Status of the Coast Guard’s MTSA Implementation CTAC Maritime Security Subcommittee March 03, 2004.

Slides:



Advertisements
Similar presentations
MediTract Contract Management Software
Advertisements

HALIFAX, NOVA SCOTIA NOVEMBER 2008 M arine Security – Fostering Global Partnerships Rear Admiral Peter Brady Maritime Authority of Jamaica Canada-Jamaica.
TurnKey Project Management Services Capabilities Briefing.
Maritime Transportation Security Act (MTSA) Towing Vessels.
Maritime Information Services of North America A non-profit maritime organization established to provide information, communications and services to ensure.
Introduction to The Maritime Transportation Security Act (MTSA) and The International Ship and Port Facility Security Code (ISPS)
U. S. Coast Guard Role and Process for LNG Mr. Alan Moore LT Dan McLean
HACCP Manager Software™
U.S. Transportation Worker Identification Credential (TWIC) Implementation Issues 7 October 2009 Intertanko NAP Houston, TX.
1 Commander Rick Raksnis U.S. Coast Guard Hazardous Materials Standards Division, CGHQ Chemical Transportation Advisory Committee.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Notice of Compliance Audit
NVIC VESSEL SECURITY PLAN OUTLINE
Top 10 Security-Related Discrepancies ///MARSEC Corporation.
Handouts Software Testing and Quality Assurance Theory and Practice Chapter 11 System Test Design
Who…What…Where…When…Why… Overview Orders & Amendments Miscellaneous Transportatio n Receipts Lodging Receipts All Other Receipts Printing Instructions.
Performance Management Training Governor’s Office of Planning and Budget 1.
Relgo Networks, Inc. Jubilee Hills, Hyderabad Realty Enterprise Resource Planning (ERP)
Petrochemicals in harbor areas; safety supervision and emergency response Presented by Captain David Murk U.S. Coast Guard Senior Maritime Advisor to the.
Classification Societies – Contribution to Martime Safety Gesa Heinacher-Lindemann LL.M., Legal Director.
May 17, 2005 E-sign Web Forms replace Paper Forms Presented by: Bob Schneider Western Washington University.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
Online Learning 1 Marine Facility Personnel with Security Responsibilities Canaport LNG
EaTIS Vendor Training - FY EaTIS Training for Vendors – Process Overview EaTIS Version 3.01 Last Modified on April 5, 2007.
1 ENC Encryption/ISO Julia Powell Office of Coast Survey Marine Chart Division.
Role-Based Access Control Project
U.S. Department of Agriculture eGovernment Program August 14, 2003 eAuthentication Agency Application Pre-Design Meeting eGovernment Program.
U.S. Transportation Worker Identification Credential (TWIC) Implementation Issues 23 March 2009 Intertanko NAP Stamford, CT.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
U.S. Coast Guard ISPS Code Implementation. Maritime Transportation Security Act of 2002 (MTSA)  Signed into law on November 25, 2002  Six Temporary.
Transportation Worker Identification Credential (TWIC) Reader Requirements April 25, 2013 MST3 Lawson Boring.
1 Transportation Worker Identification Credential (TWIC) What you should know LT Fran Smith CWO Alan Guedesse.
IRB Electronic Submission. IRB Definition Committee formally designated to approve, monitor, and review biomedical and behavioral research involving human.
U.S. Department of Agriculture eGovernment Program July 15, 2003 eAuthentication Initiative Pre-Implementation Status eGovernment Program.
Training Monday, February 04, Tuesday, October 20, Training Welcome to the Travel Expense Processing Course.
Transportation Worker Identification Credential (TWIC) Guidance for TWIC Reader Pilot Program November 19, 2007.
1 IMPLEMENTATION OF ISPS CODE IN GRENADA Inter-American Committee on Ports Third Hemispheric Conference on Port Security Punta Cana, Dominican Republic.
MARITIME SECURITY STATUS REPORT JOSEPH ANGELO U.S. COAST GUARD.
How to Use Online Registration – Student Quick Reference Guide This quick reference guide contains step by step instructions on how to: 1.Register online.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
Successful Invoicing Training for Success September – October 2006 Schools and Libraries Division Washington, DC Boston Seattle St. Louis.
Major Information Flows in the Production Process
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
INTERTANKO LATIN AMERICAN PANEL MARITIME SECURITY: LATEST DEVELOPMENTS LATEST DEVELOPMENTS AT IMO JOSEPH J. ANGELO DIRECTOR, REGULATORY AFFAIRS AND THE.
February 5, 2008 Sector San Francisco Worker- Facility Access Final Report.
PrevNext | Slide 1 Michigan Electronic Grants System September 10, 2009 IMPROVING TEACHER QUALITY APPLICATION Created:
The system PROBLEM 1 FEIO Poor loading Insufficient number of facilities Small number of parameters Unaccountable methodology for taxes calculation Poor.
The Benefits of Mobile Electronic Inspection Tools 12/11/2015 Presented to:
Authentication Presenter Meteor Advisory Team Member Version 1.1.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Hazardous Substance Response Plan Regulations Lieutenant Eric A. Bauer, USCG Office of Response Planning & Preparedness Division Industry Preparedness.
4. Select Student Services & Financial Aid Menu and Click on Online Registration menu How to Use Online Registration – Student Quick Reference Guide This.
American Diploma Project Administrative Site Training.
American Diploma Project Administrative Site Training.
BWM Updates William Burroughs |February 23, 2017 Houston, TX.
Merchant Mariner Licensing & Documentation
Transportation Worker Identification Credential (TWIC)
Merchant mariner shore side access requirements for mtsa facilities MST2 Jeromy Cowell MSD Sturgeon Bay.
Vessels and Facilities that are Temporarily Out of Service or Laid-up
TWIC Compliance MERPAC Meeting April 17, 2009 LT Devon Brennan
FACILITY SECURITY PLANS (FSP’s)
Regulatory Updates & Safety Alerts
Merchant Marine Personnel Advisory Committee (MERPAC) Transportation Worker Identification Credential (TWIC) Update September 12, 2007 LCDR Jon Maiorine.
TWIC Implementation Update
Know Your Revised Alternate Security Program (ASP) Jen Wilk
Alternative Security Program
Top 10 Security-Related Discrepancies
Maritime Transportation Security Act (MTSA)
Maritime Information Services of North America
Presentation transcript:

Status of the Coast Guard’s MTSA Implementation CTAC Maritime Security Subcommittee March 03, 2004

Agenda n Policy Interpretation Process n Communication of Policy Interpretations n Helpdesk Statistics n Plan Review Status n Facility Plan Review Process n Vessel Plan Review Process n ASP Plan Review Process n Checking the Status of Your Security Plans

Policy Interpretation Process

MTSA/ISPS Helpdesk Website

MTSA/ISPS HELP DESK STATISTCS n In 19 weeks of operation the Helpdesk has: –Had 27,295 hits on our Internet website –Had 11,033 hits on our Intranet website –Received and responded to 625 s –Received and responded to 1186 phone calls

Plan Review Status n n As of Feb. 2, nationwide over 90 percent of the plans have been received. n n We have received about 7600 vessel plans and 2800 facility plans. n n Originally estimated that 10,000 vessels, 5,000 facilities and 40 outer continental shelf facilities n n Current estimates are that about 8,500 vessels and 3,200 facilities had to submit plans.

Project Philosophy n Central Review Center with Regional support –Overland Park, KS – NFSPRC –Washington DC – East Regional –Houston, TX – Gulf Regional –Concord, CA – West Regional

n Document Flow –National FSP Review Center receives reports. –USCG Initial Activities n Initial Applicability Review n Identify Facility Type n Identify COTP Zone n Assign FIN n MISLE Input and activity number assignment –B&V Initial Activities n Reports are assigned to review team for stage 1 review. n FSP’s identification & tracking data entered into B&V database system. Facility Plan Review Process - Process

n Document Flow - Continued –Stage 1 Review n All Stage 1 reviews occur in KC –Stage 2 Review n Stage 2 reviews occur in KC or are reassigned to regional offices. Plan Review Process - Process Facility Plan Review Process - Process

n Structure of Review Teams & Offices –Petro/Chem Facilities –West Coast Containers Facilities –East Coast Containers Facilities –OCS Facilities –Barge Fleeting –Cruise Ship Facilities –Passenger and Ferry –CDC Facility Plan Review Process - Process

n Tools & Aids –Three stage review process n Stage 1 - Cursory review to flush out poor reports n Stage 2 – Detailed review of plan to see if it meets the regulations. n Stage 3 – COTP review –Validate portions of plan that require local knowledge. –Verify assessment information against physical characteristics. Facility Plan Review Process - Process

n Typically, there is an insufficient amount of detail in the FSP on the following: –Access control –Definition of restricted areas within the facility –Coordination between vessels and facilities. –At elevated MARSEC Levels - What will the additional security personnel will be doing? n Define increased number of guards n Define Frequency of patrols –Screen per latest MARSEC Directive Facility Plan Review Process – FSP Observations

Vessel Plan Review Process n VSP review process is diagrammed in a flowchart contained in the VSP NVIC (NVIC 04-03) n Three-stage review process n First, login and enter the relevant information into MISLE n Documents plan receipt and establishes an open inspection case w/MISLE Activity number n Stage I: quickly review, identify, and return any plan that is not complete n Goal is to return incomplete plans to the submitter within 30 days of receipt n Stage II: process involves comprehensive review against reg requirements n Stage III: Coast Guard’s quality assurance review, including plan approval. (Copy of letter provided)

Alternative Security Program Review Process (for domestic vessels on domestic routes) n Vessel owner/operator submits letter to MSC stating that vessels will comply with a specific ASP approved by G-MP n MSC’s role after receiving the owner’s ASP certification letter: 1) Enter relevant information into MISLE 2) Verify the stated ASP is applicable to the vessel type 3) Verify the owner or operator is a member of the stated ASP organization 4) Verify SOLAS is not applicable to the vessel 5) Generate ASP acknowledgement/acceptance letter (Copy attached) 6) Acceptance based on implementation of the ASP in its’ entirety, otherwise the vessel owner or operator will need to submit a VSP 7) Scan MSC letter & owner’s letter(s) into MISLE, mail letter to owner

Status of Vessel and Facility Security Plans at

Question & Answers