RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

Advanced Construction Technology
Actions and Retrofit of Post Earthquake-Damaged Bridges
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
Subpart R Steel Erection
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
Skyscraper Construction
CONSTRUCTION OF SOIL NAILING WALLS
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Concrete Pre Cast Panel By Peter Spence ID:
Foundation Systems.
Chapter 33 Foundation Systems.
Foundation Systems.
Trestle Rebuilds The Continuing Quest to Fill the Gap
Global Lift Corp ADA Laws & Commercial Series Lifts.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Chapter 18 Foundations.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Chapter 2b Foundations Shallow & Deep Foundations.
Teacher: Mark Casto Lab Assignment: Progressive Collapse of RC Structures Principal Investigator: Mehrdad Sasani.
Constructing Homes and Other Buildings
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
Building With Superior Walls Introducing The Superior Advantage.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
Introduction to a pit installation
IWM 2004 Jouko Lehtonen Jouko Lehtonen Quality Assurance of Drilled Micropiles in Finland.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Building a Deck. What must my Deck be built of??  All lumber used must be southern pine grade #2 or better  Lumber grades are bases off of the number.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
INTRODUCTION SUPPORT STRUCTURSE FORCE - LONGITUDINAL FORCE - TRANSVERS
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
BUILDING CONSTRUCTION
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Section Engineers Meeting March 6, 2014 Lexington, KY.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
The Malahide Railway Viaduct Group 15: Harry Griffin & Carl O’Sullivan.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Concrete Repair.
Quality Assurance of Drilled Micropiles in Finland
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
5th FCC Infrastructure & Operation meeting
EILERSEN The Weighing experts.
UTILITY VAULTS: THE PRECAST ADVANTAGE
4th Annual Construction Law Summit
Minuteman Vocational Technical Regional High School Progress
BASEPLATES SLIDE SHOW.
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Basic Check Link Principles
Experience the StructureCast Advantage!.
ESS Concrete Pit Lids.
Post Seismic Bridge Inspection
Presentation transcript:

RLP Installation

RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be approved before installation begins. If the scale is not installed according to the plans, utilizing good workmanship and materials, then there is no assurance that the scale owner has a good product in the ground.

RLP Foundation Requirements Current AAR guidelines require that the soil bearing capacity under the scale be 4000 PSF. This should be determined before excavation with a qualified geotechnical report, which should also include any ground improvements that may be required.

RLP Site Selection and Excavation AAR Scale Handbook requires there to be 75’ of straight, level tangent track on either side of the 25’ scale approaches. A two draft system requires 50’ approaches on either side of the scale.

RLP Forming and Rebar Placement The rebar and concrete schedules can be found on the factory supplied prints. A typical Full Draft system has over 200 anchor bolts.

RLP Foundation Pour Concrete and grout specifications can be found on the factory supplied prints.

RLP Setting Scale Sections In setting the scale, it is suggested that load cell “dummies” be installed to protect the load cells from damage. A single module has a shipping weight of over 10k and will require the need for adequate lifting equipment.

RLP Rail Installation AAR Handbook requires specific rail mitering and anti-creep hardware to be installed. This will need to be completed by a separate “Rail Contractor”.

RLP Deck and Ballast Pour Depending on the model, the deck will either be flush or standard. Both models include a concrete deck finish that also serves as added ballast and increases the overall scale weight.

RLP Checking and Load Cells The RLP uses a rigid checking system and Stainless Steel “Rocker Column” load cells.

RLP Completion and Calibration No less than 80,000 lb. (36,300 kg) may be used for track scale certification except for Interim Approval (returning a scale temporarily to service after repairs). It is highly recommended to check with the local governing body for further requirements.