Better accessibility Chance to improve the shopping scene Sustainable with renewable generation
Shopping Street tramways Amsterdam Zurich Nottingham Dublin
Sustainable horse traction London's first tramway, a single track of c. 1 mile along Bayswater Road to Queensway, was opened by G. F. Train's Marble Arch Street Rail Car Co. in Oxford Street Tramway 1861
Other proposals ? Sustraco –HEALTHY –ENERGY-EFFICIENT –SAFE –LOW-COST – ULR –ECONOMICAL –FLEXIBLE – ULR –ATTRACTIVE –PASSENGER-FRIENDLY –PEDESTRIAN-FRIENDLY –VERSATILE –PUBLIC FUNDING Dismissed by TfL ? Regent’s Street
Passenger volume needs a full size tramway BUT HOW TO GET IT ? Old way Get HMG permission Get HMG grant Wait 15 years ? Need subsidy This offer: Private promotion and Planning Permission Private investment Open in less than 5 years Commercial operation without grant aid ? BUT HOW TO GET IT ? Old way Get HMG permission Get HMG grant Wait 15 years ? Need subsidy This offer: Private promotion and Planning Permission Private investment Open in less than 5 years Commercial operation without grant aid ?
Tramway track installation Old Way Close to traffic (& business) for a year Dig up whole road But where to divert utilities in London ? This offer: Track laid like kerbs, one rail at a time Few utility diversions Rapid progress: 100m per week completed Old Way Close to traffic (& business) for a year Dig up whole road But where to divert utilities in London ? This offer: Track laid like kerbs, one rail at a time Few utility diversions Rapid progress: 100m per week completed
Conventional track installation Old way: Manchester Streets - 12 month closures Dig Down 3ft +
New way: LR55 track Pre cast Troughs 13in by 7in Rails only 4in deep More information:
LR55 Minimises street disruption Replaced failed track only 12 months old Sheffield since in deep 13in wide
Testing in Birkenhead Sunning in Fleetwood The affordable City Class tram Running in Blackpool 29m long = 200 passengers
What the City Class does *200 passengers *2 wheelchair spaces *Rapid acceleration (1.5m/s 2 ) *Quiet (under 60dBA) *Turns 12m (40ft) curves *29m (95ft) long & articulated *Couples into MU trains More information:
Birkenhead - The Movie
City Class v PTE Specs uSpeed 80k.p.h. 1.2 m/s² u25m minimum curve radius u6 – 8% maximum gradient u350mm floor over part of upart-level access uDoors both sides of vehicle uOverhead 750V dc supply * Choice of drive controllable 70 – 100 km/h. *1.5m/s². acceleration. controllable for other *12m track radius with 29m version *Up to 10% possible with LRV driveline layout *300mm height in low floor (70% of 29m unit) *up to 4 double doors each side of tram *Circuits adaptable to 550V – 750V dc range. PTE Specs City Class Specs
Full R & D Programme 8.5m Mock up m Prototype 1998 Slave tram 1995 New motors 2005
Fits around tight curves No corners to cut, or buildings to demolish
City Class Bendi-tram
Present Offer Proposed Route: Notting Hill Gate Marble Arch Oxford Circus Tottenham Court Road Kingsway The City Fenchurch Street Station Poplar Lime House Euston / Camden Town Waterloo / Camberwell A tram stop at each tube station and one or two in between TfL CROSS RIVER LINE
How it might be done ? Agreement with and between Councils Set up implementation company Apply for planning permission Detailed engineering designs Private capital raised Construction and commissioning Operation Company gets same fare support as buses Agreement with and between Councils Set up implementation company Apply for planning permission Detailed engineering designs Private capital raised Construction and commissioning Operation Company gets same fare support as buses
What LONDON gets: First tramway at no cost to public purse Fulfills sustainability aims Proven to get people out of cars More efficient than buses Less noise and air pollution Renewable generation = No greenhouse gases Improves Oxford Street Shopping scene First tramway at no cost to public purse Fulfills sustainability aims Proven to get people out of cars More efficient than buses Less noise and air pollution Renewable generation = No greenhouse gases Improves Oxford Street Shopping scene
What next ? Agreement to progress Implementation Company set up Submits Planning Application Consults with frontagers and community Gets agreement for delivery timetable Begins construction (from Lime House ?) Commissions and opens service (by 2012) A Win - Win offer for TfL & the Councils Agreement to progress Implementation Company set up Submits Planning Application Consults with frontagers and community Gets agreement for delivery timetable Begins construction (from Lime House ?) Commissions and opens service (by 2012) A Win - Win offer for TfL & the Councils
Proposal team led by TRAM Power Ltd Contact marketing TRAM Power Ltd Contact marketing